KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
Work Logs Found: 117
Category Work Time: 299 Hours
 Date
Hours
Work Log Summary

Details

 08-30-2023
1.00
Profile sanding canopy frame and odd jobs
Details
       

 03-18-2023
4.50
Canopy latches - connecting up!
Details
       

 03-09-2023
1.00
Exterior canopy latch handle
Details

 03-07-2023
4.50
Exterior canopy latch handle
Details
       

 02-19-2023
4.50
Canopy latches
Details
       

 02-16-2023
3.50
Canopy latches
Details
       

 02-04-2023
4.00
Canopy latches
Details
       

 02-01-2023
1.00
Gas strut longeron mounting plates
Details
       

 01-25-2023
2.00
Installing canopy frame
Details
       

 01-24-2023
3.40
Bolting up canopy hinge brackets
Details
       

 01-23-2023
1.80
Bolting up canopy hinge brackets
Details
     

 01-22-2023
2.30
Canopy hinge brackets, the conniptions return
Details
       

 01-21-2023
2.00
Installing hinge brackets to canopy frame
Details
     

 01-20-2023
1.00
Canopy Hinge Conniptions continued
Details
       

 12-26-2022
2.20
Canopy Hinge Conniptions
Details
     

 12-18-2022
4.00
Fabricating canopy hinges
Details
       

 05-14-2022
2.00
Canopy frame drip rail drain
Details

 02-25-2022
2.00
Canopy latches
Details
     

 11-13-2021
2.80
Profiling canard fill
Details
       

 11-06-2021
2.00
Cabin air vents
Details

 11-02-2021
0.80
Cabin air vents
Details
       

 11-01-2021
1.00
Cabin air vents
Details
       

 10-31-2021
1.20
Cabin air vent ducting and canard fill
Details
     

 10-30-2021
2.00
Cabin air vent ducting and canard fill
Details
       

 10-28-2021
2.00
Cabin air vent ducting and canard fill
Details
       

 10-24-2021
1.20
Cabin air vent ducting and canard fill
Details
       

 10-21-2021
1.00
Front cabin air vents
Details
     

 10-20-2021
5.00
Canopy frame fill profiling, more vents
Details
     

 10-07-2021
3.50
Profiling canopy frame fill, more vents
Details
       

 10-04-2021
1.80
Fill fuselage around canopy frame
Details
       

 10-01-2021
1.40
Front cabin air vents
Details
       

 09-28-2021
3.00
Front cabin air vents
Details
       

 09-27-2021
3.20
Filling canopy frame
Details
       

 09-26-2021
6.00
Setting the frikken edge gaps around the nose
Details
       

 09-21-2021
2.00
Canopy rear catches, and profiling nose
Details
       

 09-05-2021
0.90
Canopy forward lip and fuselage top
Details
       

 09-04-2021
1.10
Canopy forward lip
Details
       

 09-03-2021
4.10
Canopy frame edge and drip rail take #2
Details
       

 09-02-2021
2.30
Canopy frame edge and drip rail take #2
Details
       

 09-01-2021
3.10
Canopy and canard lips
Details
       

 08-31-2021
2.60
Canopy and canard lips
Details
       

 08-26-2021
2.30
Canopy and canard cover lips
Details
       

 08-19-2021
1.90
Canopy and canard cover lips
Details
       

 08-15-2021
1.80
Fuselage top installation
Details
       

 08-11-2021
1.00
Fuselage top installation
Details
     

 08-10-2021
1.10
Fuselage top installation
Details
       

 08-09-2021
1.00
Canopy frame opening cut layups
Details
     

 08-08-2021
3.10
Canopy frame opening cut layups
Details
       

 08-07-2021
4.00
Canopy frame opening cut
Details
       

 06-13-2021
4.20
Cutting turtleback windows
Details
       

 06-08-2021
0.90
Canopy flange
Details
       

 06-02-2021
2.00
Window flange profiling
Details
     

 05-30-2021
4.10
Canopy frame internal layup
Details
       

 05-29-2021
4.10
Canopy frame internal layup
Details
       

 05-25-2021
1.20
Canopy frame hardpoints
Details
       

 05-23-2021
1.20
Canopy frame hard points
Details
       

 05-21-2021
2.00
Canopy safety catch
