KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  12-19-2014
Number of Hours:  10.00
Manual Reference:  Roncz B sheet
Brief Description:  Trial Elevator setup 1

My first setup attempt was to get the four jigs out and glue them with 5 mt epoxy to the canard base. Then I set up the elevator with the hinges loosly in the slots using the jigs to assume I was all correct. I again used the 5mt araldyte and mixing sticks to secure the hinges.

Of course I first spent ages tweaking the slots, playing with the depth and so on, it goes without saying. ...oh and I was still tweaking them a day later...

After a couple of attempts at this I let it all cure and then expected to see the correct range of elevator movement. HA!

Nope, not even close. As the sun had set for the day and I was out of ideas and thought it a good time to leave things alone and try again tomorrow.
' style=

First Jigging attempt

First Jigging attempt

' style=

Hinges secured

Hinges secured

' style=

Jigs and hinges test setup

Jigs and hinges test setup

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.