KitLog pro

Powered By Kitlog Pro v2.0

Terry Wighs
Work Logs Found: 527
Category Work Time: 1215 Hours
 Date
Hours
Work Log Summary

Details

 06-06-2016
2.00
Driving and installing remaining wing attachment b
Details
       

 06-05-2016
1.00
Leveling and dropping plumb lines to square wings
Details

 05-20-2016
3.00
Attached Wings to Fuselage
       

 05-13-2016
2.00
Transported Fuselage from Garage to Hanger
       

 03-27-2016
3.00
Soldering finished on Pilot control stick
       

 03-27-2016
3.00
Electrical Wiring of Servo's with Control Stick
       

 08-01-2015
1.00
Mounted VHF Comm and Transponder Ant.
       

 06-20-2015
3.00
Control Stick wiring. Mounted Rear Control Stick
       

 04-03-2015
1.00
Mounted Tail Decals and "N" number
     

 03-20-2015
2.00
Mount Horizontal and Vertical Stabilizer to Fusela
       

 03-08-2015
3.00
Mount Horizontal and Vertical Stabilizers to Fusel
     

 03-07-2015
3.00
Paint tips of Horizontal and Vertical Stabilizers
       

 11-09-2014
1.00
Install Wire supply to Hobbs and Oil Pressure Ligh
Details
     

 11-06-2014
1.00
Permanent mounting of Horizontal Stabilizer
Details
     

 09-13-2014
1.50
Painted Acyglow Yellow
Details
       

 08-31-2014
1.50
Permanently mounted Battery Box
     

 08-30-2014
1.00
Primer Paint Battery Box Angles, and other parts.
Details
       

 08-24-2014
3.00
Front Spar Attach Angles
Details
       

 03-08-2014
0.50
Drilled and mounted Flap Switch
     

 02-23-2014
2.00
Relocating Battery Box from Aft to Firewall
Details
     

 02-14-2014
2.00
Fabricate Aluminum angles for Firewall Battery Box

 02-11-2014
2.00
Beginning installation of stall warning board
Details
       

 01-17-2014
0.50
Wiring of Fuel pump and switch.
Details
       

 01-14-2014
1.00
Throttle quadrant installation
Details
       

 01-04-2014
1.50
Exterior lights
Details
       

 01-03-2014
1.50
Finished secondary peripheral instrument panel
Details
       

 01-02-2014
0.50
Dimmer unit and Fuse holders installed
       

 08-10-2013
6.00
Cut out remainder of holes for Secondary Panel
Details
       

 03-08-2013
1.00
Cut hole for Master Switch in peripheral panel

 02-27-2013
0.50
Began secondary peripheral instrument panel
Details
       

 02-15-2013
16.00
Several sessions of riveting bottom skins on wings
Details
     

 01-27-2013
2.00
Finished Stall Warning Kit Installation into left
       

 01-20-2013
1.00
Rivet Stall Warning Stiffener Plate / assembly
     

 01-19-2013
4.00
Riveted Winglets, and platenuts to Fiberglass Tips
       

 01-18-2013
2.00
Sand, prime paint Wing tip parts & Stall Warning K
     

 01-04-2013
2.00
Counter Sunk Fiberglass holes Wing tips
     

 01-01-2013
2.00
Drilled out platenut holes Left Wingtip

 12-30-2012
2.00
Drilled out Right Wing Tip Platenut holes
       

 12-24-2012
1.00
Drilled 2 strips Aluminum backing Right Wing Tip
Details
     

 12-22-2012
1.00
Drilled 2 strips Aluminum backing Left Wing Tip

 12-16-2012
2.00
Fit, Cut, drilled, deburred Winglets
     

 12-15-2012
3.00
Fit, cut, drilled out Right Fiberglass Wing Tip
       

 12-08-2012
3.50
Fit, cut, drilled out Left Fiberglass Wing Tip
       

 12-02-2012
1.00
Prep. countersink, deburr remaining Stall kit part
     

 11-29-2012
1.00
Access panel drilling for Stall Warning Kit
Details
     

 11-28-2012
1.50
Cut access hole in leading edge of Wing
Details

 11-27-2012
1.00
Template / Retro Stall Warning Kit Installation
     

 05-24-2012
0.00
AIRPLANE PACKED IN UHAUL FOR ALASKA TRIP
Details

 02-16-2012
2.00
Tie wrap Electical, Battery, control Rod
Details
     

 02-04-2012
1.00
Finished Riveting top Aft Skin

 09-17-2011
3.00
Construct Plywood floor, Aft Fuselage
Details
     

 09-12-2011
1.00
Rivet Rudder Stops
     

 09-10-2011
1.00
Clecoed and started riveting Aft Top Skin
Details
       

 08-12-2011
1.50
Painted interior Grey parts.
Details
       

 08-07-2011
1.50
Mounted Vinyl "N" numbers on Fuselage
     

 06-07-2011
2.00
Landing gear mounted
Details
     

 06-02-2011
0.50
Rivet Vertical Stabilizer Front Spar/Bracket /Spac
     

 05-29-2011
2.00
Rivet Platenuts on Instrument Sub-Panels
     

 05-28-2011
1.00
Fabricate Brackets for ELT/Strobe Mounting platfor
Details
       

 05-26-2011
2.00
Installed SV Vent in Fuselage
       

 05-24-2011
1.00
Finished Baggage Door Lock Installation
       

 05-23-2011
3.00
Rivet Baggage Door/ Begin Lock Install
       

 05-22-2011
2.00
Prime Painted Baggage Door and Structures
Details
       

 05-11-2011
1.50
Deburred and Dimpled Baggage Door
     

 05-09-2011
2.00
Deburred Front Top Skins/Structures
Details
     

 05-08-2011
2.00
Baggage Door Started, drilled out, Hinge work.
       

