Work Logs Found: 269
Category Work Time: 673 Hours
 Date
Hours
Work Log Summary

Details

 05-29-2018
1.00
Move completed
Details
       

 05-28-2018
6.00
Moving Day
Details
       

 05-20-2018
6.00
Coat of K38 primer to cowling, spinner installed,
Details
       

 05-01-2018
2.00
Firewall barrier and proseal canopy seal area
Details

 02-20-2018
4.00
Forward top skin riveted!
Details
       

 02-20-2018
3.50

Details

 02-17-2018
1.00
Forward Central Tunnel Covers
Details
       

 02-01-2018
0.50
Installed N-numbers on tailcone
Details
       

 01-23-2018
0.50
Vent tubing insstalled for NACA fresh air ducts
Details

 05-09-2017
1.50
Installed brake lines, new fuel pump line
Details

 05-08-2017
1.00
Riveted F-723 Cabin Frame Channel Ass'y
Details

 05-04-2017
1.00
Canopy latch installed, flap motor installed, FWD
Details

 05-03-2017
2.00
Final installed rudder pedals, parking brake/lines
Details
       

 05-02-2017
2.00
Installed interior items (Cabin Frame, Spar/Gear r
Details
       

 04-30-2017
2.00
Finished painting - touch up and removed masking
       

 04-29-2017
10.00
Painted Fuselage interior JetFlex WR Basic Gray.
Details
       

 04-27-2017
3.00
Cut flap rod holes. Central tunnel and FW adels.
Details
       

 04-26-2017
1.00
Removed all cabin items, getting ready for paint.
     

