KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  8-24-2012
Number of Hours:  10.00
Manual Reference:  9-1
Brief Description:  Last 4 Plys tortional gear layups

With everything ready and the gear turned over and secured the last 4 plys of the 8 ply layup were completed. It still took a good 6.5 hours and again the room was preheated to 26-27C.

I peel plyed at the end as I'm planning on a fairing and there is still the relief tube and brake line layup to go at the edges.

Overall it worked out well. I had a lot of trouble getting my head around this whole layup but was determined to have a good procedure as its not something I'd enjoy doing twice.
' style=

Wetted out and inspected

Wetted out and inspected

' style=




' style=

8 plys done

8 plys done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.