 05-05-2011
3.00
Fabricate/Adjust Forward Elevator Horn Stop
Details
 

 05-04-2011
4.00
Intrument Sub Panels/Windscreen Support
Details
       

 05-03-2011
2.00
Drilled Out Windscreen Support/Rudder Stops
Details
     

 05-01-2011
1.00
Fabricated Static Line Fittings (6)

 05-01-2011
1.00
Fabricate Rear Seat Belt Anchors

 04-30-2011
1.00
Checked Elevator Travel

 04-27-2011
2.00
Drilled Elevator Horns and Connected Control Rods

 04-25-2011
4.00
Horizontal and Vertical Stabilizer Work
       

 04-24-2011
3.00
Empennage Attachment Started
       

 04-22-2011
1.00
Static Port and Line Installed
     

 04-20-2011
1.00
Grey Painted Interior Console
     

 04-17-2011
1.00
Prime Paint Miscelllaneous Parts
     

 04-16-2011
2.00
Installed Aileron Electric Trim Servo and Rod

 04-12-2011
0.50
Flap Motor Started

 04-10-2011
3.00
Fuel Line fabricated and installed

 04-08-2011
2.00
Fuel Vent lines fabricated and installed

 04-07-2011
1.00
Rivet Aft Rudder Cable Fairings Anchor
       

 04-06-2011
1.50
Intalled Brake Reservoir and Initial Elbow Fitting
     

 04-05-2011
1.00
Rudder Cables Installed

 04-04-2011
2.00
Connect Bellcrank Assembly to Control Rods/Sticks
       

 04-03-2011
2.00
Rivet Bottom Forward/Cooling Ramp
       

 03-24-2011
2.00
Cooling Ramp Installed/Forward Bottom Skin Riveted
       

 03-14-2011
2.00
Rivet Rudder Support Floor Angles/ Front Bottom Pa
       

 03-12-2011
1.00
Assemble Rudder/Brake Pedals
     

 03-10-2011
2.00
Paint Interior Grey/ Seats, and redo console
Details
       

 03-07-2011
2.00
Paint Interior Grey/ floors, consoles

 03-06-2011
3.00
Miscellaneous, Bracket Work, Deburring, Dimpling
Details
       

 03-05-2011
1.00
Prime Paint Control Tubes/ Rivet and Console
Details
     

 03-04-2011
2.00
Cut Fuel Gauge Holes/ Paint Booth Work
     

 02-26-2011
5.00
Elevator Control System Started
       

 02-24-2011
2.00
Fuel Gauge Cover Started/ Finish Seat Ramps
       

 02-21-2011
2.00
Finish Rear Baggage Anchor
     

 02-20-2011
2.00
Start Rear Baggage Anchor

 02-19-2011
2.00
Finish Seat Ramps and Aux. Longeron Platenuts

 02-16-2011
3.00
Finish Rear Seat Riveting and Seat Ramps
     

 02-15-2011
3.00
Rivet Seats Front and Back
     

 02-13-2011
2.00
Rivet Foot Wells
       

 02-12-2011
2.00
Back Rivet Floor Stiffeners and Hinges
       

 02-11-2011
3.00
Prime Painted Seates and Floor
       

 01-09-2011
2.00
Prime paint seat floors/rear baggage/misc parts
       

 01-08-2011
3.00
Deburred floor/rear baggage skin edges

 01-02-2011
1.50
Dimpled seat floors

 12-29-2010
3.00
Drillled out seat floor stiffeners/rear seat hinge
       

 12-21-2010
2.50
Right/Left Gear Weldment Scews
Details
     

 12-19-2010
1.00
Rivet Right Gear weldment to forward side skin
     

 12-18-2010
1.00
Riveting Left Gear Weldment to forward side skin
     

 11-13-2010
3.00
Flap bearings/foot wells
Details
       

 11-02-2010
3.00
Drill out seat floors/Aft baggage
       

 10-25-2010
1.00
Start seat floors/wells
       

 10-24-2010
2.00
Pulled Wing spar blocks and riveted AN470 rivets
     

 10-23-2010
5.00
Rivet bottom skin center/forward side skins
       

 10-14-2010
1.00
Prime paint gear box interior/rivet center forward
       

 10-09-2010
0.50
Drilled with unibit AN4 Gear access holes
Details
     

 10-04-2010
1.00
Continue belly 3/32 flush riveting

 10-01-2010
1.00
Belly Riveting, and forward mid-longerons (3/32)
       

 09-14-2010
1.00
Deburred Holes Front and Rear Seat Backs
Details
       

 09-13-2010
2.00
Deburred and Dimpled Forward Bottom Skins
       

 09-12-2010
2.00
Drilling Gear
Details
     

 09-12-2010
3.00
Drilled Out Main Landing Gear/Deburred Holes
Details
       

 09-11-2010
3.00
Set-Up for Main Landing Gear Drilling
Details
       

 09-10-2010
0.50
Started Bottom Forward Skins

 09-08-2010
1.00
Finished Drilling Out Front and Back Seat Backs

 09-07-2010
3.00
Started Front Seat Back/Rear Seat Back

 09-05-2010
3.00
Landing Gear Started (Drilling Blocks out)