 04-23-2017
2.50
Prosealed NACA vents, main fuel line from pump to
Details
       

 04-22-2017
8.00
Fuel Line Fabrication
Details
     

 04-21-2017
1.00
Fuel Line Fabrication started
Details
       

 04-19-2017
1.00
Drilled and riveted rudder cable fairing
Details
     

 04-16-2017
6.00
-4 (3003) vent and brake lines fabricated.
Details
       

 04-12-2017
3.00
Throttle/Prop/Mixt cable pass thrus drilled.
Details
       

 04-11-2017
1.00
F-774 aft top skin riveting complete
Details
       

 04-10-2017
0.50
Brake Cable Mount Fabricated
Details

 04-09-2017
5.00
F774 Top Skin Riveted
Details
     

 04-01-2017
9.00
Finished Riveting aft fuselage - all and ADAHRS mo
Details
       

 03-31-2017
2.00
Riveting on F775 Rear Top Skin

 03-19-2017
1.00
Rudder pedals, helper springs added, AN fittings i
Details
     

 03-17-2017
0.50
Rudder Pedals - sprayed additional coat of white
Details

 03-17-2017
0.50
Cabin Frame - drilled pilot holes on frame and aft
Details
     

 03-15-2017
3.00
Cabin Frame Support - drilled small brackets/brace
Details
       

 03-15-2017
3.00
Cabin Frame - Drilled frame to main brackets, CSK
Details
       

 03-14-2017
2.50
Cabin Frame - Drilled brackets to fuse and deburre
Details
       

 03-10-2017
2.00
Cabin Frame - completed primary structure
Details
       

 03-09-2017
2.50
Cabin Frame - deburred holes and riveted joint pla
Details
       

 03-08-2017
3.50
Cabin Frame - redid edges on all flanges. Made 7/
Details

 03-07-2017
2.00
Cabin Frame - drilled strips & splice plate to AFT
Details
       

 03-06-2017
2.50
Cabin Frame - drilled Access holes and deburred al
Details

 03-05-2017
1.00
Cabin Frame filing for alignment. Fabricated jig.
Details
     

 03-04-2017
1.00
Removed extra tabs from weldment and filed.
Details

 03-03-2017
2.00
Rudder Pedals - riveted and brake arms drilled
Details
       

 03-02-2017
2.50
Rudder Pedals - drilling, deburr and prime.
Details

 03-01-2017
2.00
Rudder Pedals - deburring and cabin frame angle de
Details

 02-28-2017
1.50
Cabin Frame mounts cut and sanded. Rudder pedal d
Details
     

 02-27-2017
3.00
Finished deburring of flanges
Details
       

 02-26-2017
1.50
Deburring of flanges
Details

 02-25-2017
2.00
Cut lightening areas in FWD flanges.
Details
       

 02-24-2017
4.00
Drilled all remaining holes for lightening, measur
Details
     

 02-22-2017
3.00
Made small side pieces and drilled mounting holes
Details

 02-21-2017
1.00
fabricated .020 spacers and drilled
Details

 02-16-2017
1.00
Mounted seats and FWD Bulkhead, started cowl mount
Details
     

 02-15-2017
4.50
Drilled all seatback holes, deburred, primed & riv
Details
       

 02-14-2017
3.00
Cut 2.5" holes in support. Cut/Deburred tall angl
Details

 02-13-2017
1.50
Filed and Deburred seatback angles.
Details

 02-12-2017
4.00
Riveted F-768-A/L and F-643 to F768-A. Made canop
Details
       

 02-10-2017
4.00
Assembled Panel and FWD Deck. Riveted F-745 angle
Details

 02-09-2017
3.00
New F-745-R fabricated, panel nutplates installed.
Details

 02-08-2017
2.00
Finished deburring panel and riveted angles/nutpla
Details

 02-07-2017
2.00
CSK panel reinf and deburred flanges. Pilot holes
Details
     

 02-06-2017
3.00
Fabricated /Drilled Canopy hinge blocks
Details

 02-05-2017
5.00
Completed deburring of FWD bulkhead parts.
Details

 01-31-2017
2.50
Deburring of FWD bulkhead parts.

