KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
Work Logs Found: 844
Category Work Time: 2292 Hours
 Date
Hours
Work Log Summary

Details

 07-28-2018
1.00
High Speed Taxi Testing and Compass Calibration (D
Details

 07-27-2018
1.00
Taxi Test. Idle and Idle Mixture final adjustment
Details

 07-26-2018
1.00
Extended Range Tanks - Fuel flow test
Details

 07-25-2018
1.00
First taxi test. Idle/Idle Mixture Adjustment and
Details
     

 07-22-2018
3.00
First Engine Start!!!
Details
       

 07-20-2018
2.00
Trimmed inboard flaps and re-checked rig.
Details
       

 07-19-2018
2.00
Dynon Fuel Calibration Completed.
Details
       

 07-17-2018
2.00
Weight and Balance
Details
     

 07-17-2018
0.00
Weight & Balance weight pics
Details
       

 07-16-2018
2.00
Fuel Flow and Unusable Fuel Testing
Details
     

 07-03-2018
3.00
Interior Installed to prep for W&B
Details

 07-01-2018
2.00
Finished cleaning up wing gap fairings and install
Details
       

 07-01-2018
2.00
ELT GPS Testing/Ops Testing and AP Servo config an
Details
       

 07-01-2018
0.00
Airframe completed - pics
Details
       

 06-30-2018
6.00
All fabrication is finished now - the aircraft is
Details
       

 06-30-2018
0.00
Additional pics for today.
Details
       

 06-30-2018
0.00
Additional pics for today.
Details
       

 06-30-2018
0.00
Additional pics for today.
Details
       

 06-30-2018
0.00
Additional pics for today.
Details
       

 06-30-2018
0.00
Additional pics for today.
Details
       

 06-30-2018
0.00
Additional pics for today.
Details
       

 06-30-2018
0.00
Additional pics for today.
Details
       

 06-30-2018
0.00
Additional pics for today.
Details
       

 06-29-2018
6.00
Final flap rigging & install. ADSB472 new box ins
Details
       

 06-29-2018
0.00
Additional pics for today.
Details
       

 06-29-2018
0.00
Additional pics for today.
Details
       

 06-25-2018
4.00
Final install of ailerons, torqued all nuts, initi
Details
       

 06-20-2018
3.00
Tank brackets bolted/torqued & safety wire. Rigge
Details

 06-19-2018
2.00
Installed pitot tube and heat connections. AP ser
Details
       

 06-18-2018
3.00
Wing wiring connections finished on both wings. RT
Details
       

 06-17-2018
4.00
Wing bolts installed (close tolerance) and torqued
Details
       

 06-16-2018
8.00
Wing - aft spar drilling and gap fairing nutplate
Details
       

 06-14-2018
1.00
Made 3" incidence spacer for Smart Level for wing
Details

 06-12-2018
2.50
Tailwheel - Tail Lynx installed
Details
       

 06-08-2018
2.00
Marked spar stubs and made templates. Removed int
Details
       

 06-07-2018
0.50
Wing walk tape installed
Details

 06-05-2018
3.00
Wing root fairing nutplates installed - all except
Details
     

 06-03-2018
8.00
Lots of odd tasks done today....
Details
       

 06-02-2018
3.00
Installed elevators and torqued. Rudder in place,
Details
       

 05-31-2018
3.00
Installed cowliing, adjusted skybolts and installe
Details
       

 05-29-2018
1.00
Move completed
Details
       

 05-28-2018
6.00
Moving Day
Details
       

 05-23-2018
0.50
Installed baffle strips and cleaned up anti-chafe
Details

 05-22-2018
3.50
Adjust heat muff, installed spark plugs, wet sande
Details
       

 05-21-2018
1.00
Installed canopy seals and Koger sunshade.
Details
     

 05-20-2018
6.00
Coat of K38 primer to cowling, spinner installed,
Details
       

 05-19-2018
5.50
Installed interior
Details
       

 05-17-2018
0.50
Added additional adel clamp on heater SCEET and di
Details

 05-16-2018
1.00
More cowling wet sanding
Details

 05-15-2018
3.00
Skybolt cowl fasteners drilled and riveted to FW p
Details
       

 05-12-2018
7.00
Nutplates installed on cowling, primed cowl, spinn
Details

 05-03-2018
0.50
Dynon file update and back up battery charged.
Details

 05-02-2018
0.50
Installed GPS antenna and forward access covers.
Details
       

 05-01-2018
2.00
Firewall barrier and proseal canopy seal area
Details

 04-30-2018
3.00
Seat back hinges drilled and riveted. Lightening
Details
       

 04-28-2018
6.00
Cowl inlet baffle seals fabricated, clips fabricat
Details
       

 04-27-2018
2.50
Engine is done! CHT/EGT lines for all cyls. SCEE
Details
       

 04-26-2018
5.00
Baffling and engine install almost complete.
Details
       

 04-24-2018
2.00
Primed/painted and riveted 4130 doublers to cyl ba
Details
     

 04-23-2018
1.50
Fabricated and drilled 4130 reinforcements for low
Details

 04-22-2018
8.00
Baffle seals fabricated and installed
Details
       

 04-21-2018
3.00
FAB wet sanded, primed and painted. Alernate air
Details

 04-20-2018
4.00
Drill and rivet heat and alternator ducts. Rivete
Details

 04-18-2018
1.00
More forward cowl trim and FAB micro sanding
Details

 04-18-2018
1.00

Details

 04-17-2018
3.00
Oil cooler duct riveted, heat duct cut, alternator
Details
       

 04-16-2018
2.50
Glassed alternate air hole and micro on FAB, cut o
       

 04-15-2018
2.00
Snorkel test fit, alternate air hole cut. Cowl in
Details
     

 04-14-2018
6.00
FAB, finished all brackets. Nutplates to hold dow
Details

 04-13-2018
0.50
New interior arrived, checked out seats
Details
       

 04-12-2018
3.00
FAB work continues
Details

 04-11-2018
7.00
FAB work continues - made VA 132 brackets and baff
Details
       

 04-10-2018
4.00
Snorkel fitting to left inlet, drilled holes, cut
Details
       

 04-09-2018
1.00
More baffle riveting, clearanced forward cowling p
Details

 04-07-2018
5.00
Finished top baffle trim
Details

 04-06-2018
2.00
Baffle marking and initial top trim
Details
       

 04-05-2018
3.00
Baffling fitting and trimming, fabricated front cl
Details
       

 04-04-2018
4.00
Baffling fitting and trimming
Details

 04-02-2018
2.00
Baffling fitting and trimming
Details

 04-01-2018
4.00
Baffling fabrication, deburr and riveting
Details

 04-01-2018
1.50
Baffling fabrication and riveting
Details
       

 03-31-2018
3.00
Baffling fabrication and deburring
Details

 03-29-2018
0.50
Started baffles
Details

 03-28-2018
2.00
Cowling oil door sanding, cowl sanding
Details

 03-27-2018
2.00
Oil Door Fabrication finished. Hinges drilled. G
Details
       

 03-25-2018
3.00
Oil Cooler Lines - Firesleeve, oil door fabricatio
Details
       

 03-24-2018
5.00
Installed oil cooler mount, cooler, plenum and cab
Details
       

 03-23-2018
2.00
Painted oil cooler plenum white. RTV plenum mount
Details
     

 03-22-2018
2.00
Sanded upper intersection fairing.
Details

 03-21-2018
1.00
Glassed upper intersection fairing
Details

 03-18-2018
3.00
Cowling - removed cover plates an drilled nutplate
Details
       

 03-17-2018
3.00
Sanded forward cowl and glassed hinge pin cover pl
Details
       

 03-16-2018
3.00
Front cowling micro sanding, OC plenum sanding
       

 03-15-2018
3.00
Oil Cooler plenum sanding and micro. Cowling fron
Details

 03-14-2018
3.50
Oil Cooler Plenum layup and cowl edge sanding
Details
       

 03-13-2018
2.00
Riveted horizontal side hinges.
Details
       

 03-12-2018
2.50
Cowling horizontal hinge prep
Details

 03-11-2018
3.50
Drilled, shaped upper intersection fairings and op
Details
       

 03-09-2018
2.00
Oil Cooler gap seals fabricated and riveted
       

 03-08-2018
3.50
Cowl side hinges, upper and lower drilled
Details
       

 03-07-2018
4.00
Cowl edge gap sanding, oil cooler plate fabricated