 08-28-2010
4.00
Installed/Riveted Cockpit Rails/Seat Back Weldment
       

 08-26-2010
0.00
Reorganized work benches and desk
       

 08-25-2010
2.00
Rivet Forward and Mid-Skins
       

 08-15-2010
3.00
Rivet Forward and Mid-Skins
Details
       

 08-14-2010
4.00
Rivet Aft Deck/ Start Fuel Lines
Details
       

 08-08-2010
4.00
Rivet Aft Skin/Lower Longerons
Details
       

 08-07-2010
5.00
Rivet Aft Skin and Finish Mid-Skins
     

 08-06-2010
1.50
Rivet Rt. Mid-Skin/Longerons/and arm rests

 08-05-2010
1.50
Rivet Mid-Skin/Top Longerons
Details

 08-04-2010
1.00
Rivet F818 to F808, F806A/F Gussets/F805B R/L

 07-31-2010
1.00
Riveted aft belly skin to baggage substructure
       

 07-29-2010
2.00
Rivet right aft skin at bulkheads/longeron keepers

 07-28-2010
2.00
Rivet left aft skin at bulkheads/longeron keepers

 07-27-2010
4.00
Clecoed aft skins/belly skins/mid & lower longeron
       

 07-26-2010
2.00
Clecoed bulkheads/rivet midskin to longerons
       

 07-25-2010
1.50
Grey painted interior parts/battery tray/brackets

 07-24-2010
2.00
Prime painting misc. parts pump/filter brackets
Details

 07-23-2010
1.50
Battery tray drilling/deburring
       

 07-22-2010
1.00
Started Fuel pump/filter brackets

 07-19-2010
1.00
Cover plate aft side skins platenuts/battery tray

 07-17-2010
3.00
Riveted seat rib angles/baggage ribs/F807
       

 07-16-2010
1.00
Riveted upper right longeron

 07-15-2010
1.00
Riveted Left upper longerons
     

 07-14-2010
2.00
Riveted right midskin to arm rest supports
     

 07-13-2010
1.00
Clecoed left mid skin onto fuselage/upper longeron
     

 07-12-2010
2.00
Rivet mid skins to left arm rest substructure
       

 07-11-2010
3.00
Grey Interior Painting on fuselage/longeron parts
       

 07-08-2010
2.00
Prime painting longerons/fuselage substructure

 07-06-2010
2.00
Alumi-Prep/alodine longerons and remaining substru

 07-05-2010
2.00
Finished dimpling skins

 07-04-2010
5.00
Dimple and edge rolling skins

 07-03-2010
3.00
Finished seat rib assembly riveting

 07-02-2010
3.00
Rivet seat rib assembly to under skin

 06-30-2010
3.00
Rivet forward lower longerons/tail cone/attach cen

 06-29-2010
2.00
Finished substructure/bolted forward bottom longer
       

 06-28-2010
3.00
Clecoed and Riveted Aft tail section
Details
       

 06-27-2010
3.00
AKCO Prime painted Substructure and bulkheads
       

 06-24-2010
3.00
Alumi prep/Alodine structural and bulkheads
       

 06-22-2010
2.00
Dimpled aft side skins

 04-28-2010
30.50
Deburring structures and skins /Finished June 21st
Details

 04-27-2010
2.00
Countersinking continued

 04-25-2010
2.00
Countersinking and deburring continued

 04-21-2010
3.00
Countersinking longerons and structure started
     

 04-18-2010
2.50
Finished disassembly of skins/substructure

 04-04-2010
1.00
Drilled out (countersunk) skin under center sectio

 04-01-2010
3.00
Uncleco bulkheads, longerons
Details

 03-29-2010
3.00
Continued drilling out caps,upper aft skin, bulkhe
Details
       

 03-28-2010
2.00
Drilled seatback support
     

 03-27-2010
6.00
Drilled out Upper aft skin, tower webs, rail caps
Details
       

 03-26-2010
2.00
Drilled bottom skin to center section
Details

 03-25-2010
2.00
Riveted left bottom skins (inboard walk bays)

 03-24-2010
2.00
Drilled out right upper longerons
Details

 03-22-2010
2.00
Riveted right bottom wing skin
Details
     

 03-18-2010
2.00
Drilled out forward right side skin
     

 03-17-2010
2.00
Drilled out forward left skin

 03-16-2010
0.50
Drilled out left upper longerons
Details
     

 03-15-2010
2.00
Drilled out Upper Rt. Longerons
Details
       

 03-11-2010
1.00
Drilled out Right lower & auxillary longerons
     

 03-10-2010
3.00
Drilled out Left lower & auxillary longerons

 03-07-2010
2.00
Upper Longerons
Details
     

 03-06-2010
2.00
Started skin assembly of mid to tail skins.
     

