Terry Wighs
Work Logs Found: 214
Category Work Time: 474 Hours
 Date
Hours
Work Log Summary

Details

 06-06-2016
2.00
Driving and installing remaining wing attachment b
Details
       

 06-05-2016
1.00
Leveling and dropping plumb lines to square wings
Details

 05-20-2016
3.00
Attached Wings to Fuselage
       

 05-13-2016
2.00
Transported Fuselage from Garage to Hanger
       

 03-27-2016
3.00
Soldering finished on Pilot control stick
       

 08-30-2014
1.00
Primer Paint Battery Box Angles, and other parts.
Details
       

 08-24-2014
3.00
Front Spar Attach Angles
Details
       

 05-24-2012
0.00
AIRPLANE PACKED IN UHAUL FOR ALASKA TRIP
Details

 02-16-2012
2.00
Tie wrap Electical, Battery, control Rod
Details
     

 02-04-2012
1.00
Finished Riveting top Aft Skin

 09-17-2011
3.00
Construct Plywood floor, Aft Fuselage
Details
     

 09-12-2011
1.00
Rivet Rudder Stops
     

 09-10-2011
1.00
Clecoed and started riveting Aft Top Skin
Details
       

 08-12-2011
1.50
Painted interior Grey parts.
Details
       

 08-07-2011
1.50
Mounted Vinyl "N" numbers on Fuselage
     

 06-07-2011
2.00
Landing gear mounted
Details
     

 06-02-2011
0.50
Rivet Vertical Stabilizer Front Spar/Bracket /Spac
     

 05-29-2011
2.00
Rivet Platenuts on Instrument Sub-Panels
     

 05-28-2011
1.00
Fabricate Brackets for ELT/Strobe Mounting platfor
Details
       

 05-26-2011
2.00
Installed SV Vent in Fuselage
       

 05-24-2011
1.00
Finished Baggage Door Lock Installation
       

 05-23-2011
3.00
Rivet Baggage Door/ Begin Lock Install
       

 05-22-2011
2.00
Prime Painted Baggage Door and Structures
Details
       

 05-11-2011
1.50
Deburred and Dimpled Baggage Door
     

 05-09-2011
2.00
Deburred Front Top Skins/Structures
Details
     

 05-08-2011
2.00
Baggage Door Started, drilled out, Hinge work.
       

 05-05-2011
3.00
Fabricate/Adjust Forward Elevator Horn Stop
Details
 

 05-04-2011
4.00
Intrument Sub Panels/Windscreen Support
Details
       

 05-03-2011
2.00
Drilled Out Windscreen Support/Rudder Stops
Details
     

 05-01-2011
1.00
Fabricated Static Line Fittings (6)