 01-30-2017
1.50
Drilled T/U seals, drilled NP holes for F745 panel
Details
     

 01-29-2017
1.00
Removed FWD Bulkhead Assembly. Measured C-617/C-1
Details

 01-28-2017
4.00
Deburred T/U seal & Panel Reinf. Drilled Panel fla
Details

 01-27-2017
2.50
F-697 Hat Section Cut/Drilled & F643 center rib an
Details
     

 01-26-2017
2.00
Drilled & Cut Angles for T/U seal and panel reinf
Details

 01-25-2017
4.50
Fab'd seatback angles, tip up seal, panel refinf a
Details

 01-24-2017
1.50
Riveted vent bracket and F-721B FWD canopy decks
Details
       

 01-23-2017
1.00
Final fit of vent bracket, nutplate holes drilled
Details
       

 01-22-2017
1.50
Fabricated/Drilled air vent supports to side skins
Details
     

 01-21-2017
1.50
jigged and drilled new F745 ribs/brackets to F786
Details
       

 01-19-2017
1.00
2 deg bend in F768 subpanel. Fabricated angle bra
Details
     

 01-18-2017
1.50
Trimmed F-745-L/R ribs and measured/drilled new lo
Details

 01-13-2017
1.50
Carbon Panel Trimming and Initial Fit/Install
Details
       

 01-12-2017
1.00
Carbon Panel Subframe - inserts drilled
Details

 12-14-2016
1.00
Riveted F-721C/D angles to F-721A fwd canopy decks
Details
       

 12-13-2016
1.00
Fabricated F-703C and F-721C/D angles
Details

 12-12-2016
1.00
Rivated F-704K cap strips
Details
       

 12-11-2016
5.00
Canopy Decks and F757s riveted. Tail removed.
Details
       

 12-08-2016
8.00
Control System Installed
Details
       

 11-30-2016
1.00
Deburred, primed and riveted small elevator pushro
Details

 11-29-2016
1.50
Drilled Tailwheel Assembly to Rod, installed bolts
Details
       

 11-28-2016
0.50
Final wire to rudder nav/strobe and elevator pushr
Details

 11-26-2016
3.00
Reamed new tailwheel assembly on lathe
Details
     

 11-20-2016
0.50
Reinstalled empennage
Details
       

 11-19-2016
3.00
Installed FWD seat floors and flap assembly, bagga
Details
       

 11-18-2016
4.00
Wiring runs continued: ELT antenna, pitot/static/
Details
       

 11-17-2016
3.00
Wiring Runs: Pitch Trim, Nav/Strobe/ADSB Ant
Details
       

 11-16-2016
4.00
Riveted all cabin small parts, riveted seat hinges
Details
       

 11-15-2016
3.00
Primed all forward/top parts, initial riveting and
Details
       

 11-14-2016
1.00
Installed forward lower conduit
Details
     

 11-13-2016
3.00
Aft conduit mounts fabricated and drilled
Details
     

 11-12-2016
1.00
Deburring forward cabin components - finished!
Details

 11-11-2016
3.00
Deburring forward cabin components - cont'd
Details

 11-10-2016
1.00
Deburring forward cabin components - cont'd
Details

 11-09-2016
5.50
Deburring forward cabin components - cont'd
Details

 11-08-2016
1.00
Deburring forward cabin components
Details

 11-06-2016
2.00
Shoulder harness - F-706/F-751/F-652 UHMW pass thr
Details

 11-05-2016
2.00
Top skin edge deburring - both skins
Details

 11-03-2016
1.00
Forward cabin - underseat/baggage conduit drilled
Details

 11-01-2016
2.00
Floor - seatback hinge fabrication.
Details

 10-29-2016
2.00
Forward tunnel cover fabrication, drilling and csk
Details
     

 10-28-2016
2.00
Andair Fuel Valve work.
Details
       

 10-27-2016
2.00
Drilled new baggage floors. Drilled center flap b
Details
       

 10-24-2016
3.00
Flap housing drilled, WD-613 flap weldment holes r
Details

 10-23-2016
1.00
Drilled tailcone inspection panels and installed n
Details

 10-22-2016
6.00
ELT bracket drilled to mount/fuselage, F-706 nutpl
Details
     

 10-21-2016
1.00
ELT bracket drilled to mount/fuselage
Details
       

 10-18-2016
1.00
Drilled fuel pump/center covers - final fit
Details
     

 10-17-2016
1.50
Drilled fuel pump covers
Details

 10-16-2016
2.00
Baggage Bulkhead Covers Drilled and Trimmed
Details
     

 10-15-2016
1.50
Rudder Stops adjusted and riveted.
       