Details

 05-16-2021
3.00
Canopy frame hinge hard point disaster recovery
Details
       

 05-15-2021
0.20
Canopy frame hinge hard point #2
Details

 05-13-2021
1.30
Canopy hinge hard point disaster recovery
Details
       

 05-12-2021
0.70
Canopy hinge hard point disaster recovery
Details
       

 05-11-2021
0.40
Canopy frame hinge hard points
Details
     

 05-08-2021
2.40
Canopy internal shaping and hinge hard point layup
Details
       

 05-06-2021
1.00
Canopy frame internal shaping and hard points
Details
       

 05-04-2021
1.00
Canopy frame internal shaping and hard points
Details
       

 05-03-2021
2.70
Canopy frame outer skin
Details
       

 05-02-2021
2.60
Canopy frame outer skin layup
Details
       

 05-01-2021
2.00
Canopy frame outer skin prep
Details
       

 04-25-2021
2.70
Canopy frame outer frame skin prep
Details
       

 04-24-2021
1.70
Canopy flange
Details
       

 04-23-2021
2.00
Canopy flange
Details

 04-22-2021
0.90
Canopy frame
Details
       

 04-21-2021
0.80
Canopy final trim
Details
       

 04-16-2021
1.80
Various window creations
Details
       

 04-07-2021
1.10
Canopy middle trim
Details
       

 04-02-2021
4.40
Canopy initial trim
Details
       

 04-01-2021
1.50
Canopy trimming
Details
       

 10-30-2020
5.00
Canopy frame shaping
Details
       

 10-11-2020
8.00
Canard cover/canopy frame
Details
       

 09-24-2020
4.10
Canopy frame/canard cover
Details
       

 09-20-2020
3.00
Canopy frame boards
Details
     

 09-09-2020
2.00
Wing Ding Cleco
Details
       

 06-30-2020
0.50
Inside upper engine mount hardpoint
Details
     

 05-07-2020
0.50
Upper engine mount reinforcement
Details
       

 05-05-2020
0.20
Upper engine mount reinforcement
Details

 02-08-2020
3.50
Turtleback drip rail
Details
       

 02-07-2020
2.00
Turtleback taping
Details
       

 02-02-2020
3.50
Turtleback inner taping
Details
       

 01-31-2020
0.60
Turtleback inner taping
Details

 01-30-2020
1.80
Turtleback drip rail and inner taping
Details
       

 01-28-2020
2.40
Turtleback drip rail
Details
       

 01-27-2020
3.50
Upper engine mount reinforcement
Details
       

 01-22-2020
1.20
Turtleback separation
Details
     

 01-19-2020
2.00
Firewall structural completion
Details
       

 01-17-2020
3.30
Turtleback install
Details
       

 01-16-2020
3.30
Turtleback outer skin
Details
       

 01-15-2020
2.00
Turtleback flange
Details
       

 01-14-2020
3.30
Turtleback outer skin prep
Details
       

 01-13-2020
2.30
Turtleback mounting
Details
       

 01-12-2020
4.50
Turtleback outer skin prep
Details
       

 01-09-2020
4.50
Turtleback outer skin prep
Details
     

 01-08-2020
8.70
Turtleback recovery
Details
       

 01-05-2020
2.10
Turtleback release from form
Details
       

 01-04-2020
3.00
Install Turtleback bulkhead
Details
       

 01-03-2020
6.00
Turtleback bulkhead and driprail
Details
       

 01-02-2020
2.90
Turtleback Bulkhead and cutline
Details
       

 01-01-2020
2.40
Turtleback inside skin layup
Details
       

 12-31-2019
0.40
Taping Turtleback foam joins
Details
     

 12-30-2019
4.00
Fitting Turtleback foam to the form
Details
       

 12-29-2019
5.90
Turtleback form
Details
       

 12-28-2019
8.30
Turtleback form
Details
       

 12-27-2019
3.30
Turtleback Form/Firewall
Details
       

 12-26-2019
3.30
Turtleback jig design
Details
       

 12-26-2019
4.80
Canopy planning
Details
       

 12-24-2019
3.20
Canopy planning
Details
     

 06-30-2018
0.50
FHC canopy figgerings
Details
     

 06-15-2018
2.00
Basic Figgering for Front Hinged Canopy
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.