 05-01-2011
1.00
Fabricate Rear Seat Belt Anchors

 04-30-2011
1.00
Checked Elevator Travel

 04-27-2011
2.00
Drilled Elevator Horns and Connected Control Rods

 04-25-2011
4.00
Horizontal and Vertical Stabilizer Work
       

 04-24-2011
3.00
Empennage Attachment Started
       

 04-22-2011
1.00
Static Port and Line Installed
     

 04-20-2011
1.00
Grey Painted Interior Console
     

 04-17-2011
1.00
Prime Paint Miscelllaneous Parts
     

 04-16-2011
2.00
Installed Aileron Electric Trim Servo and Rod

 04-12-2011
0.50
Flap Motor Started

 04-10-2011
3.00
Fuel Line fabricated and installed

 04-08-2011
2.00
Fuel Vent lines fabricated and installed

 04-07-2011
1.00
Rivet Aft Rudder Cable Fairings Anchor
       

 04-06-2011
1.50
Intalled Brake Reservoir and Initial Elbow Fitting
     

 04-05-2011
1.00
Rudder Cables Installed

 04-04-2011
2.00
Connect Bellcrank Assembly to Control Rods/Sticks
       

 04-03-2011
2.00
Rivet Bottom Forward/Cooling Ramp
       

 03-24-2011
2.00
Cooling Ramp Installed/Forward Bottom Skin Riveted
       

 03-14-2011
2.00
Rivet Rudder Support Floor Angles/ Front Bottom Pa
       

 03-12-2011
1.00
Assemble Rudder/Brake Pedals
     

 03-10-2011
2.00
Paint Interior Grey/ Seats, and redo console
Details
       

 03-07-2011
2.00
Paint Interior Grey/ floors, consoles

 03-06-2011
3.00
Miscellaneous, Bracket Work, Deburring, Dimpling
Details
       

 03-05-2011
1.00
Prime Paint Control Tubes/ Rivet and Console
Details
     

 03-04-2011
2.00
Cut Fuel Gauge Holes/ Paint Booth Work
     

 02-26-2011
5.00
Elevator Control System Started
       

 02-24-2011
2.00
Fuel Gauge Cover Started/ Finish Seat Ramps
       

 02-21-2011
2.00
Finish Rear Baggage Anchor
     

 02-20-2011
2.00
Start Rear Baggage Anchor

 02-19-2011
2.00
Finish Seat Ramps and Aux. Longeron Platenuts

 02-16-2011
3.00
Finish Rear Seat Riveting and Seat Ramps
     

 02-15-2011
3.00
Rivet Seats Front and Back
     

 02-13-2011
2.00
Rivet Foot Wells
       

 02-12-2011
2.00
Back Rivet Floor Stiffeners and Hinges
       

 02-11-2011
3.00
Prime Painted Seates and Floor
       

 01-09-2011
2.00
Prime paint seat floors/rear baggage/misc parts
       

 01-08-2011
3.00
Deburred floor/rear baggage skin edges

 01-02-2011
1.50
Dimpled seat floors

 12-29-2010
3.00
Drillled out seat floor stiffeners/rear seat hinge
       

 12-21-2010
2.50
Right/Left Gear Weldment Scews
Details
     

 12-19-2010
1.00
Rivet Right Gear weldment to forward side skin
     

 12-18-2010
1.00
Riveting Left Gear Weldment to forward side skin
     

 11-13-2010
3.00
Flap bearings/foot wells
Details
       

 11-02-2010
3.00
Drill out seat floors/Aft baggage
       

 10-25-2010
1.00
Start seat floors/wells
       

 10-24-2010
2.00
Pulled Wing spar blocks and riveted AN470 rivets
     

 10-23-2010
5.00
Rivet bottom skin center/forward side skins
       

 10-14-2010
1.00
Prime paint gear box interior/rivet center forward
       

 10-09-2010
0.50
Drilled with unibit AN4 Gear access holes
Details
     

 10-04-2010
1.00
Continue belly 3/32 flush riveting

 10-01-2010
1.00
Belly Riveting, and forward mid-longerons (3/32)
       

 09-14-2010
1.00
Deburred Holes Front and Rear Seat Backs
Details
       

 09-13-2010
2.00
Deburred and Dimpled Forward Bottom Skins
       

 09-12-2010
2.00
Drilling Gear
Details
     

 09-12-2010
3.00
Drilled Out Main Landing Gear/Deburred Holes
Details
       

 09-11-2010
3.00
Set-Up for Main Landing Gear Drilling
Details
       

 09-10-2010
0.50
Started Bottom Forward Skins

 09-08-2010
1.00
Finished Drilling Out Front and Back Seat Backs

 09-07-2010
3.00
Started Front Seat Back/Rear Seat Back

 09-05-2010
3.00
Landing Gear Started (Drilling Blocks out)