 10-14-2016
2.00
Drilled 2 aft skins, drilled FWD top skin, F-707B
Details
       

 10-11-2016
1.50
Drilled aft top stringers F-786L/R. Drilled and r
Details

 10-10-2016
2.00
Riveted F-781 VS attach plate and filed elevator s
Details
       

 10-09-2016
3.00
Finished VS Mounting
Details
       

 10-08-2016
2.00
VS initial alignment and drilling aft spar to F-71
Details

 10-07-2016
3.00
Drilled HS to fuselage - fore and aft spars.
Details
       

 10-05-2016
1.00
FWD upper fuselage structure drilled
Details
       

 10-04-2016
0.50
Drilled upper fwd fuselage. Riveted F-902s to long
Details

 10-01-2016
2.00
Riveted F-695 gussets. Drilled 2 aft F-695s to bu
Details
       

 09-30-2016
2.50
Drilled F-695 gussets to longerons and FW
Details
     

 09-29-2016
0.50
Finished riveting aft deck and deburred F-757 hole
Details

 09-26-2016
2.00
F-757s drilled, aft deck deburred and riveted
Details
       

 09-25-2016
3.00
Fabricated and drilled new F-712 aft elev stop and
Details
       

 09-24-2016
1.50
Drilled FWD95 elevator stop and deburred F-695s
Details

 09-23-2016
3.00
Finished Fuselage Riveting and Flipped the Canoe!
Details
       

 09-22-2016
3.00
Riveted FWD fuselage remaining and center section
Details
     

 09-18-2016
0.50
Finished riveting two outboard floor stiffeners wi
Details
     

 09-17-2016
1.50
Firewall prep and forward section riveting.
Details

 09-16-2016
3.00
Forward side skins riveted to angles and F-772 flo
Details
       

 09-15-2016
2.00
More Forward Section riveting.
Details
       

 09-14-2016
2.50
Riveting forward fuselage
Details

 09-13-2016
3.00
F-704 riveted - #30 and #40 entire length. F706 t
Details

 09-12-2016
2.00
Initial forward section riveting
Details
       

 09-11-2016
6.00
Moved fuselage components to garage and re-assembl
Details
       

 09-10-2016
5.00
Primed all remaining forward fuselage parts and mo
Details
       

 09-09-2016
4.00
Deburred and dimpled F-770 side skins, and upper f
Details
       

 09-08-2016
2.50
F-772 forward skin deburred, rolled edges on F-772
Details

 09-07-2016
3.50
Countersunk both F-718 longerons
Details
       

 09-06-2016
1.00
Riveted F-902 to F-7101 and F-684 gussets
Details
       

 09-05-2016
6.00
Deburring, Dimpling and Final Fabrication of Aft D
Details
       

 09-04-2016
2.00
Deburring, Dimpling and Fabrication of Aft Deck it
Details

 09-03-2016
8.00
Deburring/Dimpling/CSK and priming
Details
       

 09-02-2016
3.50
Deburring/Dimpling
Details
     

 09-01-2016
3.00
Disassembly and Deburring Begins
Details
     

 08-26-2016
2.00
Drilled Skybolt FW fastener mounting strips. Dril
Details
       

 08-22-2016
1.00
Began FW strips for Skybolt fasteners
Details

 08-21-2016
2.00
Baggage area bulkhead - fab of lower flanges and a
Details
       

 08-19-2016
2.00
Redo of F-710-B angle
Details
       

 08-18-2016
3.50
Fabricated/Installed F-782D angles to forward cove
Details
       

 08-17-2016
1.00
Drilled F-6115 center rudder bearing block to rudd
Details
       

 08-16-2016
2.00
Rudder Blocks Drilled
Details
       

 08-14-2016
3.00
Forward stiffeners, and CSK #12 hole for tank brac
Details
       

 08-13-2016
2.00
Tank Bracket Installed
Details
       

 08-12-2016
2.00
Fabricated F-796C/D brackets
Details

 08-11-2016
4.00
Final fabrication and drilling of F-684 gussets an
Details
       

 08-10-2016
2.50
F902's installed, lower longerons/gear webs drille
Details
       

 08-08-2016
1.00
Fabricated F-684 gussets
Details
     

 08-08-2016
1.00
Drilled F717 lower longeron to WD-603 weldment to
Details
       

 08-07-2016
1.50
Initial Drilling of lower longeron to wedment.
Details

 08-06-2016
2.00
