KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  9-1-2012
Number of Hours:  10.00
Manual Reference:  6-4
Brief Description:  Floor Prep ver2

Having cut out my first go at the floor the foam finally arrived from China for a second attempt.

This time it was more straight forward. I knew what to do. Here I've cut the foam block in half. Drawn a center line and then placed it on the fuselage with weights and marked out positions as shown in the first pic.

The last pic shows that I've lined things up and this time put a straightner on the lower instrument panel as it tends to warp or bow. Just one less thing to think about during the glue process.
' style=

Floor marked out

Floor marked out

' style=

Checking positions

Checking positions

' style=

I.P. straightner

I.P. straightner

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.