 08-28-2010
4.00
Installed/Riveted Cockpit Rails/Seat Back Weldment
       

 08-25-2010
2.00
Rivet Forward and Mid-Skins
       

 08-15-2010
3.00
Rivet Forward and Mid-Skins
Details
       

 08-14-2010
4.00
Rivet Aft Deck/ Start Fuel Lines
Details
       

 08-08-2010
4.00
Rivet Aft Skin/Lower Longerons
Details
       

 08-07-2010
5.00
Rivet Aft Skin and Finish Mid-Skins
     

 08-06-2010
1.50
Rivet Rt. Mid-Skin/Longerons/and arm rests

 08-05-2010
1.50
Rivet Mid-Skin/Top Longerons
Details

 08-04-2010
1.00
Rivet F818 to F808, F806A/F Gussets/F805B R/L

 07-31-2010
1.00
Riveted aft belly skin to baggage substructure
       

 07-29-2010
2.00
Rivet right aft skin at bulkheads/longeron keepers

 07-28-2010
2.00
Rivet left aft skin at bulkheads/longeron keepers

 07-27-2010
4.00
Clecoed aft skins/belly skins/mid & lower longeron
       

 07-26-2010
2.00
Clecoed bulkheads/rivet midskin to longerons
       

 07-25-2010
1.50
Grey painted interior parts/battery tray/brackets

 07-24-2010
2.00
Prime painting misc. parts pump/filter brackets
Details

 07-23-2010
1.50
Battery tray drilling/deburring
       

 07-22-2010
1.00
Started Fuel pump/filter brackets

 07-19-2010
1.00
Cover plate aft side skins platenuts/battery tray

 07-17-2010
3.00
Riveted seat rib angles/baggage ribs/F807
       

 07-16-2010
1.00
Riveted upper right longeron

 07-15-2010
1.00
Riveted Left upper longerons
     

 07-14-2010
2.00
Riveted right midskin to arm rest supports
     

 07-13-2010
1.00
Clecoed left mid skin onto fuselage/upper longeron
     

 07-12-2010
2.00
Rivet mid skins to left arm rest substructure
       

 07-11-2010
3.00
Grey Interior Painting on fuselage/longeron parts
       

 07-08-2010
2.00
Prime painting longerons/fuselage substructure

 07-06-2010
2.00
Alumi-Prep/alodine longerons and remaining substru

 07-05-2010
2.00
Finished dimpling skins

 07-04-2010
5.00
Dimple and edge rolling skins

 07-03-2010
3.00
Finished seat rib assembly riveting

 07-02-2010
3.00
Rivet seat rib assembly to under skin

 06-30-2010
3.00
Rivet forward lower longerons/tail cone/attach cen

 06-29-2010
2.00
Finished substructure/bolted forward bottom longer
       

 06-28-2010
3.00
Clecoed and Riveted Aft tail section
Details
       

 06-27-2010
3.00
AKCO Prime painted Substructure and bulkheads
       

 06-24-2010
3.00
Alumi prep/Alodine structural and bulkheads
       

 06-22-2010
2.00
Dimpled aft side skins

 04-28-2010
30.50
Deburring structures and skins /Finished June 21st
Details

 04-27-2010
2.00
Countersinking continued

 04-25-2010
2.00
Countersinking and deburring continued

 04-21-2010
3.00
Countersinking longerons and structure started
     

 04-18-2010
2.50
Finished disassembly of skins/substructure

 04-04-2010
1.00
Drilled out (countersunk) skin under center sectio

 04-01-2010
3.00
Uncleco bulkheads, longerons
Details

 03-29-2010
3.00
Continued drilling out caps,upper aft skin, bulkhe
Details
       

 03-28-2010
2.00
Drilled seatback support
     

 03-27-2010
6.00
Drilled out Upper aft skin, tower webs, rail caps
Details
       

 03-26-2010
2.00
Drilled bottom skin to center section
Details

 03-24-2010
2.00
Drilled out right upper longerons
Details

 03-18-2010
2.00
Drilled out forward right side skin
     

 03-17-2010
2.00
Drilled out forward left skin

 03-16-2010
0.50
Drilled out left upper longerons
Details
     

 03-15-2010
2.00
Drilled out Upper Rt. Longerons
Details
       

 03-11-2010
1.00
Drilled out Right lower & auxillary longerons
     

 03-10-2010
3.00
Drilled out Left lower & auxillary longerons

 03-07-2010
2.00
Upper Longerons
Details
     

 03-06-2010
2.00
Started skin assembly of mid to tail skins.
     