 03-04-2010
3.00
Tail skin assembly
Details
     

 03-03-2010
2.00
Finish deburring and assembly
Details
       

 03-01-2010
1.00
Drilling out landing tail gear
Details
       

 02-28-2010
3.00
Tailcone and bulkheads started
Details
       

 02-27-2010
3.00
Mid-Fuselage arm rests
Details
       

 02-26-2010
4.00
Mid-Fuselage Riveting and Assembly
Details
       

 02-25-2010
2.00
Skin Riveting Seat Rib Sub-Assembly
Details
       

 02-20-2010
2.00
Continued Riveting Seat Rib Sub-Assembly
Details
       

 02-16-2010
2.00
Begin Riveting Seat Rib Sub-Assembly
     

 02-13-2010
2.00
Prime Painted Seat Rib Sub-Assembly
Details
       

 02-06-2010
3.00
Alumi-Prep/Alodine Seat Rib Sub-assembly
     

 01-19-2010
2.00
Mid-Fuselage F-823-1 Skins
Details
       

 01-14-2010
2.50
Mid-Fuselage Started
Details
     

 01-01-2010
6.00
Finished Right and Left Lower/Mid Longerons
       

 12-31-2009
2.50
Drilled Out Right & Left Lower Forward Longerons
       

 12-30-2009
1.00
Finished Bending Lower Longeron Bending
Details
       

 12-28-2009
1.50
Lower Longeron Bending
Details
       

 12-27-2009
2.50
Remove Blue Plastic/Solder Gun/Dimple Countersink

 12-26-2009
1.00
Finished Deburring Seat Rib Assembly
     

 12-17-2009
0.50
Continued Deburring Seat Rib Assembly

 12-14-2009
1.00
Deburr Seat Rib Assembly

 12-09-2009
0.50
Roll Skin Edges below seat assembly
 

 12-08-2009
2.00
Seat Rib Assembly/floor skin drilled

 11-29-2009
1.50
Seat Rib Assembly Started.
Details
       

 11-28-2009
4.00
Riveted Bottom Firewall/Center Section Work
Details
       

 11-25-2009
2.00
Center Seciton Continues
Details
       

 11-24-2009
2.00
Center Section Continues
Details
       

 11-23-2009
0.50
Center Section work
Details
       

 11-22-2009
1.00
Firewall Machine Dimpled/Proseal Applied
Details
       

 11-21-2009
1.50
Gear Tower Fore and Aft Braces Attached
       

 11-20-2009
2.00
Landing Gear Tower Riveted and Finished
       

 11-18-2009
1.50
Landing Gear Tower Weldments Riveted
       

 11-16-2009
2.00
Landing Gear Weldments Bolted
     

 11-12-2009
3.00
Finished Riveting Gear Tower Braces/Panels
     

 11-11-2009
2.00
Started Riveting Gear Tower braces

 11-08-2009
2.00
Finished Riveting Access Door Modification
       

 11-07-2009
4.00
Riveting Access Door Mod. platenuts

 11-03-2009
2.00
Painted Acryglow (Sherm/Williams) on Interior Part
Details

 11-01-2009
3.00
Prime Painted all current prepared parts

 10-31-2009
3.00
Alumi-Prep/Alodine
Details

 10-29-2009
0.20
Finished Paint Booth

 10-27-2009
0.30
Paint Booth Fabrication (number 4)

