KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
Work Logs Found: 41
Category Work Time: 134 Hours
 Date
Hours
Work Log Summary

Details

 02-06-2015
3.00
Removed and Reinstalled Tanks - Edge Forming
Details

 02-01-2015
1.50
Installed both tanks
Details
       

 01-31-2015
3.00
Leak Tested both tanks
Details
       

 01-30-2015
1.50
Installed Inboard Coverplates/fuel pick ups and di
       

 01-29-2015
3.50
Encapsulated all shop heads on rear baffles
Details
     

 01-28-2015
5.00
RightTank Baffle and Z Brackets Installed
       

 01-27-2015
0.50
Left Tank Interior Photos
       

 01-27-2015
6.00
Left Tank Baffle and Z Brackets Installed
       

 01-25-2015
2.50
Fuel Pick ups/anti-rotation brackets and IB Cap se
Details
       

 01-23-2015
4.00
Outboard ribs riveted.
Details
       

 01-22-2015
4.00
Inboard Ribs and T-405/T-410's installed.
Details
       

 01-21-2015
3.50
Fabricated Fuel Vent Lines. Outboard cap senders.
Details

 01-20-2015
3.50
Encapsulated all inboard rivet heads in sealant.

 01-17-2015
9.00
Riveted all L and R inboard ribs.
       

 01-15-2015
2.00
BNC, vent bulkhead fitting install. OB cap sender
Details

 01-14-2015
4.00
Cleaned all inboard rib holes, removed excess seal

 01-13-2015
0.50
Pushed in all clecoes and pushed excess sealant t

 01-12-2015
5.00
Fay sealed all Left and Right internal ribs.
Details
       

 01-09-2015
3.50
Riveted Fuel Caps and Clips
Details
       

 01-07-2015
4.00
Riveted left tank stiffeners
Details
       

 01-06-2015
4.00
Right tank stiffeners
Details
       

 01-04-2015
2.00
Dimpled tank skins

 01-02-2015
3.00
Deburred all tank skin and baffle holes and scotc
     

 12-20-2014
3.00
Dimpled stiffeners, new T-410s drilled, skins edge

 12-19-2014
2.00
Prepped ribs, clearanced T-405s. Riveted Tank Acc
     

 12-15-2014
2.00
Deburred all rib holes. Dimpled all ribs with str

 12-13-2014
9.00
Drilled all Stiffeners, Cap Sender NP's, Vent Line
Details
       

 12-12-2014
3.00
Drilled T-405 / T-410 attach/reinforcements and Ca
Details
       

 12-10-2014
4.00
ER Tank attach holes, tank drains, flycut access c
Details
       

 12-09-2014
7.00
Deburred holes, BNC/vent/ER tank holes, fuel caps
Details
       

 12-08-2014
1.50
Countersunk tank skins for rear baffles
     

 12-07-2014
2.00
Fabricated Tank Attach brackets
     

 12-03-2014
2.00
Match drilled both L/R tank skins to ribs
     

 12-02-2014
2.00
Cut stiffeners, drilled cover plates for fuel pick

 10-20-2014
3.00
Drilled outboard Z brackets and R leading edge ins
Details
       

 10-19-2014
8.50
Z bracket to baffle drilling - tank clecoed
Details
       

 10-17-2014
1.00
Deburred Z brackets

 10-16-2014
1.50
Drilled Z brackets for nutplates
     

 10-15-2014
0.50
Riveted Inboard Z-bracket nutplates to spars

 10-14-2014
2.00
Drilled Z brackets to spars
       

 10-13-2014
2.00
Drilled Z bracket center holes










Copyright © 2001-2024 Matronics. All Rights Reserved.