KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  7-16-2012
Number of Hours:  10.00
Manual Reference:  6-5
Brief Description:  Build a curve into the floor

This step is securing the jig to the floor while it is in position just sitting on the fuselage.

Using clamps, bungy cord and weights I bent the floor to the right contour. Then blocks of wood were screwed to the sides of the jig and glued to the floor with 5 minute epoxy. This was at the edges which will be contoured anyway later.

Once everything was set up the floor was easily removed and placed on the bench with the curve intact.
' style=

Floor clamped to the contour.

Floor clamped to the contour.

' style=

Clamps and elastic rope

Clamps and elastic rope

' style=

Floor held in it's curve

Floor held in it's curve

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.