 10-25-2009
2.00
Center Section Preparation Finished
Details
       

 10-24-2009
4.00
Redo-F849 and continue Center Section work
Details
     

 10-20-2009
1.50
Center Section work continues
Details
     

 10-19-2009
0.25
Center Section Work Begins
Details
     

 10-17-2009
2.00
Forward Fuselage Subfloor
Details
       

 10-16-2009
2.00
Finished Instrument Panel Access Door
Details
     

 10-14-2009
0.25
Compressor Hose
Details
     

 10-12-2009
2.00
Continue Instrument Panel Access Door Mod.
Details
       

 10-11-2009
2.00
Continue Instrument Panel Access Door Mod.
Details
     

 10-10-2009
2.00
Instrument Panel Access Door Mod.
Details
     

 10-04-2009
2.00
Finished deburring Landing Gear Boxes
     

 10-01-2009
1.00
Deburring Landing Gear Boxes continues

 09-30-2009
1.00
Deburring edges and drilled holes
Details

 09-29-2009
2.00
Drilled out Landing Gear Towers
Details
       

 09-24-2009
2.00
Prime subfloor and rivet and Finished Firewall riv
       

 09-15-2009
1.50
Continue Riveting Firewall, and Riveted Cool Air
       

 09-14-2009
1.00
Prime Paint Firewall parts, and Cool Air Ramp angl
       

 09-04-2009
1.50
Dimple subfloor/Alodine parts
     

 09-01-2009
3.00
Final Drilled Fuselage Forward Subfloor & Cooling
       

 08-31-2009
2.00
Finished Firewall Angle work/ Began Forward Floor
Details
     

 08-29-2009
1.00
Firewall Angle Parts Drill Countersunk
       

 08-27-2009
3.00
Dimple Firewall, and Finished deburring
       

 08-25-2009
2.00
Final Drilled Firewall
     

 08-24-2009
3.00
Firewall Started
Details
     

 08-20-2009
4.00
Fuselage Unpacked, and Inventory
Details
       

 08-19-2009
0.25
Fuselage Kit Arrives
Details
       

 08-15-2009
0.50
Transferred Wings to Wing Craddle for Storage
Details
       

 08-12-2009
4.00
Wing Craddle Constructed
Details
       

 08-12-2009
1.00
Began Designing my instrument panel.
Details
       

 08-08-2009
2.00
Mount Left Fuel Tank on Wing
Details
       

 08-04-2009
2.00
Left Fuel Tank Finished and Tested
Details
       

 07-31-2009
3.00
Proseal/Rivet Left Fuel Tank Baffle

 07-26-2009
3.00
Proseal Touchup, and Tape-Off for Baffle work
       

 07-25-2009
6.00
Proseal/Rivet Left Fuel Tank Ribs # 1,7
Details
       

 07-22-2009
2.50
Proseal/Rivet Left Fuel Tank Ribs # 5,6

 07-21-2009
4.00
Proseal/Rivet Left Fuel Tank Ribs # 2,3,4
     

 07-02-2009
0.50
Proseal/Rivet Left T-410 to Outboard Fuel Tank Rib
Details
       

 05-07-2009
2.00
Fabricated Flap Hinge Pin Tie-Downs
Details
     

 05-06-2009
0.50
Mounted Ailerons and Fabricated Spacers
Details
       

 05-05-2009
0.25
Checked Aileron Trailing Edge Radius
       

 05-04-2009
2.00
Mount Flaps for Hinge Drilling and Placement
       

 05-03-2009
1.00
Rivet Flap Braces to Rear Wing Spars
       

 04-25-2009
2.00
Rivet Aileron Brackets and Gap Seals
       

 04-23-2009
2.00
Fabricate Flap Hinges and Countersink
     

 04-20-2009
0.50
Prime Paint Flap Braces
Details
       

 04-14-2009
1.50
Alumi-Prep/Alodine Aileron Brackets and Gap Seals
       

 04-13-2009
1.50
Aileron Brackets
Details
     

 04-12-2009
2.00
Aileron Gap Seal and Flap Bracket Drilled Out
Details
       

 04-09-2009
1.00
Aileron Brackets/Hinges
     

 02-22-2009
1.50
Wing Position Light Lens Covers
Details
       

 02-09-2009
0.50
Contour/File Left Bottom Wing Skin Lap Joint

 02-06-2009
0.50
Contour/File Right Bottom Wing Skin Lap Joint

 01-28-2009
2.00
Right Fuel Tank Leak Testing/Manometer Method
Details
       

 01-27-2009
1.00
Bellcrank/Linkage
Details
     

 01-24-2009
2.00
Landing Lights Wired/Run Wire thru Conduit
Details
       

 01-16-2009
2.00
Finished Riveting Left Aileron
Details
       

 01-14-2009
1.50
Re-do Right Aileron Bottom Skin Rivets
Details

 01-13-2009
2.50
Finished Riveting Right Aileron/Checked tailing ed
     

 01-08-2009
1.00
Prime Paint Main Aileron Control Pushrods
     

 01-05-2009
1.50
Mounted Right Fuel Tank on Wing
Details
       

 01-04-2009
3.00
Left Fuel Tank Construction Begins
Details

 01-03-2009
1.00
Alumi-Prep/Alodine Control Pushrods
     

 01-02-2009
1.00
Right Fuel Tank Leak Test
Details

 12-27-2008
1.00
Finished Aileron Control Pushrods
       

 12-23-2008
1.00
Continued Aileron Control Pushrods

 12-07-2008
3.00
Installed Left Fuel Tank Sender
Details
       

 12-01-2008
3.00
Riveting on Right Flap
       

 11-17-2008
2.00
Aileron pipe counter wt work and Float senders
Details

 11-14-2008
1.00
Rt. Fuel Tank Vent Line Fitted
       

 11-12-2008
1.00
Install Bellcranks/Ream bushing
       

 11-10-2008
2.00
Prime Aileron Infrastructure

 11-05-2008
1.00
Alumi-prep/Alodine Aileron Infrastructure
     