Details
     

 03-06-2018
2.00
Trimmed and sanded left lower cowling edge
Details

 03-04-2018
3.00
Lower Cowl right edge glassing and oil cooler fitm
Details
       

 03-03-2018
4.00
Lower Cowl fitted, trimmed and drilled to firewall
Details
       

 03-02-2018
2.00
Lower Cowling - Trimmed gear area and aft bottom c
     

 03-01-2018
3.00
Top Cowl - final forward trim, trimmed aft edge an
Details
       

 02-28-2018
3.00
Cowling - leveled fuselage, marked spinner hole.
Details
       

 02-27-2018
1.50
Cowling - measured perimeter, forward cowl/spinner
Details

 02-26-2018
2.50
Prop all done. Spinner primed. Prop safetied. A
Details
       

 02-26-2018
0.50
Changed sender manifold fitting for fuel pressure.
Details
     

 02-25-2018
0.50
Propeller track and spinner wobble check.
Details
       

 02-25-2018
2.50
Prop installed!
Details
       

 02-24-2018
3.00
Finished spinner gaps and riveted all nutplates.
Details
       

 02-23-2018
3.00
Spinner gaps fabricated and drilled
Details
     

 02-22-2018
3.50
Spinner dome cut. Drilled all mounting holes to #
Details
       

 02-20-2018
4.00
Forward top skin riveted!
Details
       

 02-20-2018
3.50

Details

 02-19-2018
2.50
Continued spinner aft bulkhead - removed center ma
Details
       

 02-18-2018
1.00
Drilled spinner backplate
Details

 02-17-2018
2.50
P-leads installed. Servo to pump line final instal
Details
       

 02-17-2018
1.00
Forward Central Tunnel Covers
Details
       

 02-16-2018
3.50
P-leads installed. Sniffle valve and fuel pump dr
Details
       

 02-15-2018
2.50
Engine breather fabricated and installed. Ignitio
Details
       

 02-14-2018
2.50
Engine Ground Strap fabricated. Field wire at reg
Details
     

 02-13-2018
4.00
Starter/Alternator/Red Cube wire routing planning
Details

 02-12-2018
2.00
Starter cable end crimped, Alternator B-lead end c
Details
     

 02-11-2018
2.50
Sender manifold lines fabricated and installed.
Details
       

 02-10-2018
3.00
Main fuel lines to pump and servo fabricated. Exh
Details
       

 02-09-2018
2.00
Heat Muff installed. Sender manifold - redid all
Details

 02-08-2018
8.00
Torqued Exhaust. Removed preservative oil/added o
Details
       

 02-07-2018
3.00
MAP restrictor fitting installed, throttle linkage
Details
       

 02-05-2018
1.50
Exhaust mocked up and EGTs drilled. Throttle brac
Details
       

 02-04-2018
7.00
Torqued engine mounts and cotters. Servo installe
Details
       

 02-03-2018
4.00
Engine Install and test fitting components
Details
     

 02-02-2018
1.00
Ready for engine installation
Details
       

 02-01-2018
1.00
Installed OT Sender, FP fittings (all, including F
Details
       

 02-01-2018
0.50
Installed N-numbers on tailcone
Details
       

 01-31-2018
1.50
Added final placards - panel now done!
Details
       

 01-29-2018
1.00
Avionics Access Hatch - FIPS seals completed.
Details
       

 01-28-2018
1.00
Shimmed ADAHRS to center slip/skid ball w/ .025" s
Details

 01-27-2018
2.50
Crankshaft plug removed. Oil pressure restrictor
Details
       

 01-26-2018
3.00
Prop governor clocked and cable end checked. Inst
Details
       

 01-25-2018
1.00
Prop governor installed and oil pressure restricto
Details
       

 01-24-2018
0.00
More final wiring shots.
Details
       

 01-24-2018
0.00
More final wiring shots.
Details
       

 01-24-2018
0.00
More final wiring shots.
Details
       

 01-24-2018
0.00
More final wiring shots
Details
       

 01-24-2018
3.00
Finished Tie Wraps for all forward wiring, Install
Details
       

 01-23-2018
0.50
Vent tubing insstalled for NACA fresh air ducts
Details

 01-22-2018
4.00
Dynon Skyview Configuration - finished & Batt Test
Details
       

 01-21-2018
3.00
Dynon Skyview Configuration
Details

 01-20-2018
1.00
New panel screws installed, thicker mic/phone isol
Details

 01-19-2018
2.50
Panel Done!
Details
       

 01-18-2018
3.00
Wired stack and installed main main panel
Details
       

 01-17-2018
1.00
Installed intercom, comms 1&2, AP Panel and Switch
Details
     

 01-16-2018
2.00
Drilled music input (alternate) hole and TX 1&2 lo
Details
     

 01-15-2018
4.00
Seat Heat Finally Finished
Details

 01-14-2018
4.00
Seat Heat Cont'd
Details
     

 01-13-2018
3.00
Seat Heat Cont'd
Details
       

 01-12-2018
3.50
Seat Heat Harness fabrication started
Details
     

 01-11-2018
3.00
Designed switch labels and placards/overlays
Details
     

 01-10-2018
1.50
Wiring Diagrams continued
Details

 01-09-2018
1.00
Wiring Diagrams continued
Details

 01-08-2018
2.00
Fuse blocks relabeled, seat heat doc redo, wiring
Details
       

 01-07-2018
2.50
Installed RAMI AV-17 antennas, comm 1&2, ELT test
Details
     

 01-06-2018
0.00
PTT Notes - Pilot PTT ground COMMON with trim on s
Details

 01-06-2018
2.00
Avionics stack (2 SV Comms and SV Intcom) planning
Details

 01-05-2018
2.00
Tested Trim System, ELT Batteries installed. Prep
Details

 01-04-2018
7.00
Aileron trim spring Install, Safeair FW pass throu
Details
       

 01-03-2018
3.00
Fuel Capacitance Senders wired to EMS.
Details
     

 01-02-2018
3.50
EMS D-37 All Sensors Terminated. EMS D-25 wires r
Details
     

 01-01-2018
5.50
EMS Wiring - hook ups to sensors
Details

 12-30-2017
7.00
Auto Pilot/Auto Trim Wiring / EMS 220 Wiring
Details
       

 12-29-2017
4.00
Dynon Skyview HDX is live!
Details
       

 12-28-2017
2.00
SV D-37 EFIS D-subs completed (Serial/GPS/Audio)
Details

 12-27-2017
2.00
Airframe Wiring Testing and SV D-37 Audio Splices
Details

 12-16-2017
9.00
Dynon dual D-37 Serial Wires spliced, GPS bundle s
Details
       

 12-12-2017
2.00
Avionics wiring - ADAHRS and roll/pitch servos
Details
     

 12-11-2017
3.00
Avionics Wiring - power and grounds
Details
       

 12-10-2017
5.00
Panel - airframe wiring terminated
Details

 12-09-2017
4.00
Panel - airframe wiring terminated
Details

 12-08-2017
3.00
Annunciator Lights - wired
Details
     

 12-07-2017
4.00
Alternator/Regulator Finished, Flap wiring routed
Details
       

 12-06-2017
2.00
ACS Switch
       

 12-05-2017
3.00
Alternator/Reg wiring, warn light, flap switch wir
Details

 12-04-2017
3.00
Bus power to panel switches
Details
       

 12-03-2017
2.00
Bus wiring completed

 12-01-2017
1.00
Engine Arrived and uncrated - new Lycoming YIO-360
Details
       

 11-29-2017
2.00
Primary/Secondary/Tertiary Bus Diagrams completed
Details

 11-28-2017
2.00
Wiring Diagram - Primary Wiring Diagram Completed
Details

 11-25-2017
4.00
Wire Diagramming/Planning with Tiny Cad
Details

 11-19-2017
1.00
Glareshield padding and LED light strip installed.
Details
     

 11-18-2017
1.00
Panel installed and mocked up with all EFISs & avi
Details
       

 11-17-2017
0.00
Canpopy Seal Pics
Details
       

 11-16-2017
4.00
Drilled and installed avionics stack nutplates. F
Details
       

 11-15-2017
3.00
Installed GPS antenna to mount. Fabricated circui
Details
       

 11-14-2017
2.50
Drilled TX 1 & 2 switch. GPS mount fabricated
Details

 11-13-2017
2.50
Finished avionics stack holes
Details
       

 11-12-2017
7.00
Cut EFIS 1, Drilled EFS 1 & EFIS 2 to panel.
Details
       

 11-11-2017
3.00
Cut holes for EFIS2, ELT and USBs
Details

 11-10-2017
3.00
Installed instrument panel and cabin heat cable
Details
     

 11-08-2017
2.50
Panel - lower mount finished, sanded and clearcoat
Details
       