 03-04-2010
3.00
Tail skin assembly
Details
     

 03-03-2010
2.00
Finish deburring and assembly
Details
       

 03-01-2010
1.00
Drilling out landing tail gear
Details
       

 02-28-2010
3.00
Tailcone and bulkheads started
Details
       

 02-27-2010
3.00
Mid-Fuselage arm rests
Details
       

 02-26-2010
4.00
Mid-Fuselage Riveting and Assembly
Details
       

 02-25-2010
2.00
Skin Riveting Seat Rib Sub-Assembly
Details
       

 02-20-2010
2.00
Continued Riveting Seat Rib Sub-Assembly
Details
       

 02-16-2010
2.00
Begin Riveting Seat Rib Sub-Assembly
     

 02-13-2010
2.00
Prime Painted Seat Rib Sub-Assembly
Details
       

 02-06-2010
3.00
Alumi-Prep/Alodine Seat Rib Sub-assembly
     

 01-19-2010
2.00
Mid-Fuselage F-823-1 Skins
Details
       

 01-14-2010
2.50
Mid-Fuselage Started
Details
     

 01-01-2010
6.00
Finished Right and Left Lower/Mid Longerons
       

 12-31-2009
2.50
Drilled Out Right & Left Lower Forward Longerons
       

 12-30-2009
1.00
Finished Bending Lower Longeron Bending
Details
       

 12-28-2009
1.50
Lower Longeron Bending
Details
       

 12-27-2009
2.50
Remove Blue Plastic/Solder Gun/Dimple Countersink

 12-26-2009
1.00
Finished Deburring Seat Rib Assembly
     

 12-17-2009
0.50
Continued Deburring Seat Rib Assembly

 12-14-2009
1.00
Deburr Seat Rib Assembly

 12-09-2009
0.50
Roll Skin Edges below seat assembly
 

 12-08-2009
2.00
Seat Rib Assembly/floor skin drilled

 11-29-2009
1.50
Seat Rib Assembly Started.
Details
       

 11-28-2009
4.00
Riveted Bottom Firewall/Center Section Work
Details
       

 11-25-2009
2.00
Center Seciton Continues
Details
       

 11-24-2009
2.00
Center Section Continues
Details
       

 11-23-2009
0.50
Center Section work
Details
       

 11-22-2009
1.00
Firewall Machine Dimpled/Proseal Applied
Details
       

 11-21-2009
1.50
Gear Tower Fore and Aft Braces Attached
       

 11-20-2009
2.00
Landing Gear Tower Riveted and Finished
       

 11-18-2009
1.50
Landing Gear Tower Weldments Riveted
       

 11-16-2009
2.00
Landing Gear Weldments Bolted
     

 11-12-2009
3.00
Finished Riveting Gear Tower Braces/Panels
     

 11-11-2009
2.00
Started Riveting Gear Tower braces

 11-08-2009
2.00
Finished Riveting Access Door Modification
       

 11-07-2009
4.00
Riveting Access Door Mod. platenuts

 11-03-2009
2.00
Painted Acryglow (Sherm/Williams) on Interior Part
Details

 11-01-2009
3.00
Prime Painted all current prepared parts

 10-31-2009
3.00
Alumi-Prep/Alodine
Details

 10-25-2009
2.00
Center Section Preparation Finished
Details
       

 10-24-2009
4.00
Redo-F849 and continue Center Section work
Details
     

 10-20-2009
1.50
Center Section work continues
Details
     

 10-19-2009
0.25
Center Section Work Begins
Details
     

 10-17-2009
2.00
Forward Fuselage Subfloor
Details
       

 10-16-2009
2.00
Finished Instrument Panel Access Door
Details
     

 10-14-2009
0.25
Compressor Hose
Details
     

 10-12-2009
2.00
Continue Instrument Panel Access Door Mod.
Details
       

 10-11-2009
2.00
Continue Instrument Panel Access Door Mod.
Details
     

 10-10-2009
2.00
Instrument Panel Access Door Mod.
Details
     

 10-04-2009
2.00
Finished deburring Landing Gear Boxes
     

 10-01-2009
1.00
Deburring Landing Gear Boxes continues

 09-30-2009
1.00
Deburring edges and drilled holes
Details

 09-29-2009
2.00
Drilled out Landing Gear Towers
Details
       

 09-24-2009
2.00
Prime subfloor and rivet and Finished Firewall riv
       

 09-15-2009
1.50
Continue Riveting Firewall, and Riveted Cool Air
       

 09-14-2009
1.00
Prime Paint Firewall parts, and Cool Air Ramp angl
       

 09-04-2009
1.50
Dimple subfloor/Alodine parts
     

 09-01-2009
3.00
Final Drilled Fuselage Forward Subfloor & Cooling
       

 08-31-2009
2.00
Finished Firewall Angle work/ Began Forward Floor
Details
     

 08-29-2009
1.00
Firewall Angle Parts Drill Countersunk
       

 08-27-2009
3.00
Dimple Firewall, and Finished deburring
       

 08-25-2009
2.00
Final Drilled Firewall
     

 08-24-2009
3.00
Firewall Started
Details
     

 08-20-2009
4.00
Fuselage Unpacked, and Inventory
Details
       

 08-19-2009
0.25
Fuselage Kit Arrives
Details
       