 11-01-2008
1.00
Installed Wing Electrical Conduit
       

 10-30-2008
2.00
Rivet Flap Plates and Flap Platenuts
       

 10-29-2008
2.00
Installed Platenuts Left Bottom Wing
Details

 10-28-2008
2.00
Rivet Left Bottom Skin to Aft Ribs Flaps
     

 10-27-2008
2.00
Flap Work/Angle Piece Drilled and Deburred

 10-26-2008
1.00
Rivet Main Spar/Flange Repairs
Details
       

 10-25-2008
4.00
Aileron Work
Details
       

 10-19-2008
3.00
Deburr/Dimple Left Wing Skin

 10-18-2008
3.00
Finish Drilling Out Ailerons/counter wt. pipe

 10-17-2008
2.00
Assemble/Drill Out Ailerons and Pipe
Details
     

 10-16-2008
2.00
Fabricate and proseal/rivet plates on outboard Rt.
Details
       

 10-15-2008
3.00
Aileron Brake Work
Details

 10-14-2008
2.00
Deburr/Dimple Rt. Bottom Wing Skins

 10-13-2008
2.00
Rivet Stiffeners on Ailerons
       

 10-11-2008
2.00
Prime Paint Flap/Aileron Parts

 10-10-2008
2.00
Alumi-Prep/Alodine parts
Details

 10-05-2008
6.00
Flaps/Aileron work
Details
       

 10-04-2008
3.00
Proseal/Rivet 3 Ribs in Rt. Fuel Tank

 09-30-2008
2.00
Drilled out F706A part to Inboard Ribs

 09-29-2008
1.00
Finished Fabrication of F706A Rt/Left Parts

 09-28-2008
2.00
Counter Sink Flap Spars/Fabricate FL706A angles

 09-26-2008
1.00
Dimple Left Flap Skins
     

 09-25-2008
1.00
Dimple Rt Flap Ribs/Left Flap Ribs
Details
       

 09-24-2008
1.00
Dimple Rt. Flap Skin/Ribs
     

 09-22-2008
1.00
Dimple Aileron Skins/spars
       

 09-21-2008
1.00
Dimple Aileron Stiffeners
       

 09-20-2008
2.00
Deburred Edges/Finish work Aileron Stiffeners/Dril
     

 09-20-2008
1.00
Deburred Aileron Skins
Details
       

 09-18-2008
1.00
Cutting Aileron Stiffeners

 09-16-2008
0.50
Re-Do Landing Light Attachment Screw Holes
Details

 09-15-2008
4.00
Right Fuel Tank/First Two Ribs Prosealed and Rivet
       

 09-14-2008
2.00
Drilled Out Left Flap/Deburred/Fuel Tank Work
Details

 09-13-2008
2.00
Drilled out Right Flap and Deburred
     

 09-11-2008
1.00
Drill Out Flap Skins and Hinges
       

 09-09-2008
2.00
Fabricate Shims for Flap Ribs to Tailing Edge Skin
     

 09-08-2008
1.00
Flaps/Ribs/Spar Clecoed and Drilled Out
     

 09-07-2008
1.00
Right Fuel Drain Riveting/Proseal
       

 09-06-2008
2.00
Proseal/Rivet Rt. Fuel Tank Filler Hole
       

 09-04-2008
2.00
Rivet Tank Stiffeners/Proseal work
     

 08-31-2008
2.00
Finished Right Top Wing Skin Riveting
       

 08-30-2008
2.50
Finished Top Left Wing Skin Riveting/Started Right
       

 08-24-2008
3.00
Scuff Internal Tank Skin/Rivet Top Skin to Spar
Details

 08-22-2008
1.00
Pop Rivet Leading Edge Ribs to Main Spar

 08-19-2008
2.50
Dimple Left Tank Skin/Tape off Tank Stiffeners
Details
       

 08-17-2008
4.00
Dimple Tank Stiffeners/Ribs/Skin and deburr
       

 08-16-2008
2.00
Deburr Tank Stiffeners and Ribs

 08-14-2008
3.00
Dimple and Deburr Rt. Wing Top Skins

 08-12-2008
4.00
Dimple Top Left Wiing Skins
       

 08-11-2008
2.00
Wing skin dimpling/attached skin to ribs/spars
       

 08-11-2008
1.50
Riveted leading edge to main spar
Details
       

 08-10-2008
10.00
Finish Landing lights/skin work/leading edge
Details
       

 08-09-2008
4.50
Finish rivets leading edges/skin work
Details
     

 08-08-2008
1.50
Main spar holes primed
Details
     

 08-08-2008
2.00
Continue work on landing lights
     

 08-07-2008
1.00
Further work on landing lights
Details
     

 08-04-2008
2.00
Left landing light cut hole and finished surface

 08-03-2008
2.00
Started Duckworks landing light right wing
Details
       

 08-02-2008
2.00
Rivet leading edges
Details

 07-30-2008
2.00
deburr and dimple left ribs
Details

 07-25-2008
6.00
Leading edge work, and rear spar work
Details
       

 07-24-2008
4.00
deburr and dimple leading edges and ribs
Details

 07-20-2008
4.00
Alumiprep and alodine joint plates/Z-Brackets atta
Details
       

 07-19-2008
1.00
Finished removing protective plastic from skins
Details
     

 07-17-2008
3.00
Removing protective plastic from skins with solder
     

 07-15-2008
2.00
Dimple/countersink/deburr joint plates
     

 07-13-2008
6.00
Fuel Tank Flap/Trap doors and Access Plate
Details
       

 07-13-2008
1.00
Finished up Fuel tank access plates on inboard rib
       

 07-12-2008
4.00
Worked on Nutplates on Joint Plates, deburred.
Details
       

 07-08-2008
1.00
Drilled T-708/T-411 Rings/Plates for Tank Access P
Details
       

 07-04-2008
2.00
Fabricate C-Frame Table.
Details
       

 06-28-2008
3.00
Finish Left and Right Fuel Tank Attacment Angles..
Details
       

 06-27-2008
2.00
Disassemble and Label Left and Right Tank parts
Details
     