 11-07-2017
2.00
Panel hole cutting and lower panel mounting
Details
       

 11-06-2017
2.00
Panel layout and hole cutting
Details
     

 11-05-2017
2.00
Panel - More layout and spot micro w/black dye
Details

 11-04-2017
3.00
Panel Layout and spot micro w/black dye
Details

 11-02-2017
1.00
Wheelpants/GLF DONE - final spot fill and sealer p
Details
       

 11-01-2017
1.00
Gear Leg Fairings - more sanding, added brake line
Details

 10-31-2017
1.00
Wheelpants amd GLF - more sanding and filling
Details
       

 10-30-2017
2.50
Wheelpants sanding/filling and painted sub panel
Details
       

 10-29-2017
6.00
Wheelpants
Details

 10-28-2017
6.00
Wheelpants - NPs on int fairings, initial primer/f
Details
       

 10-27-2017
5.00
Wheelpants
Details
       

 10-23-2017
3.00
Wheelpant mount bolt/washers and aft fuse stiffene
Details
       

 10-22-2017
2.00
Wheelpants - sanding and more micro
Details

 10-21-2017
2.00
Wheelpants - sanded lower intersection fairings an
Details
       

 10-20-2017
2.00
Wheelpants - glassed aft pieces of lower intersect
Details

 10-19-2017
15.00
Wheelpants - cut intersection fairings in half and
Details

 10-18-2017
3.00
Wheelpants - sanded seams, drilled lower intersect
Details
       

 10-17-2017
2.00
Wheelpants - drilled mounts to final size and nutp
Details
       

 10-16-2017
1.50
Wheelpants, csk fwd halves and flox mounting point
Details

 10-15-2017
1.00
Wheelpants - installed nutplates on pants
Details
       

 10-14-2017
1.50
Gear Leg Fairing - aligned and installed
Details
       

 10-13-2017
1.00
Gear Leg Fairing - dampeners wrapped with glass cl
Details
     

 10-12-2017
2.50
Gear Leg Fairing dampeners installed
Details
       

 10-11-2017
3.00
Wheelpants - final trimming of openings
Details

 10-10-2017
3.00
Wheelpants drilled to U808 and U810
Details
       

 10-09-2017
2.00
Landing gear fairing and wheelpant trimming - more
Details

 10-08-2017
3.00
Landing gear fairing and wheelpant trimming. Dampe
Details

 10-06-2017
0.50
Prop Arrived!
Details
       

 10-05-2017
3.00
Wheelpants - cutouts for wheels and sanded halves
Details
       

 10-04-2017
0.50
Wheelpants - centerline marked
Details

 10-03-2017
2.50
Gear Leg Fairing
Details
       

 10-02-2017
2.00
Gear Leg Fairing
Details

 10-01-2017
1.50
Cut Hobbs and 12V charger holes, panel dimmer
Details
       

 09-30-2017
1.00
Installed sender manifold
Details
       

 09-29-2017
0.50
Sender manifold spacer fabrication
Details

 09-27-2017
1.00
Installed ELT horn and more panel layout
Details

 09-26-2017
3.00
Panel design and layout
     

 09-25-2017
0.50
Installed MP Sender
Details

 09-24-2017
2.00
Installed Dynon Batt, Radio, EMS, BNC regulator
Details
       

 09-18-2017
2.00
Empennage fairing nutplates installed on fuselage
Details

 09-17-2017
1.00
Empennage fairing nutplates installed on VS/HS.
Details

 09-16-2017
1.00
Empennage removed, new lower emp fairings.
Details

 09-13-2017
1.50
Empennage fairing final filling and primer.
Details
       

 09-12-2017
2.00
Empennage Fairing sanding/glassing and initial pri
Details

 09-10-2017
2.00
Empennage Fairing sanding/glassing.
Details

 09-09-2017
2.00
Empennage Fairing sanding/glassing.
Details

 09-08-2017
2.00
Empennage Fairing sanding/glassing.
Details

 09-07-2017
2.00
Empennage Fairing sanding/glassing.
Details

 09-06-2017
3.00
Forward access panels done.
Details
       

 09-05-2017
0.50
Added layer of glass to forward access panels
Details

 09-04-2017
1.50
Installed rudder linkages to pedals. More forward
Details
     

 09-03-2017
3.00
Fabricated rudder linkages and access panel sandin
Details
     

 09-02-2017
1.00
Installed rudder and fabricated templates for link
Details

 09-01-2017
2.00
Forward access doublers completed and riveted.
Details
       

 08-31-2017
2.00
More forward access doubler/shim fabrication.
Details

 08-30-2017
0.50
Ordered engine and prop.Van's Lycoming IO-360-M1B
Details

 08-30-2017
2.00
Forward access doubler/shim fabrication.
Details

 08-29-2017
1.00
Finished forward skin cuts and rough sanded emp fa
Details
     

 08-22-2017
1.00
More glass on empennage fairing, cut holes for for
Details
     

 08-21-2017
1.50
Floxed and glassed empennage fairing.
Details
     

 08-20-2017
1.00
Trimmed empennage fairing and drilled to fuselage.
Details
     

 08-18-2017
1.50
Canopy is done! Installed HS/VS.
Details

 08-17-2017
1.50

Details
       

 08-16-2017
1.00
More canopy fiberglass sanding, initial filler pri
Details
     

 08-15-2017
1.50
More glassing of canopy, trimmed empennage fairing
Details
     

 08-14-2017
1.00
Remasked and added micro/drilled aft HS lower fair
Details

 08-13-2017
0.50
Added glass to left side and sanded.
Details

 08-12-2017
2.00
More canopy fairing sanding/ removed canopy
Details

 08-11-2017
2.00
More canopy fairing sanding
Details

 08-10-2017
0.50
Removed peel ply and added fiberglass to low spot
Details
       

 08-09-2017
2.50
Sanded flox and added fiberglass layers to windscr
Details
       

 08-08-2017
1.00
More flox on forward windscreen area
Details

 08-07-2017
1.50
Final adjustment of aft latch. Initial flox of FW
     

 08-06-2017
2.00
Installed all screws on canopy and adjusted aft la
Details
     

 08-05-2017
3.00
Installed canopy latch lugs and upper safety latch
       

 08-04-2017
4.00
Painted inside of canopy frame (gray) and canopy s
Details

 08-03-2017
4.00
Primed and painted glareshield flat black. Rivete
Details
     

 08-02-2017
3.00
Primed canopy frame/side skirts. Drilled roll bar
Details

 08-01-2017
1.00
Dimpled canopy side skirts and aft top skins for p

 07-31-2017
3.00
Canopy stops installed.
Details
       

 07-29-2017
3.00
Mounted Busses 1 & 2 and Dynon Hubs 1 & 2. Began
Details
       

 07-28-2017
3.00
Canopy Guides installed. Carbon wrap on F-721A/B
Details
     

 07-27-2017
2.00
Aft canopy finishing, drilled all canopy holes to
Details

 07-26-2017
2.00
Fabricated FWD canopy clips and aft top skin shims
Details

 07-24-2017
2.50
Drilled side skirts to canopy frame. FWD canopy a
Details
       

 07-21-2017
8.00
Final trim and drill of AFT canopy
Details
       

 07-20-2017
9.00
Aft canopy latch lugs. Final FWD canopy trim. In
Details

 07-13-2017
0.50
Final FWD canopy trim areas marked.
Details

 07-12-2017
1.50
Drilled FWD canopy plexi to frame and deburred.
Details
     

 07-06-2017
3.00
Canopy frame riveting continued.
Details

 07-05-2017
3.00
Canopy frame riveting
Details
       

 07-03-2017
6.00
Deburr, dimple/csk canopy skin and frame.
Details
       

 07-02-2017
2.00
Made strut mount (aft) nutplate plate for ease of
Details
     

 07-01-2017
8.00
Deburred primed and riveted aft bow F631 splice pl
Details
       

 06-30-2017
2.00
Final drilled F631s to WD725s and drilled splice p
Details
     

 06-27-2017
2.00
Final trimming of canopy at the ears area. Final
Details
     

 06-26-2017
3.00
Trimmed front 3x, sides of canopy.
Details
     

 06-23-2017
2.00
The big cut. Done.
Details
       

 06-22-2017
1.50
More forward canopy edge trimming and deburring.
Details

 06-21-2017
3.00
Trimmed aft and both sides of canopy. Additional
Details
       

 06-20-2017
1.50
Trimming of lower forward flange. Marked F631A's

 06-19-2017
1.00
Positioning of canopy on frame. Taped off canopy
Details

 06-17-2017
4.50
