Brief Description: Deburred holes, BNC/vent/ER tank holes, fuel caps
Deburred all baffle holes. Deburred tank attach bracket holes. Reassembled L baffle on spar and fabricated new inboard Z bracket/drilled to spar/baffle. All other Z brackes installed, bolted and clecoed to ensure proper alignment of new Z bracket.
Clamped, aligned and drilled fuel caps.
Drilled BNC cap sender holes, vent line fitting hole, ER tank bung attachments.