 06-24-2008
2.00
Countersink Right Fuel Tank skin to baffle attachm
Details

 06-23-2008
3.50
Countersink Left Fuel Tank Skin to Baffle attachme
Details
       

 06-19-2008
1.50
Final drill Left Fuel Tank
       

 06-16-2008
3.00
Z-Brackets for Right fuel tank started
Details
       

 06-15-2008
1.50
Left fuel tank/Right Z-brackets
Details
       

 06-15-2008
6.00
Left fuel tank baffle/ribs/joint plate final drill
Details
       

 06-13-2008
1.50
Finished left Z-Bracket drilling/left fuel baffle

 06-06-2008
2.50
Fabricate fuel tank stiffeners/final drill to tank
       

 06-05-2008
2.00
Measured and drilled Z-Brackets for fuel tanks
       

 06-02-2008
5.00
Right wing skins/leading edge/joint plate
Details

 05-29-2008
3.00
Left wing edge joint plate, started drilling out r
Details
       

 05-26-2008
1.50
Finsih dirll out left leading edge/fabricate right
       

 05-25-2008
4.00
Drill out left top and bottom skins/and leading ed
Details
       

 05-23-2008
1.50
Riveted Right ribs to main spar and rear spar
       

 05-19-2008
1.00
Clecoed Right ribs to main spar and rear spar

 05-18-2008
1.00
6 Right ribs painted with primer
Details
     

 05-17-2008
2.00
8 Right ribs painted with primer

 05-16-2008
3.00
Right fuel tank ribs/Z-Brackets/tank skin
     

 05-16-2008
3.00
Right Fuel Tank
Details
       

 05-16-2008
3.00
Drilled right fuel tank ribs/Z-Brackets/baffle/joi

 05-16-2008
2.50
Built leading edge and fuel tank craddles
Details

 05-16-2008
3.00


 05-13-2008
3.00
Leading edge ribs squared and fluted

 05-12-2008
1.50
Fabricated wing doubler/clecoed inboard top skin
Details
     

 05-10-2008
2.00
Mount Left Wing to Wing stand/plumb/level
Details
       

 05-10-2008
2.00
Clecoed skin on bottom of left wing and outboard t
       

 05-10-2008
5.00
Alumi-Prep/alodine right ribs

 05-02-2008
3.00
Riveting Left main spar/ribs/and rear spar
Details
       

 04-30-2008
1.00
Riveting Ribs to left main spar
       

 04-30-2008
0.00
Riveting Ribs to left main spar
       

 04-21-2008
4.00
Alodine treating of ribs/primer painting
       

 04-19-2008
5.00
Alumi-Prep/Alodine Left ribs
       

 04-16-2008
3.00
Drilled out ribs/with spars
Details
       

 04-14-2008
1.00
Finished bending flanges on ribs/squaring/flutiing
Details
       

 04-14-2008
1.00
Bending rib flanges/squaring/fluting finished
Details
       

 04-13-2008
2.50
Bending flanges/squaring/and fluting of ribs
       

 04-11-2008
0.00
Eye bolt fitting completed
       

 04-11-2008
2.50
Deburr ribs/tap both tie down brackets
Details
       

 03-26-2008
3.00
Drilling out spars/ribs
Details
       

 03-25-2008
0.00
Shop benches
       

 03-25-2008
0.50
Assemble ribs/main & rear spar for drilling
       

 03-24-2008
2.00
Drill pilot holes then unibit holes for conduit
       

 03-24-2008
0.50
Build jig for drilling conduit hole
       

 03-22-2008
2.00
Deburr rib edges/lightening holes

 03-18-2008
1.00
Deburr rib edges/lightening holes
       

 03-17-2008
2.50
Rivet rear spar reinforcement fork and plates
       

 03-16-2008
2.50
Rivet nut plates on and bolt tie downs to rear spa
     

 03-16-2008
2.00
Cleco rear spar/tape rivet call out
       

 03-15-2008
1.00
Prime paint alodined parts/rear spar
     

 03-15-2008
2.75
Make shift Paint booth for priming
Details
       

 03-13-2008
1.50
Tie down/rear spar components
Details
       

 03-13-2008
1.00
Aluminum-Prep/Alodine Rear spar/reinforcement plat
       

 03-02-2008
6.00
Rear wing spar preparation
Details
       

 02-24-2008
1.00
Finished wing tie down brackets
Details
       

 02-22-2008
3.00
Wing tie downs
Details
       

 02-20-2008
3.00
Access Plates
Details
       

 02-11-2008
15.00
Countersinking main wing spars
       

 02-06-2008
0.25
Wing Kit Arrives
Details
       

 10-22-2007
0.25
Ruddder attacked to Vertical Stabilizer
Details
       

 10-21-2007
0.25
attaching elevators/balance check
Details
     

 10-07-2007
1.00
Painting elevator trim
Details
       

 09-24-2007
2.00
Painting elevators
Details
       

 09-05-2007
2.00
Final paint vertical stabilizer
Details
     

 08-28-2007
1.50
Painting rudder
Details
     

 08-15-2007
1.00
Painting tips of Horizontal stabilizer
     

 07-08-2007
3.00
Painting the vertical stabilizer
Details
       

 06-03-2007
0.45
Test painting with primer...Acryo-Glo...FFA Blue
Details
       

 06-02-2007
16.00
Paint booth fabrication/design
Details
       

 10-15-2006
20.00
Empennage fiberglass tips
Details
       

 08-07-2006
3.00
Elevator misc. work
Details
       

 08-05-2006
0.25
Fabricated a drill bushing
Details
       

 08-03-2006
3.50