Drilled Reinf Pieces C7128 A/Bs Fabricated F7128C
       

 06-16-2017
7.50
Finished wedges, drilled and riveted. Reinforceme
Details
       

 06-15-2017
9.00
Drilled splice plates for WD-725s and WD716s, star
Details

 06-14-2017
3.50
WD-725 and F-631 interface work.
Details

 06-13-2017
1.50
F631 splice plate template
Details

 06-11-2017
1.00
F631 A Flanges to 92.5 degrees.
Details

 06-10-2017
1.00
Canopy skin "ears" and side skirts
Details

 06-09-2017
5.00
Drilled hinge arms, installed bushing.
Details
       

 06-08-2017
3.50
Deburred, primed and riveted WD-716 hinge arms and
Details
       

 06-07-2017
3.50
Drilled hinge arms to weldment
Details
     

 06-07-2017
2.50
Canopy work continues / battery cables
Details
       

 06-05-2017
2.00
Deburrring canopy frame
Details

 06-04-2017
1.50
Drilled C-614 Splice Plate & Deburrring WD-716
Details
     

 06-03-2017
1.00
WD-716 (forward canopy frame) and C-702 skin
Details
     

 06-02-2017
2.00
Bled Brakes
Details
       

 06-01-2017
2.00
Installed copper buss type bars for master/starter
Details

 05-31-2017
2.00
Parking brake install completed. Brake lines on e
Details
       

 05-30-2017
2.00
Worked on aft canopy latch - completed
Details
       

 05-29-2017
2.50
Worked on aft canopy latch
Details

 05-26-2017
3.00
Repacked wheel bearings, finished axle nut mod. I
Details

 05-24-2017
4.00
Landing gear installed and on! Landing gear insta
Details
       

 05-23-2017
2.00
Cut axle nut for Avery jack tool. Reamed gear leg
Details
       

 05-22-2017
2.00
Deburred wheel paint fairling, removed deburred en
Details
     

 05-21-2017
8.00
Riveted Skybolt Cowl Strips - Sides/Bottom and FW
Details
       

 05-20-2017
4.00
Engine Mount Drilled to FW
Details

 05-19-2017
1.00
Ammeter Shunt and ANL-60 FW mounts riveted, gear l
Details

 05-18-2017
2.00
Ammeter Shunt and ANL-60 FW mounts fabricated/dril
Details

 05-17-2017
2.00
Finish Kit received and inventoried
Details
     

 05-16-2017
2.00
Sticks insalled and harnesses ran fwd. AFP Fuel P
Details
       

 05-15-2017
4.00
Stick harnesses fabricated
Details

 05-14-2017
1.00
Clecoed FWD bulkhead/panel to measure stick length
Details
       

 05-13-2017
4.00
Wing Wiring to Fuselage (Cont'd)
Details
       

 05-11-2017
2.00
Wing Wiring to Fuselage (Cont'd)
Details
     

 05-10-2017
2.00
Wing Wiring to Fuselage
Details

 05-09-2017
1.50
Installed brake lines, new fuel pump line
Details

 05-08-2017
1.00
Riveted F-723 Cabin Frame Channel Ass'y
Details

 05-05-2017
2.00
Ran all existing wiring forward, installed forest
Details
     

 05-04-2017
1.00
Canopy latch installed, flap motor installed, FWD
Details

 05-03-2017
2.00
Final installed rudder pedals, parking brake/lines
Details
       

 05-02-2017
2.00
Installed interior items (Cabin Frame, Spar/Gear r
Details
       

 04-30-2017
2.00
Finished painting - touch up and removed masking
       

 04-29-2017
10.00
Painted Fuselage interior JetFlex WR Basic Gray.
Details
       

 04-27-2017
3.00
Cut flap rod holes. Central tunnel and FW adels.
Details
       

 04-26-2017
1.00
Removed all cabin items, getting ready for paint.
     

 04-25-2017
2.00
Drilled AMM Shunt, fabricated FP and Flap harnesse
Details

 04-23-2017
2.50
Prosealed NACA vents, main fuel line from pump to
Details
       

 04-22-2017
8.00
Fuel Line Fabrication
Details
     

 04-21-2017
1.00
Fuel Line Fabrication started
Details
       

 04-19-2017
1.00
Drilled and riveted rudder cable fairing
Details
     

 04-16-2017
6.00
-4 (3003) vent and brake lines fabricated.
Details
       

 04-12-2017
3.00
Throttle/Prop/Mixt cable pass thrus drilled.
Details
       

 04-11-2017
1.00
F-774 aft top skin riveting complete
Details
       

 04-10-2017
0.50
Brake Cable Mount Fabricated
Details

 04-09-2017
5.00
F774 Top Skin Riveted
Details
     

 04-07-2017
1.00
ELT GPS 4 conductor wire soldered.

 04-06-2017
3.50
Wiring in aft fuselage
Details
       

 04-03-2017
1.00
Transponder, ADSB and Pitch Servo wire harnesses r
Details

 04-02-2017
6.00
Finished ADAHARS Mount.
Details
       

 04-01-2017
9.00
Finished Riveting aft fuselage - all and ADAHRS mo
Details
       

 03-31-2017
2.00
Riveting on F775 Rear Top Skin

 03-30-2017
1.00
Installed Transponder rack, installed ADSB-IN moun
Details

 03-29-2017
1.00
Ran OAT lines and heat shrunk them. Removed top s
Details

 03-27-2017
1.50
VS 411PP drukked abd riveted to F705 for canopy la
Details

 03-25-2017
3.00
Canopy Latch - final install
Details
       

 03-24-2017
2.50
Canopy Latch - primed angles, layed out and drille
Details
     

 03-23-2017
1.50
Canopy Latch - Drilled attachment holes to canopy
Details

 03-20-2017
1.00
Deburring Canopy Latch and cut angles
Details

 03-19-2017
1.00
Rudder pedals, helper springs added, AN fittings i
Details
     

 03-17-2017
0.50
Rudder Pedals - sprayed additional coat of white
Details

 03-17-2017
0.50
Cabin Frame - drilled pilot holes on frame and aft
Details
     

 03-15-2017
3.00
Cabin Frame Support - drilled small brackets/brace
Details
       

 03-15-2017
3.00
Cabin Frame - Drilled frame to main brackets, CSK
Details
       

 03-14-2017
2.50
Cabin Frame - Drilled brackets to fuse and deburre
Details
       

 03-10-2017
2.00
Cabin Frame - completed primary structure
Details
       

 03-09-2017
2.50
Cabin Frame - deburred holes and riveted joint pla
Details
       

 03-08-2017
3.50
Cabin Frame - redid edges on all flanges. Made 7/
Details

 03-07-2017
2.00
Cabin Frame - drilled strips & splice plate to AFT
Details
       

 03-06-2017
2.50
Cabin Frame - drilled Access holes and deburred al
Details

 03-05-2017
1.00
Cabin Frame filing for alignment. Fabricated jig.
Details
     

 03-04-2017
1.00
Removed extra tabs from weldment and filed.
Details

 03-03-2017
2.00
Rudder Pedals - riveted and brake arms drilled
Details
       

 03-02-2017
2.50
Rudder Pedals - drilling, deburr and prime.
Details

 03-01-2017
2.00
Rudder Pedals - deburring and cabin frame angle de
Details

 02-28-2017
1.50
Cabin Frame mounts cut and sanded. Rudder pedal d
Details
     

 02-27-2017
3.00
Finished deburring of flanges
Details
       

 02-26-2017
1.50
Deburring of flanges
Details

 02-25-2017
2.00
Cut lightening areas in FWD flanges.
Details
       

 02-24-2017
4.00
Drilled all remaining holes for lightening, measur
Details
     

 02-22-2017
3.00
Made small side pieces and drilled mounting holes
Details

 02-21-2017
1.00
fabricated .020 spacers and drilled
Details

 02-16-2017
1.00
Mounted seats and FWD Bulkhead, started cowl mount
Details
     

 02-15-2017
4.50
Drilled all seatback holes, deburred, primed & riv
Details
       

 02-14-2017
3.00
Cut 2.5" holes in support. Cut/Deburred tall angl
Details

 02-13-2017
1.50
Filed and Deburred seatback angles.
Details

 02-12-2017
4.00
Riveted F-768-A/L and F-643 to F768-A. Made canop
Details
       

 02-10-2017
4.00
Assembled Panel and FWD Deck. Riveted F-745 angle
Details

 02-09-2017
3.00
New F-745-R fabricated, panel nutplates installed.
Details

 02-08-2017
2.00
Finished deburring panel and riveted angles/nutpla
Details

 02-07-2017
2.00
CSK panel reinf and deburred flanges. Pilot holes
Details
     

 02-06-2017
3.00
Fabricated /Drilled Canopy hinge blocks
Details

 02-05-2017
5.00
Completed deburring of FWD bulkhead parts.
Details

 01-31-2017
2.50
Deburring of FWD bulkhead parts.