Drilled fuel vents, fuel line holes, radiused bott
Details

 08-05-2016
2.00
Twisted lower longerons and marked, gear webs dril
Details
       

 08-03-2016
3.00
F719 stiffeners completed, gear web started, lower
Details
       

 08-02-2016
2.00
New F719s drilled and clips started for fore/aft
Details

 08-01-2016
2.00
F-719 stiffener work
Details

 07-31-2016
10.00
Firewall drilled to skins, longerons to weldments
Details
       

 07-30-2016
1.50
Longeron twist tweaking and mounted firewall
Details
       

 07-29-2016
2.50
Trimmed longeron ends; installed F904L attach stri
Details
       

 07-28-2016
1.50
Longeron drilling complete to firewall.
Details
       

 07-27-2016
3.00
Drilled Longerons F-704 and aft
Details
       

 07-07-2016
2.00
Match drilled all holes aft of and including F-704
Details
     

 07-06-2016
2.50
Tweaked fwd longeron bends and F770 conical bends
Details

 07-05-2016
2.50
Conical Bends at Aft/Center fuselage interface, ad
Details
       

 07-03-2016
2.00
Clecoed F770 side skins to fuselage, clamped longe
Details

 06-30-2016
2.00
Aileron Trim Kit assembled/test mounted
Details
       

 06-29-2016
2.00
Riveted F715 end seat ribs and tested longeron
Details
       

 06-28-2016
2.50
Deburred/dimpled F715 seat ribs and F776 skin, sea
Details

 06-27-2016
0.50
Reorganized shop and reconfigured sawhorses
Details
       

 06-27-2016
2.00
Drilled F715 ribs to F776/F704/H, drilled floor sk
Details
       

 06-26-2016
4.50
Riveted F776 skin to center section structure
Details
       

 06-23-2016
2.00
AN3/AN4 bolts torqued to F704 assembly, clecoed F7
Details
       

 06-22-2016
4.00
Riveted center section structure.
Details
       

 06-21-2016
1.50
Riveted all NPs on F716s and forward cover support
Details

 06-20-2016
3.50
Prepped and primed all center section parts
Details
       

 06-19-2016
2.00
VHF comm mounts fabricated. F776 debur & dimple
Details
     

 06-18-2016
0.50
Deburred F776 edges
Details

 06-17-2016
2.00
Misc center section tasks
Details

 06-16-2016
3.00
Drilled Crotch Strap Brackets
Details
       

 06-15-2016
1.00
Fabricated and drilled F623A AFT straps.
Details
       

 06-14-2016
1.50
Drilled, Cut, Deburred F-623 holes and ends.
Details

 06-13-2016
4.00
Drilled F704H to F704 assembly. F623s started
Details
       

 06-12-2016
5.50
Deburred all baggage ribs, flanged and fluted all
Details
     

 06-11-2016
1.50
Deburred 4 F716 ribs, drilled holes for forward co
Details
       

 06-10-2016
5.00
Control Mount lightening areas, 6 F715/F716 ribs d
Details

 06-09-2016
1.00
F704 Work - drilled control mounts and cover suppo
Details
     

 06-05-2016
1.50
Drilled control column mounts - initial hole, acce
Details
     

 06-04-2016
0.75
Cut 1.5" holes in the 4 center F-716 ribs and cut
Details

 06-02-2016
3.00
Aft Fuselage riveting completed
Details
       

 06-01-2016
3.50
Aft Fuselage riveting with Ralph - lower areas
Details

 05-27-2016
1.00
More adjustment to F712/711 - reclecoed
Details
       

 05-26-2016
3.00
Riveted F779, F711, F712 and bolted WD-409
Details
       

 05-25-2016
2.00
Primed aft skins and misc parts
Details

 05-23-2016
4.00
F773 R and L tailcone sideskins deburred and dimpl
Details

 05-22-2016
0.50
Rudder Cable Fairings cut, shaped and deburred
Details

 05-19-2016
2.00
Aft bottom skin deburred edges, drilled transponde
       

 05-18-2016
2.00
Deburred and dimpled all Jstringers, F779 skin
Details

 05-17-2016
2.00
Deburred and dimpled all bulkhead holes
Details

 05-15-2016
2.50
Drilled Static Ports and Disassembled entire aft f
Details

 05-14-2016
1.50
J-stringers drilled
Details
       

 05-13-2016
1.00
AN174-14A Close Tolerance Bolt for WD-409
