Date:  1-26-2018
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Prop governor clocked and cable end checked. Inst

Prop governor clocked and cable end checked. Removed and reinstalled governor to address lower left stud. Double nutted it and drove it in the same distance as the others: nominal = 1.25" Installed controls for Prop, Oil Cooler butterfly valve, alternate air. Also checked slip/skid ball - it is off, but most of that is my garage floor not being very level. I added about 3/4" shim under the left main and then the spar was level. Checked against two Smart Levels and a bubble and they are accurate. When levelled laterally the ball is only slightly off. I may or may not address it as the error is very slight. But easierr to do now. Will sleep on it.