 01-30-2017
1.50
Drilled T/U seals, drilled NP holes for F745 panel
Details
     

 01-29-2017
1.00
Removed FWD Bulkhead Assembly. Measured C-617/C-1
Details

 01-28-2017
4.00
Deburred T/U seal & Panel Reinf. Drilled Panel fla
Details

 01-27-2017
2.50
F-697 Hat Section Cut/Drilled & F643 center rib an
Details
     

 01-26-2017
2.00
Drilled & Cut Angles for T/U seal and panel reinf
Details

 01-25-2017
4.50
Fab'd seatback angles, tip up seal, panel refinf a
Details

 01-24-2017
1.50
Riveted vent bracket and F-721B FWD canopy decks
Details
       

 01-23-2017
1.00
Final fit of vent bracket, nutplate holes drilled
Details
       

 01-22-2017
1.50
Fabricated/Drilled air vent supports to side skins
Details
     

 01-21-2017
1.50
jigged and drilled new F745 ribs/brackets to F786
Details
       

 01-19-2017
1.00
2 deg bend in F768 subpanel. Fabricated angle bra
Details
     

 01-18-2017
1.50
Trimmed F-745-L/R ribs and measured/drilled new lo
Details

 01-13-2017
1.50
Carbon Panel Trimming and Initial Fit/Install
Details
       

 01-12-2017
1.00
Carbon Panel Subframe - inserts drilled
Details

 12-14-2016
1.00
Riveted F-721C/D angles to F-721A fwd canopy decks
Details
       

 12-13-2016
1.00
Fabricated F-703C and F-721C/D angles
Details

 12-12-2016
1.00
Rivated F-704K cap strips
Details
       

 12-11-2016
5.00
Canopy Decks and F757s riveted. Tail removed.
Details
       

 12-08-2016
8.00
Control System Installed
Details
       

 12-01-2016
1.50
Fabricated bushings for elev. bellcrank, large pus
Details
       

 11-30-2016
1.00
Deburred, primed and riveted small elevator pushro
Details

 11-29-2016
1.50
Drilled Tailwheel Assembly to Rod, installed bolts
Details
       

 11-28-2016
0.50
Final wire to rudder nav/strobe and elevator pushr
Details

 11-26-2016
3.00
Reamed new tailwheel assembly on lathe
Details
     

 11-20-2016
0.50
Reinstalled empennage
Details
       

 11-19-2016
3.00
Installed FWD seat floors and flap assembly, bagga
Details
       

 11-18-2016
4.00
Wiring runs continued: ELT antenna, pitot/static/
Details
       

 11-17-2016
3.00
Wiring Runs: Pitch Trim, Nav/Strobe/ADSB Ant
Details
       

 11-16-2016
4.00
Riveted all cabin small parts, riveted seat hinges
Details
       

 11-15-2016
3.00
Primed all forward/top parts, initial riveting and
Details
       

 11-14-2016
1.00
Installed forward lower conduit
Details
     

 11-13-2016
3.00
Aft conduit mounts fabricated and drilled
Details
     

 11-12-2016
1.00
Deburring forward cabin components - finished!
Details

 11-11-2016
3.00
Deburring forward cabin components - cont'd
Details

 11-10-2016
1.00
Deburring forward cabin components - cont'd
Details

 11-09-2016
5.50
Deburring forward cabin components - cont'd
Details

 11-08-2016
1.00
Deburring forward cabin components
Details

 11-06-2016
2.00
Shoulder harness - F-706/F-751/F-652 UHMW pass thr
Details

 11-05-2016
2.00
Top skin edge deburring - both skins
Details

 11-03-2016
1.00
Forward cabin - underseat/baggage conduit drilled
Details

 11-01-2016
2.00
Floor - seatback hinge fabrication.
Details

 10-29-2016
2.00
Forward tunnel cover fabrication, drilling and csk
Details
     

 10-28-2016
2.00
Andair Fuel Valve work.
Details
       

 10-27-2016
2.00
Drilled new baggage floors. Drilled center flap b
Details
       

 10-24-2016
3.00
Flap housing drilled, WD-613 flap weldment holes r
Details

 10-23-2016
1.00
Drilled tailcone inspection panels and installed n
Details

 10-22-2016
6.00
ELT bracket drilled to mount/fuselage, F-706 nutpl
Details
     

 10-21-2016
1.00
ELT bracket drilled to mount/fuselage
Details
       

 10-18-2016
1.00
Drilled fuel pump/center covers - final fit
Details
     

 10-17-2016
1.50
Drilled fuel pump covers
Details

 10-16-2016
2.00
Baggage Bulkhead Covers Drilled and Trimmed
Details
     

 10-15-2016
1.50
Rudder Stops adjusted and riveted.
       