Details

 05-12-2016
1.00
F712 - clearanced aft tabs and more adjusting. F6
Details

 05-11-2016
2.00
F711 and F712 flanging
Details

 05-10-2016
2.00
Drilled lower J-stringers in aft most tail
Details

 05-09-2016
4.00
WD-409 and tailspring drilled to final size
Details
     

 05-08-2016
2.00
Clecoed entire aft fuselage
       

 05-07-2016
2.00
WD-409 and F711/712/779 measurement/fitting
Details
       

 05-06-2016
3.00
Finished riveting F705, flap bushings drilled, F70
Details
       

 05-04-2016
2.00
Riveted all AFT bulkheads
Details
     

 05-03-2016
3.00
Primed alll bulkheads
Details
       

 05-02-2016
8.00
F705 Final prep
Details
       

 05-01-2016
4.00
F705 continued - finished F634s, and deburred all
Details

 04-30-2016
2.00
Drilled F634 lap belt anchors
Details
       

 04-29-2016
2.00
F705H spacer drilled
Details

 04-28-2016
1.50
F705 C/B Drilled
Details

 04-26-2016
1.00
Began F-705 and cut F705-B/K
Details
       

 04-25-2016
3.00
Finished and debured/fluted F-706
Details

 04-24-2016
2.00
F706 and autopilot bracket started
Details
       

 04-22-2016
1.00
F729-A/B/C and F-728-A/B fab
Details
     

 04-21-2016
1.00
Finished F707 and F708 including deburr and flutin
Details
     

 04-20-2016
2.00
Drilled F707 and F708 including rudder bushing hol
Details

 04-19-2016
3.00
Drilled F711-A/B/C/D, deburred/finished
Details
       

 04-18-2016
5.00
Aft fuselage bulkheads - prep
Details
     

 04-14-2016
2.50
Deburred and Finished all J-channels
Details
     

 04-13-2016
1.00
Cut J-stringers
Details
     

 04-12-2016
1.50
Riveted new F601Js. Firewall done!
Details
       

 04-05-2016
3.00
FW riveting - all except F-601J
Details
       

 04-04-2016
2.00
Primed and top coat of FW angle and doublers

 04-03-2016
7.00
Deburred/Dimpled SS FW, made another F601J-L
Details

 04-02-2016
7.50
Deburred and prepped, countersunk all angles/doubl
Details

 03-28-2016
1.50
Disassembled FW, csk SS nutplate holes, fabricated
Details

 03-20-2016
3.50
Firewall - final item prep
Details
       

 03-18-2016
5.00
Firewall Misc: Heater Valve, Transducer Manifold,
Details
       

 03-17-2016
1.00
Parking Brake Mount Fabrication - completed
Details
     

 03-15-2016
2.00
Parking Brake Mount Fabrication
Details
     

 03-14-2016
2.50
FW - completed match drilling including F-601J ang
Details
       

 03-11-2016
2.50
Match drilled FW and F601J fabrication
Details
       

 03-08-2016
3.00
Completed inventory and organization
Details

 03-07-2016
5.00
Fuselage Arrived and Inventory
Details
       

 02-20-2016
1.50
Pre-prepped Parts for Firewall
Details
     

 02-19-2016
2.00
Deburring F721-B Aft Canopy Decks and F714 Aft Dec
Details
       

 02-18-2016
5.00
New RIGHT Longeron Completed
Details
       

 02-14-2016
1.50
Downward Bend LEFT Longeron
Details

 02-09-2016
4.00
Final finishing of R & L shallow bends and drilled
Details
       

 02-08-2016
5.00
Finished most of LEFT bend and started RIGHT bend,
Details
       

 02-07-2016
3.00
Shallow Bend in LEFT Longeron
Details
     

 02-01-2016
3.00
F704 Final Finishing
Details
       

 01-28-2016
0.50
F-704 Nutplates riveted to center section x 18
Details

 01-27-2016
2.00
F704 Center Section Riveting
Details
       

 01-27-2016
3.00
Aft deck relief notches in longerons & F704M reinf
Details
       

 01-26-2016
2.00
F704M -R/L stiffeners fabricated, drilled, deburre
Details

 01-25-2016
4.00
F704 Center Section - Initial Drilling
Details
       

 01-23-2016
1.00
More aft longeron filing/dressing
Details

 01-18-2016
2.00
Cut aft longeron areas - bulkhead interface
Details
       

 01-16-2016
2.00
Longerons
Details

 01-08-2016
1.00
Ordered Fuselage!
Details