KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  7-18-2012
Number of Hours:  10.00
Manual Reference:  6-5
Brief Description:  Floor prep

It takes quite a while to get the glass layed out and cut. Couple of days...

I like to get it on the piece dry and line up the bias correctly, then take the outer edges and cut well oversized. The floor needs two plys of BID each with two pices at 45 degrees. A third ply is also needed for the back seat area.

The peel ply is also planned out and pieces cut ready to go. I write out a layup plan step by step so nothing is forgotten.

The third pic was actually after I layed the glass after the micro the next day but positioned here to show you waht things look like. That tiny little credit card in the left forground is my main tool for spreading the epoxy.
' style=

Laying out the glass

Laying out the glass

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.