 10-14-2016
2.00
Drilled 2 aft skins, drilled FWD top skin, F-707B
Details
       

 10-11-2016
1.50
Drilled aft top stringers F-786L/R. Drilled and r
Details

 10-10-2016
2.00
Riveted F-781 VS attach plate and filed elevator s
Details
       

 10-09-2016
3.00
Finished VS Mounting
Details
       

 10-08-2016
2.00
VS initial alignment and drilling aft spar to F-71
Details

 10-07-2016
3.00
Drilled HS to fuselage - fore and aft spars.
Details
       

 10-05-2016
1.00
FWD upper fuselage structure drilled
Details
       

 10-04-2016
0.50
Drilled upper fwd fuselage. Riveted F-902s to long
Details

 10-01-2016
2.00
Riveted F-695 gussets. Drilled 2 aft F-695s to bu
Details
       

 09-30-2016
2.50
Drilled F-695 gussets to longerons and FW
Details
     

 09-29-2016
0.50
Finished riveting aft deck and deburred F-757 hole
Details

 09-26-2016
2.00
F-757s drilled, aft deck deburred and riveted
Details
       

 09-25-2016
3.00
Fabricated and drilled new F-712 aft elev stop and
Details
       

 09-24-2016
1.50
Drilled FWD95 elevator stop and deburred F-695s
Details

 09-23-2016
3.00
Finished Fuselage Riveting and Flipped the Canoe!
Details
       

 09-22-2016
3.00
Riveted FWD fuselage remaining and center section
Details
     

 09-20-2016
4.00
Fuselage Stand - built
Details
       

 09-18-2016
0.50
Finished riveting two outboard floor stiffeners wi
Details
     

 09-17-2016
1.50
Firewall prep and forward section riveting.
Details

 09-16-2016
3.00
Forward side skins riveted to angles and F-772 flo
Details
       

 09-15-2016
2.00
More Forward Section riveting.
Details
       

 09-14-2016
2.50
Riveting forward fuselage
Details

 09-13-2016
3.00
F-704 riveted - #30 and #40 entire length. F706 t
Details

 09-12-2016
2.00
Initial forward section riveting
Details
       

 09-11-2016
6.00
Moved fuselage components to garage and re-assembl
Details
       

 09-10-2016
5.00
Primed all remaining forward fuselage parts and mo
Details
       

 09-09-2016
4.00
Deburred and dimpled F-770 side skins, and upper f
Details
       

 09-08-2016
2.50
F-772 forward skin deburred, rolled edges on F-772
Details

 09-07-2016
3.50
Countersunk both F-718 longerons
Details
       

 09-06-2016
1.00
Riveted F-902 to F-7101 and F-684 gussets
Details
       

 09-05-2016
6.00
Deburring, Dimpling and Final Fabrication of Aft D
Details
       

 09-05-2016
3.00
Built EAA Workbench
Details
     

 09-04-2016
2.00
Deburring, Dimpling and Fabrication of Aft Deck it
Details

 09-03-2016
8.00
Deburring/Dimpling/CSK and priming
Details
       

 09-02-2016
3.50
Deburring/Dimpling
Details
     

 09-01-2016
3.00
Disassembly and Deburring Begins
Details
     

 08-26-2016
2.00
Drilled Skybolt FW fastener mounting strips. Dril
Details
       

 08-22-2016
1.00
Began FW strips for Skybolt fasteners
Details

 08-21-2016
2.00
Baggage area bulkhead - fab of lower flanges and a
Details
       

 08-19-2016
2.00
Redo of F-710-B angle
Details
       

 08-18-2016
3.50
Fabricated/Installed F-782D angles to forward cove
Details
       

 08-17-2016
1.00
Drilled F-6115 center rudder bearing block to rudd
Details
       

 08-16-2016
2.00
Rudder Blocks Drilled
Details
       

 08-14-2016
3.00
Forward stiffeners, and CSK #12 hole for tank brac
Details
       

 08-13-2016
2.00
Tank Bracket Installed
Details
       

 08-12-2016
2.00
Fabricated F-796C/D brackets
Details

 08-11-2016
4.00
Final fabrication and drilling of F-684 gussets an
Details
       

 08-10-2016
2.50
F902's installed, lower longerons/gear webs drille
Details
       

 08-08-2016
1.00
Fabricated F-684 gussets
Details
     

 08-08-2016
1.00
Drilled F717 lower longeron to WD-603 weldment to
Details
       

 08-07-2016
1.50
Initial Drilling of lower longeron to wedment.
Details

 08-06-2016
2.00
Drilled fuel vents, fuel line holes, radiused bott
Details

 08-05-2016
2.00
Twisted lower longerons and marked, gear webs dril
Details
       

 08-03-2016
3.00
F719 stiffeners completed, gear web started, lower
Details
       

 08-02-2016
2.00
New F719s drilled and clips started for fore/aft
Details

 08-01-2016
2.00
F-719 stiffener work
Details

 07-31-2016
10.00
Firewall drilled to skins, longerons to weldments
Details
       

 07-30-2016
1.50
Longeron twist tweaking and mounted firewall
Details
       

 07-29-2016
2.50
Trimmed longeron ends; installed F904L attach stri
Details
       

 07-28-2016
1.50
Longeron drilling complete to firewall.
Details
       

 07-27-2016
3.00
Drilled Longerons F-704 and aft
Details
       

 07-07-2016
2.00
Match drilled all holes aft of and including F-704
Details
     

 07-06-2016
2.50
Tweaked fwd longeron bends and F770 conical bends
Details

 07-05-2016
2.50
Conical Bends at Aft/Center fuselage interface, ad
Details
       

 07-03-2016
2.00
Clecoed F770 side skins to fuselage, clamped longe
Details

 06-30-2016
2.00
Aileron Trim Kit assembled/test mounted
Details
       

 06-29-2016
2.00
Riveted F715 end seat ribs and tested longeron
Details
       

 06-28-2016
2.50
Deburred/dimpled F715 seat ribs and F776 skin, sea
Details

 06-27-2016
0.50
Reorganized shop and reconfigured sawhorses
Details
       

 06-27-2016
2.00
Drilled F715 ribs to F776/F704/H, drilled floor sk
Details
       

 06-26-2016
4.50
Riveted F776 skin to center section structure
Details
       

 06-23-2016
2.00
AN3/AN4 bolts torqued to F704 assembly, clecoed F7
Details
       

 06-22-2016
4.00
Riveted center section structure.
Details
       

 06-21-2016
1.50
Riveted all NPs on F716s and forward cover support
Details

 06-20-2016
3.50
Prepped and primed all center section parts
Details
       

 06-19-2016
2.00
VHF comm mounts fabricated. F776 debur & dimple
Details
     

 06-18-2016
0.50
Deburred F776 edges
Details

 06-17-2016
2.00
Misc center section tasks
Details

 06-16-2016
3.00
Drilled Crotch Strap Brackets
Details
       

 06-15-2016
1.00
Fabricated and drilled F623A AFT straps.
Details
       

 06-14-2016
1.50
Drilled, Cut, Deburred F-623 holes and ends.
Details

 06-13-2016
4.00
Drilled F704H to F704 assembly. F623s started
Details
       

 06-12-2016
5.50
Deburred all baggage ribs, flanged and fluted all
Details
     

 06-11-2016
1.50
Deburred 4 F716 ribs, drilled holes for forward co
Details
       

 06-10-2016
5.00
Control Mount lightening areas, 6 F715/F716 ribs d
Details

 06-09-2016
1.00
F704 Work - drilled control mounts and cover suppo
Details
     

 06-05-2016
1.50
Drilled control column mounts - initial hole, acce
Details
     

 06-04-2016
0.75
Cut 1.5" holes in the 4 center F-716 ribs and cut
Details

 06-02-2016
3.00
Aft Fuselage riveting completed
Details
       

 06-01-2016
3.50
Aft Fuselage riveting with Ralph - lower areas
Details

 05-27-2016
1.00
More adjustment to F712/711 - reclecoed
Details
       

 05-26-2016
3.00
Riveted F779, F711, F712 and bolted WD-409
Details
       

 05-25-2016
2.00
Primed aft skins and misc parts
Details

 05-23-2016
4.00
F773 R and L tailcone sideskins deburred and dimpl
Details

 05-22-2016
0.50
Rudder Cable Fairings cut, shaped and deburred
Details

 05-19-2016
2.00
Aft bottom skin deburred edges, drilled transponde
       

 05-18-2016
2.00
Deburred and dimpled all Jstringers, F779 skin
Details

 05-17-2016
2.00
Deburred and dimpled all bulkhead holes
Details

 05-15-2016
2.50
Drilled Static Ports and Disassembled entire aft f
Details

 05-14-2016
1.50
J-stringers drilled
Details
       

 05-13-2016
1.00
AN174-14A Close Tolerance Bolt for WD-409
Details

 05-12-2016
1.00
F712 - clearanced aft tabs and more adjusting. F6
Details

 05-11-2016
2.00
F711 and F712 flanging
Details

 05-10-2016
2.00
Drilled lower J-stringers in aft most tail
Details

 05-09-2016
4.00
WD-409 and tailspring drilled to final size
Details
     

 05-08-2016
2.00
Clecoed entire aft fuselage
       

 05-07-2016
2.00
WD-409 and F711/712/779 measurement/fitting
Details
       

 05-06-2016
3.00
Finished riveting F705, flap bushings drilled, F70
Details
       

 05-04-2016
2.00
Riveted all AFT bulkheads
Details
     

 05-03-2016
3.00
Primed alll bulkheads
Details
       

 05-02-2016
8.00
F705 Final prep
Details
       

 05-01-2016
4.00
F705 continued - finished F634s, and deburred all
Details

 04-30-2016
2.00
Drilled F634 lap belt anchors
Details
       

 04-29-2016
2.00
F705H spacer drilled
Details

 04-28-2016
1.50
F705 C/B Drilled
Details

 04-26-2016
1.00
Began F-705 and cut F705-B/K
Details
       

 04-25-2016
3.00
Finished and debured/fluted F-706
Details

 04-24-2016
2.00
F706 and autopilot bracket started
Details
       

 04-22-2016
1.00
F729-A/B/C and F-728-A/B fab
Details
     

 04-21-2016
1.00
Finished F707 and F708 including deburr and flutin
Details
     

 04-20-2016
2.00
Drilled F707 and F708 including rudder bushing hol
Details

 04-19-2016
3.00
Drilled F711-A/B/C/D, deburred/finished
Details
       

 04-18-2016
5.00
Aft fuselage bulkheads - prep
Details
     

 04-14-2016
2.50
Deburred and Finished all J-channels
Details
     

 04-13-2016
1.00
Cut J-stringers
Details
     

 04-12-2016
1.50
Riveted new F601Js. Firewall done!
Details
       

 04-05-2016
3.00
FW riveting - all except F-601J
Details
       

 04-04-2016
2.00
Primed and top coat of FW angle and doublers

 04-03-2016
7.00
Deburred/Dimpled SS FW, made another F601J-L
Details

 04-02-2016
7.50
Deburred and prepped, countersunk all angles/doubl
Details

 03-28-2016
1.50
Disassembled FW, csk SS nutplate holes, fabricated
Details

 03-20-2016
3.50