Roll leading edges of both elevators & rivet
Details
     

 08-02-2006
0.75
Fabricate Rod end bearing tool.
Details
       

 06-01-2006
3.00
Elevator trim tab repair work
Details

 05-31-2006
2.00
Elevator trim tab work finished

 05-30-2006
1.00
Elevator trim tab hinge work

 05-28-2006
4.25
Elevator trim tab work

 05-25-2006
3.50
Building the elevator trim tab

 05-24-2006
1.50
Left elevator riveting /elevator hinge completed

 05-23-2006
6.00
Left elevator/servo work
Details
     

 05-22-2006
5.00
Preparation and bending Left elevator tabs

 05-21-2006
3.00
Left elevator riveting
Details
       

 05-15-2006
2.00
Elevator trim nutplates installed/servo unpacked

 05-14-2006
2.00
Primer paint left elevator parts

 05-13-2006
2.00
Left elevator dimpe work

 05-09-2006
2.50
Left elevator edge finishing/deburring

 05-07-2006
2.00
Left elevator understructure/skin work
Details
     

 05-06-2006
2.50
Finsih up right elevator

 05-06-2006
3.00
Elevator Rt. and Left parts primer painted

 05-05-2006
1.50
Preparation of elevator parts for primer paint

 05-03-2006
0.25
Bolt, torque, torque seal HS-411PP to spar

 05-01-2006
4.00
Left stiffeners/elevator, misc. work
Details

 04-30-2006
3.00
Left elevator spar/reininforcement plates
Details

 04-30-2006
3.00
Left elevator skin edge finishing

 04-29-2006
4.00
Rt. elevator riveting
     

 04-29-2006
1.50
Rt elevator parts primer painted

 04-28-2006
1.50
Rt edge deburring metal prep/alodine

 04-26-2006
2.00
Rt elevator countersinking/dimpling
Details

 04-25-2006
1.00
Drilled Rt elevator skin to understructure

 04-24-2006
4.00
Rt elevator/horn work

 04-23-2006
4.50
Rt elevator stiffener/parts work

 04-22-2006
3.50
Rt elevator spar/rib work

 04-20-2006
2.50
Rt elevator rib/counter balance work

 04-19-2006
1.50
Elevator skin/stiffener work
Details
     

 04-18-2006
4.00
Elevator stiffener work continued
Details

 04-16-2006
2.50
Elevator stiffener work continued

 04-15-2006
4.00
Horizontal stabilizer riveting completed/finished
       

 04-13-2006
4.50
Trimming elevator stiffeners

 04-10-2006
3.00
Right horizontal stabilizer riveting continued

 04-07-2006
3.00
Left Horizontal stabilizer riveting continued

 04-06-2006
0.75
Horizontal Stabilizer skin/spar further riveting

 04-05-2006
1.50
Continued Horizontal Stabilizer riveting

 04-04-2006
0.00
Shop layout
Details
       

 04-03-2006
8.00
Vertical Stabilizer riveting completed
     

 04-02-2006
2.50
Vertical Stabilizer riveting continued

 04-01-2006
5.00
Vertical Stabilizer cleco/riveting

 03-31-2006
0.50
Rudder leading edge rolling/riveting
Details
       

 03-30-2006
6.00
Rudder riveting completed

 03-29-2006
3.50
Rudder riveting
       

 03-19-2006
1.50
Rudder skeleton edge finishing
Details

 03-18-2006
3.00
Rudder skeleton deburr, edge finishing
Details

 03-15-2006
0.25
Drill R-713 holes to R-801PP final size
Details
     

 03-14-2006
1.00
Rudder attach strips/counterbalance skin to unders

 03-10-2006
5.00
Rivet Horizontal stabilizer
Details
       

 03-09-2006
3.00
Dimple Rudder skin, rivet stiffeners to rudder
     

 03-08-2006
1.00
Fabricate a bending "Brake"
Details
     

 03-07-2006
5.00
Primer paint sprayed
Details
     

 03-05-2006
4.00
Horizontal stabilizer parts prepared for primer pa
Details

 02-19-2006
6.00
Rudder skeleton
Details

 02-18-2006
1.00
Fabricate R-717 spacer/both R-716 bottom rudder st

 02-16-2006
0.50
Rudder reinforcement plates to R-802PP spar

 02-15-2006
3.00
Building the rudder
Details

 02-12-2006
4.00
Building the Rudder
Details

 02-06-2006
3.00
Vertical stabilizer parts prepared for primer pain
Details
       

 02-02-2006
1.00
Drilled,deburred,dimpled Horizontal stab. skin
Details
       

 01-26-2006
3.00
Redo VS706 part
Details

 01-16-2006
1.50
Finish horizontal stabilizer deburring of skin/ske

 01-15-2006
2.00
Horizontal stabilizer deburring skin/skeleton

 01-13-2006
2.00
Match drill VS-801PP/VS-901 skin

 01-09-2006
3.00
Drilling, deburred, dimpled Vertical Stabilizer
Details
     

 01-07-2006
0.50
Drilling Vertical Stabilizer

 12-30-2005
2.00
Finish HS-702 spar to HS-801 drilling

 12-29-2005
2.00
Finish skin HS-801 drilling

 12-28-2005
5.00
Left horizontal stabilizer
Details

 12-26-2005
3.00
Rib preparation..edges/fluting...Drill rt. horizon
Details

 12-19-2005
0.50
Front Spar assembly...dimple HS-702, countersink H

 12-13-2005
0.50
Front spar assembly...bending HS-810/814

 12-08-2005
1.55
Rear & Front spar assembly

 12-07-2005
0.00
Pneumatic tools....oh yah!!!
       

 12-07-2005
2.00
Horizontal Stabilizer, rear spar assembly










Copyright © 2001-2024 Matronics. All Rights Reserved.