KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  1-18-2024
Number of Hours:  10.20
Manual Reference:  25-01
Brief Description:  Epoxy wipe port wing/strake, gear legs & cowlings

WIPE with raw epoxy the port wing upper surface, repair bits on the lower, winglet, port strake top, both main landing gear upper surfaces, the remainder of the fixed turtleback and both cowlings. 5 coats that took about 2 hours each, with tiny break between.

34 pumps of epoxy in total!
' style=

All shiny.

All shiny.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.