Firewall - final item prep
Details
       

 03-18-2016
5.00
Firewall Misc: Heater Valve, Transducer Manifold,
Details
       

 03-17-2016
1.00
Parking Brake Mount Fabrication - completed
Details
     

 03-15-2016
2.00
Parking Brake Mount Fabrication
Details
     

 03-14-2016
2.50
FW - completed match drilling including F-601J ang
Details
       

 03-11-2016
2.50
Match drilled FW and F601J fabrication
Details
       

 03-08-2016
3.00
Completed inventory and organization
Details

 03-07-2016
5.00
Fuselage Arrived and Inventory
Details
       

 02-20-2016
1.50
Pre-prepped Parts for Firewall
Details
     

 02-19-2016
2.00
Deburring F721-B Aft Canopy Decks and F714 Aft Dec
Details
       

 02-18-2016
5.00
New RIGHT Longeron Completed
Details
       

 02-14-2016
1.50
Downward Bend LEFT Longeron
Details

 02-09-2016
4.00
Final finishing of R & L shallow bends and drilled
Details
       

 02-08-2016
5.00
Finished most of LEFT bend and started RIGHT bend,
Details
       

 02-07-2016
3.00
Shallow Bend in LEFT Longeron
Details
     

 02-01-2016
3.00
F704 Final Finishing
Details
       

 01-28-2016
0.50
F-704 Nutplates riveted to center section x 18
Details

 01-27-2016
2.00
F704 Center Section Riveting
Details
       

 01-27-2016
3.00
Aft deck relief notches in longerons & F704M reinf
Details
       

 01-26-2016
2.00
F704M -R/L stiffeners fabricated, drilled, deburre
Details

 01-25-2016
4.00
F704 Center Section - Initial Drilling
Details
       

 01-24-2016
3.50
Battery Box
Details
       

 01-23-2016
1.00
More aft longeron filing/dressing
Details

 01-18-2016
2.00
Cut aft longeron areas - bulkhead interface
Details
       

 01-16-2016
2.00
Longerons
Details

 01-09-2016
9.00
Rudder Bottom Fairing Done!
Details
       

 01-08-2016
3.00
Rudder Bottom Fairing - Riveted on
Details
       

 01-08-2016
1.00
Ordered Fuselage!
Details

 01-07-2016
2.00
Test Fit of Whelen Nav/Strobe
Details
       

 01-06-2016
3.00
Rudder Bottom Fairing Work
Details

 01-04-2016
1.00
More Trim of Rudder Bottom Fairing

 01-03-2016
1.00
Rough Trim of Rudder Bottom Fairing

 12-20-2015
4.00
Wings Done!
Details
       

 12-19-2015
1.00
More wingtip sanding and fiberglass clean up.
Details

 12-13-2015
4.00
ER Tank Fuel Cap Access Door and Wingtip
Details
       

 12-11-2015
1.00
ER Tank Fuel Cap Access Door Work
Details
     

 12-10-2015
6.00
ER Tank Fuel Cap Access Door work
Details
       

 12-09-2015
3.00
Fiberglass work on wingtips
Details

 12-08-2015
1.00
Fiberglass work on wingtips - micro
       

 12-07-2015
4.00
ER Tank Finish Work
Details
       

 12-05-2015
9.00
More ER Tank Work
Details
       

 12-04-2015
6.00
ER Tank Misc.
Details
       

 12-02-2015
2.00
ER Tank Inboard Mount Doublers/Nutplates Fabricate

 11-30-2015
7.00
ER Tank - inboard mounting area
Details

 11-29-2015
1.00
Trimmed ER Tank Access doublers

 11-28-2015
3.00
Removed Main Tanks, Cut ER Access doublers and pan

 11-22-2015
3.00
Additional flox inside of trailng edges of tips.
Details

 11-21-2015
3.00
Wing Tip - Trailing Edge Fiberglass Work
Details
       

 11-20-2015
4.00
Wing Finishing Tasks
Details

 11-19-2015
2.00
Re-do of short aileron pushrods
Details
       

 11-18-2015
4.00
Finished Tip Hinge Install
Details
     

 11-17-2015
3.00
Wingtip hinge prep
Details

 11-16-2015
4.00
Drilled tip hinges x 4.
Details

 11-15-2015
1.00
Drilled Wingtips
Details
     

 11-14-2015
0.50
Fabricated 1/2" nylon aileron stops

 11-13-2015
1.50
Began fitting wingtips

 11-12-2015
4.00
Final flap hinge install
Details
       

 11-10-2015
3.00
Drilled R Flap hinge. Painted Aileron pushrods (l
       

 11-09-2015
3.00
Fabricated and finished long aileron pushrods
Details
       

 11-08-2015
2.00
Fabricated short aileron pushrods
Details

 11-07-2015
6.00
Riveted Ailerons R & L
Details
       

 11-06-2015
6.00
Final prep and priming
Details
       

 11-04-2015
2.15
Deburred and dimpled FWD skins and spars.

 11-03-2015
3.00
Forward aileron work
Details

 11-02-2015
2.50
Drilled aileron spars, ribs, counterbalance pipes
       

 10-30-2015
4.00
Finished aileron stiffeners, riveted. Trailing ed
Details

 10-29-2015
5.00
Cut all 32 aileron stiffeners, deburred aft skins
Details
       

 10-26-2015
10.50
Riveted R & L Flaps
Details
       

 10-25-2015
3.00
Primed Flap parts and skins
       

 10-25-2015
2.00
Made Flap Jig
     

 10-23-2015
11.00
Prep of Flap Parts
Details

 10-22-2015
4.00
Fabricated Flap Hinges, drilled nutplates
       

 10-21-2015
5.00
Drilled Flap Skins/Ribs
Details
       

 10-19-2015
4.00
Riveted RIGHT Outboard Bottom Skin
Details
       

 10-16-2015
5.50
Riveted LEFT Outboard Bottom Skin
Details
       

 10-12-2015
2.00
Rescured wiring and pitot/AOA lines near bellcrank

 10-10-2015
10.00
Riveted R & L Inboard Bottom Skins
Details
       

 04-23-2015
2.00
Riveted Flap Braces, Clecoed INBD skins
       

 04-20-2015
3.00
Riveted Aileron Brackets and Aileron Gap Seals
       

 04-18-2015
3.00
Painted all bottom wing skins, flap braces/aileron
Details
       

 04-17-2015
3.00
Dimpled alll 4 bottom wing skins
       

 04-16-2015
2.00
Deburred all 4 bottom wing skin holes
Details

 04-14-2015
4.00
Deburred all 4 bottom skin edges.

 04-12-2015
2.00
Built wing cart
       

 04-11-2015
3.50
Deburred flap braces and aileron gap seal edges.
Details

 04-05-2015
1.50
Prepped aileron gap seals and flap braces
Details

 04-01-2015
1.50
Drilled aileron gap seals and flap braces - both w
       

 03-31-2015
1.50
Drilled aileron brackets to rear spars

 03-27-2015
2.00
Fiberglassed in Marker Beacon antenna
     

 03-23-2015
2.00
Marker Beacon Antenna Install - R wing
Details
     

 03-15-2015
3.00
Fabricated Pitch Trim Harness and D-sub

 03-10-2015
3.00
Finished wing wiring
Details
       

 03-09-2015
4.00
Roll Servo Install, L/R aileron bellcranks install
Details
       

 03-07-2015
5.00
Autopilot Roll/Pitch Servo Harnesses Fabricated
Details

 03-04-2015
3.00
Terminated Land/Taxi, Nav/Stobes/VOR wiring ends

 03-03-2015
3.00
Landing/Taxi Wiring, Nav/Strobe, VOR runs

 03-01-2015
8.00
Installed Pitot Mast, AOA & Pitot Tubing Wiring
       

 02-28-2015
7.00
Riveted RIGHT Top Wing Skins
Details
     

 02-24-2015
2.00
Deburred and riveted Landing and Taxi Lights

 02-20-2015
1.00
Installed Conduit in L Wing
Details
       

 02-15-2015
7.00
Riveted LEFT Top Wing Skins
Details
       

 02-14-2015
1.50
Primed and Riveted Aileron Brackets
     

 02-10-2015
2.00
Prepped Aileron Brackets and drilled all holes and

 02-06-2015
3.00
Removed and Reinstalled Tanks - Edge Forming
Details

 02-01-2015
1.50
Installed both tanks
Details
       

 01-31-2015
3.00
Leak Tested both tanks
Details
       

 01-30-2015
1.50
Installed Inboard Coverplates/fuel pick ups and di
       

 01-29-2015
3.50
Encapsulated all shop heads on rear baffles
Details
     

 01-28-2015
5.00
RightTank Baffle and Z Brackets Installed
       

 01-27-2015
0.50
Left Tank Interior Photos
       

 01-27-2015
6.00
Left Tank Baffle and Z Brackets Installed
       

 01-25-2015
2.50
Fuel Pick ups/anti-rotation brackets and IB Cap se
Details
       

 01-23-2015
4.00
Outboard ribs riveted.
Details
       

 01-22-2015
4.00
Inboard Ribs and T-405/T-410's installed.
Details
       

 01-21-2015
3.50
Fabricated Fuel Vent Lines. Outboard cap senders.
Details

 01-20-2015
3.50
Encapsulated all inboard rivet heads in sealant.

 01-17-2015
9.00
Riveted all L and R inboard ribs.
       

 01-15-2015
2.00
BNC, vent bulkhead fitting install. OB cap sender
Details

 01-14-2015
4.00
Cleaned all inboard rib holes, removed excess seal

 01-13-2015
0.50
Pushed in all clecoes and pushed excess sealant t

 01-12-2015
5.00
Fay sealed all Left and Right internal ribs.
Details
       

 01-09-2015
3.50
Riveted Fuel Caps and Clips
Details
       

 01-07-2015
4.00
Riveted left tank stiffeners
Details
       

 01-06-2015
4.00
Right tank stiffeners
Details
       

 01-04-2015
2.00
Dimpled tank skins

 01-02-2015
3.00
Deburred all tank skin and baffle holes and scotc
     

 12-20-2014
3.00
Dimpled stiffeners, new T-410s drilled, skins edge

 12-19-2014
2.00
Prepped ribs, clearanced T-405s. Riveted Tank Acc
     

 12-15-2014
2.00
Deburred all rib holes. Dimpled all ribs with str

 12-13-2014
9.00
Drilled all Stiffeners, Cap Sender NP's, Vent Line
Details
       

 12-12-2014
3.00
Drilled T-405 / T-410 attach/reinforcements and Ca
Details
       

 12-10-2014
4.00
ER Tank attach holes, tank drains, flycut access c
Details
       

 12-09-2014
7.00
Deburred holes, BNC/vent/ER tank holes, fuel caps
Details
       

 12-08-2014
1.50
Countersunk tank skins for rear baffles
     

 12-07-2014
2.00
Fabricated Tank Attach brackets
     

 12-03-2014
2.00
Match drilled both L/R tank skins to ribs
     

 12-02-2014
2.00
Cut stiffeners, drilled cover plates for fuel pick

 11-23-2014
1.00
Installed Tank Joint Plate and ER Tank Access nutp
       

 11-22-2014
5.00
Riveted both leading edges to spars, clecoed top s
Details
       

 11-20-2014
4.50
Riveted both leading edge skins to ribs and primed
       

 11-19-2014
2.00
Countersunk R wingspars top/bottom and L wing bott

 11-18-2014
4.50
Dimpled Wing Ribs and Coutersinking of L top spar
Details

 11-17-2014
2.00
Deburred wing skeletons (spars/ribs) for both wing

 11-16-2014
4.00
Primed top skins and LE parts
Details
       

 11-15-2014
5.00
Deburred Top Skin Holes, Dimpled and Cleaned

 11-14-2014
3.50
Deburred all top skin edges and wing walks.

