KitLog pro

Powered By Kitlog Pro v2.0

Terry Wighs
Work Logs Found: 92
Category Work Time: 252 Hours
 Date
Hours
Work Log Summary

Details

 06-20-2015
3.00
Control Stick wiring. Mounted Rear Control Stick
       

 04-03-2015
1.00
Mounted Tail Decals and "N" number
     

 03-20-2015
2.00
Mount Horizontal and Vertical Stabilizer to Fusela
       

 03-08-2015
3.00
Mount Horizontal and Vertical Stabilizers to Fusel
     

 03-07-2015
3.00
Paint tips of Horizontal and Vertical Stabilizers
       

 11-06-2014
1.00
Permanent mounting of Horizontal Stabilizer
Details
     

 10-22-2007
0.25
Ruddder attacked to Vertical Stabilizer
Details
       

 10-21-2007
0.25
attaching elevators/balance check
Details
     

 10-07-2007
1.00
Painting elevator trim
Details
       

 09-24-2007
2.00
Painting elevators
Details
       

 09-05-2007
2.00
Final paint vertical stabilizer
Details
     

 08-28-2007
1.50
Painting rudder
Details
     

 08-15-2007
1.00
Painting tips of Horizontal stabilizer
     

 07-08-2007
3.00
Painting the vertical stabilizer
Details
       

 06-03-2007
0.45
Test painting with primer...Acryo-Glo...FFA Blue
Details
       

 10-15-2006
20.00
Empennage fiberglass tips
Details
       

 08-07-2006
3.00
Elevator misc. work
Details
       

 08-03-2006
3.50
Roll leading edges of both elevators & rivet
Details
     

 06-01-2006
3.00
Elevator trim tab repair work
Details

 05-31-2006
2.00
Elevator trim tab work finished

 05-30-2006
1.00
Elevator trim tab hinge work

 05-28-2006
4.25
Elevator trim tab work

 05-25-2006
3.50
Building the elevator trim tab

 05-24-2006
1.50
Left elevator riveting /elevator hinge completed

 05-23-2006
6.00
Left elevator/servo work
Details
     

 05-22-2006
5.00
Preparation and bending Left elevator tabs

 05-21-2006
3.00
Left elevator riveting
Details
       

 05-15-2006
2.00
Elevator trim nutplates installed/servo unpacked

 05-14-2006
2.00
Primer paint left elevator parts

 05-13-2006
2.00
Left elevator dimpe work

 05-09-2006
2.50
Left elevator edge finishing/deburring

 05-07-2006
2.00
Left elevator understructure/skin work
Details
     

 05-06-2006
2.50
Finsih up right elevator

 05-06-2006
3.00
Elevator Rt. and Left parts primer painted

 05-05-2006
1.50
Preparation of elevator parts for primer paint

 05-03-2006
0.25
Bolt, torque, torque seal HS-411PP to spar

 05-01-2006
4.00
Left stiffeners/elevator, misc. work
Details

 04-30-2006
3.00
Left elevator spar/reininforcement plates
Details

 04-30-2006
3.00
Left elevator skin edge finishing

 04-29-2006
4.00
Rt. elevator riveting
     

 04-29-2006
1.50
Rt elevator parts primer painted

 04-28-2006
1.50
Rt edge deburring metal prep/alodine

 04-26-2006
2.00
Rt elevator countersinking/dimpling
Details

 04-25-2006
1.00
Drilled Rt elevator skin to understructure

 04-24-2006
4.00
Rt elevator/horn work

 04-23-2006
4.50
Rt elevator stiffener/parts work

 04-22-2006
3.50
Rt elevator spar/rib work

 04-20-2006
2.50
Rt elevator rib/counter balance work

 04-19-2006
1.50
Elevator skin/stiffener work
Details
     

 04-18-2006
4.00
Elevator stiffener work continued
Details

 04-16-2006
2.50
Elevator stiffener work continued

 04-15-2006
4.00
Horizontal stabilizer riveting completed/finished
       

 04-13-2006
4.50
Trimming elevator stiffeners

 04-10-2006
3.00
Right horizontal stabilizer riveting continued

 04-07-2006
3.00
Left Horizontal stabilizer riveting continued

 04-06-2006
0.75
Horizontal Stabilizer skin/spar further riveting

 04-05-2006
1.50
Continued Horizontal Stabilizer riveting

 04-03-2006
8.00
Vertical Stabilizer riveting completed
     

 04-02-2006
2.50
Vertical Stabilizer riveting continued

 04-01-2006
5.00
Vertical Stabilizer cleco/riveting

 03-31-2006
0.50
Rudder leading edge rolling/riveting
Details
       

 03-30-2006
6.00
Rudder riveting completed

 03-29-2006
3.50
Rudder riveting
       

 03-19-2006
1.50
Rudder skeleton edge finishing
Details

 03-18-2006
3.00
Rudder skeleton deburr, edge finishing
Details

 03-15-2006
0.25
Drill R-713 holes to R-801PP final size
Details
     

 03-14-2006
1.00
Rudder attach strips/counterbalance skin to unders

 03-10-2006
5.00
Rivet Horizontal stabilizer
Details
       

 03-09-2006
3.00
Dimple Rudder skin, rivet stiffeners to rudder
     

 03-07-2006
5.00
Primer paint sprayed
Details
     

 03-05-2006
4.00
Horizontal stabilizer parts prepared for primer pa
Details

 02-19-2006
6.00
Rudder skeleton
Details

 02-18-2006
1.00
Fabricate R-717 spacer/both R-716 bottom rudder st

 02-16-2006
0.50
Rudder reinforcement plates to R-802PP spar

 02-15-2006
3.00
Building the rudder
Details

 02-12-2006
4.00
Building the Rudder
Details

 02-06-2006
3.00
Vertical stabilizer parts prepared for primer pain
Details
       

 02-02-2006
1.00
Drilled,deburred,dimpled Horizontal stab. skin
Details
       

 01-26-2006
3.00
Redo VS706 part
Details

 01-16-2006
1.50
Finish horizontal stabilizer deburring of skin/ske

 01-15-2006
2.00
Horizontal stabilizer deburring skin/skeleton

 01-13-2006
2.00
Match drill VS-801PP/VS-901 skin

 01-09-2006
3.00
Drilling, deburred, dimpled Vertical Stabilizer
Details
     

 01-07-2006
0.50
Drilling Vertical Stabilizer

 12-30-2005
2.00
Finish HS-702 spar to HS-801 drilling

 12-29-2005
2.00
Finish skin HS-801 drilling

 12-28-2005
5.00
Left horizontal stabilizer
Details

 12-26-2005
3.00
Rib preparation..edges/fluting...Drill rt. horizon
Details

 12-19-2005
0.50
Front Spar assembly...dimple HS-702, countersink H

 12-13-2005
0.50
Front spar assembly...bending HS-810/814

 12-08-2005
1.55
Rear & Front spar assembly

 12-07-2005
2.00
Horizontal Stabilizer, rear spar assembly










Copyright © 2001-2024 Matronics. All Rights Reserved.