 11-12-2014
1.00
Devinyled all top skins.
Details

 11-08-2014
3.00
LE Deburring and Dimpling
Details

 11-06-2014
2.00
Deburred LE skins
Details

 11-02-2014
4.00
LE Deburring, skins and holes
Details

 11-01-2014
8.00
Pitot Tube Mount, Landing Lights, new L LE rib
Details
     

 10-27-2014
4.00
Match drilled bottom skins and fab'ed pitot bracke
Details
       

 10-26-2014
4.00
Match Drilled Top Skins and LE's
Details
       

 10-24-2014
2.00
Landing Light holes cut
Details
       

 10-21-2014
1.00
Landing Light marking

 10-20-2014
3.00
Drilled outboard Z brackets and R leading edge ins
Details
       

 10-19-2014
8.50
Z bracket to baffle drilling - tank clecoed
Details
       

 10-18-2014
1.00
Prepped new 408-1L inboard LE rib and W-423 joint
Details
     

 10-17-2014
1.00
Deburred Z brackets

 10-16-2014
1.50
Drilled Z brackets for nutplates
     

 10-15-2014
0.50
Riveted Inboard Z-bracket nutplates to spars

 10-14-2014
2.00
Drilled Z brackets to spars
       

 10-13-2014
2.00
Drilled Z bracket center holes

 10-12-2014
1.00
Drilled Tie Down Ring holes
       

 10-10-2014
2.00
Drilled 408-1L/R LE ribs and W-423 joint plates to

 10-09-2014
2.00
Drilled wing walks, clecoed L/R top skins, clecoed
       

 10-08-2014
3.00
Fabricated rear spar brackets to wing stands, re-l

 10-07-2014
1.00
Fabricated wing jacks; checked spars with fishing
       

 10-06-2014
7.00
Wing Stand Set Up
Details
       

 10-05-2014
2.00
Riveted R main ribs to and rear spar and clecoed L
Details
       

 10-04-2014
7.00
Main Ribs riveted to spars
Details
       

 10-03-2014
4.00
Match drilled and deburred all main ribs to spar
       

 10-02-2014
4.00
Primed all main and LE ribs
       

 10-01-2014
1.00
Cleaned all ribs with mineral spirits, fluted both

 09-28-2014
1.00
Final rib scotch-brite

 09-27-2014
1.00
Drilled rear spar to main rib lower (small) flange

 09-26-2014
1.00
Flanged and Fluted All Tank Ribs
       

 09-26-2014
0.50
All Ribs Completed
Details
       

 09-25-2014
3.00
Deburred 10 Remaining Tank Ribs

 09-24-2014
1.50
Deburred 4 Tank Ribs

 09-23-2014
3.00
Deburred 5 Wing Nose Ribs, Flanged and Fluted

 09-22-2014
2.50
Deburred 7 Wing Nose Ribs

 09-17-2014
1.50
Drilled Main Wing Ribs for Conduit/Wiring

 09-16-2014
1.00
Painted Wing Stands
       

 09-16-2014
2.50
Completed Main Wing Ribs
Details

 09-15-2014
2.00
Fabricated Aluminum Spar Attach Brackets for Stand

 09-12-2014
1.50
Welded Floor Brackets to Uprights
Details
       

 09-10-2014
1.50
Welded Floor Brackets to Uprights

 09-08-2014
2.00
Fabricated Steel Wing Stand Parts

 08-30-2014
4.00
Deburred 10 Main Wing Ribs

 08-27-2014
2.00
Deburred 4 Main Wing Ribs

 08-24-2014
1.00
Completed Flanging Tool
       

 08-23-2014
1.00
Deburred 2 Ribs

 08-23-2014
1.50
Built Flanging Tool

 08-22-2014
1.00
Inventoried and Relabeled Wing Ribs
     

 07-25-2014
0.50
Spars Completed
       

 07-24-2014
1.50
Rear Spars - Riveted
       

 07-22-2014
1.50
Rear Spars - Primed
       

 07-20-2014
1.50
Rear Spars - Deburring Completed
     

 07-18-2014
2.50
Rear Spars - Deburring
       

 07-13-2014
2.50
Rear Spars - Match Drilled and Aileron Pushrod Hol
       

 07-12-2014
3.00
Main Spar - Tank NP Countersinking Cont'd
Details
     

 07-11-2014
1.00
Main Spar - Tank NP Countersinking
Details
       

 07-10-2014
2.00
Rear Spars - Attach Area Trimmed and Match Drille
Details
     

 07-09-2014
2.00
Main Spar - Installed Tie Downs and Aileron Bellcr
Details

 07-08-2014
1.00
Main Spar - Tie Downs Completed
Details
     

 07-07-2014
2.00
Main Spars - Drilled Tie Downs

 07-05-2014
3.50
Main Spars - Tie Downs
Details
       

 07-04-2014
3.00
Main Spars - Riveted Fuel Tank and Inspection Pane

 07-03-2014
2.00
Main Spar - Primed CSKs and tested NP countersinks
Details

 07-02-2014
3.00
Main Spar Nutplates - #40 CSK
Details
       

 06-13-2014
2.00
Wing Kit Inventory
Details
       

 06-08-2014
3.00
Drilled Elevator horns
Details
     

 06-07-2014
4.00
Empennage Tips - Finished
       

 06-01-2014
1.00
Empennage Tips - Sanded, Glassed and Filled

 05-23-2014
2.00
Empennage Tips - Sanded, Glassed and Filled

 05-20-2014
2.00
Empennage Tips - Sanded, Glassed and Filled

 05-17-2014
6.00
Empennage Tips - Sanded, Glassed and Filled

 05-11-2014
3.00
Empennage Tips - added basswood stiffeners
     

 05-10-2014
4.00
Empennage Tips - Riveted
Details

 05-07-2014
4.00
Trim Tab - #2
Details
       

 05-04-2014
4.00
Elevator - Rolled leading edges
Details
       

 05-03-2014
5.00
Trim Tab and Left Elevator Riblet
Details
     

 05-02-2014
12.00
Elevator Riveting
Details
       

 05-01-2014
3.00
Elevators - Deburr, Dimple, Prime

 04-30-2014
3.00
Elevator - Deburr and Dimple

 04-21-2014
2.00
Elevator Skins Drilled
Details
     

 04-19-2014
2.00
Elevator Stiffeners Riveted
Details
       

 04-18-2014
2.00
Elevator Stiffeners - primed
Details

 04-17-2014
5.00
Elevator Stiffeners - deburred
Details

 04-11-2014
2.00
Elevator Stiffeners Drilled to Skins
Details

 04-10-2014
3.00
Elevator Stiffeners
Details

 04-06-2014
3.00
Elevator Counterweights shaped and drilled
Details

 04-05-2014
3.00
Elevator Stiffeners fabricated
Details
     

 04-03-2014
4.00
Rudder Leading Edge rolled and riveted
Details

 04-03-2014
4.00
Elevator Spars, ribs and counterweight assemblies
Details
     

 04-02-2014
2.00
Rudder Trailing Edge - riveted
Details
       

 03-28-2014
8.00
Riveted Rudder, clecoed trailing edge
Details
       

 03-27-2014
3.00
Deburring of Rudder Skeleton, priming and painting

 03-25-2014
2.00
Rudder Skeleton match drilled
Details
     

 03-24-2014
1.00
Rudder skins and stiffeners riveted
Details
     

 03-23-2014
5.00
Rudder Skins and Stiffeners
Details
     

 03-20-2014
2.50
Rudder Stiffeners Match Drilled
Details
     

 03-16-2014
2.00
Rudder Stiffeners - cut to size
Details

 03-13-2014
5.00
HS Skins Riveted
Details
       

 03-10-2014
4.00
HS Skeleton riveting
Details
       

 03-09-2014
11.00
HS Deburring/Painting
Details
       

 03-06-2014
4.00
HS Forward Spar - replaced reinforcement bar
Details

 02-20-2014
4.00
Deburred HS Spars
Details

 02-18-2014
4.00
HS Spars
Details
       

 02-18-2014
6.00
HS Spar - match drilled HS Spars and added SB kit
Details

 11-18-2013
3.00
Vertical Stabilizer - riveted
Details
       

 11-16-2013
5.00
Vertical Stabilizer - Deburring of parts - CSK, di
Details

 11-13-2013
3.00
Vertical Stabilizer - Deburring of parts - spars,
Details
     

 11-12-2013
2.00
Vertical Stabilizer - Match drilled skins, ribs an
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.