KitLog pro

Powered By Kitlog Pro v2.0

Schroeders Sportsman
Work Logs Found: 1255
Category Work Time: 2320 Hours
 Date
Hours
Work Log Summary

Details

 09-10-2019
1.00
Placards
Details
       

 09-08-2019
1.00
Refurb'd master brake
Details
       

 09-07-2019
2.00
Birthday work
Details
       

 09-06-2019
0.00
Tool Sale
Details
     

 09-02-2019
3.00
Prepped the servos
Details
       

 08-25-2019
2.00
Priming for delta wings
Details
       

 08-24-2019
4.00
Tech Consular visit
Details
       

 08-20-2019
1.00
Primer Prep
Details
       

 08-18-2019
3.00
Brake Leak
Details
       

 08-17-2019
4.00
Securing Tail Wiring
Details
       

 08-11-2019
4.00
Overhead cable cover
Details
       

 08-09-2019
0.00
Tool Sort
Details
     

 08-08-2019
2.00
second tail cone
Details
       

 08-04-2019
4.00
Fitting wing tips
Details
       

 08-03-2019
4.00
Stick Grips Complete
Details
       

 07-24-2019
1.20
Tail Cone #2
Details
       

 07-21-2019
3.00
Laying out Stick Grips
Details
       

 07-20-2019
3.00
Barking Brake final install
Details
       

 07-14-2019
3.00
Door cotter pining
Details
       

 07-13-2019
3.00
Right aileron
Details
       

 07-10-2019
1.00
Reinforced Elevator Fairing
Details
       

 07-08-2019
2.00
Right Door
Details
       

 07-07-2019
3.00
Aileron counterweights
Details
       

 07-06-2019
3.00
Right Aileron
Details
     

 07-05-2019
4.00
Left flap cove skin
Details
       

 07-04-2019
4.00
Cove skins #2
Details
       

 07-03-2019
1.00
Right flap cove skin
Details
     

 07-02-2019
1.00
Left flap cove skins
Details
     

 06-30-2019
3.00
Elevator Counterweights
Details
     

 06-29-2019
3.00
Cove skin inspection panels
Details
       

 06-28-2019
1.00
Left avionics subpanel
Details
       

 06-27-2019
3.00
Left airleron cove skin
Details
       

 06-26-2019
4.00
Finishing Cove skins
Details
       

 06-24-2019
1.30
Priming wing fold hatch covers
Details
       

 06-23-2019
4.00
Aileron cove skins #1
Details
       

 06-22-2019
3.00
Aileron Cove Skins
Details
     

 06-21-2019
3.00
Riveting the radio stack
Details
       

 06-19-2019
1.00
Registration to the FAA
Details
       

 06-18-2019
1.00
Panel Carbon wrap
Details
     

 06-16-2019
3.00
Bending cove skins
Details
       

 06-15-2019
3.00
Cove Skin doublers
Details
       

 06-12-2019
1.00
Cove skin fitting
Details
       

 06-09-2019
3.00
Control sticks
Details
       

 06-08-2019
2.00
Flap final check
Details
       

 05-19-2019
2.30
Flap cabling
Details
       

 05-18-2019
3.00
Glareshield
Details
       

 05-08-2019
1.00
507 Autopilot
Details
     

 05-06-2019
1.20
G5 Connector
Details
     

 05-05-2019
4.00
Reasemble bellcrank
Details
       

 05-04-2019
3.60
Rebuilding the bellcrank
Details
       

 04-28-2019
4.00
Shaping Counter Weights
Details
     

 04-27-2019
3.00
Shaping the elevator coutner weight
Details
       

 04-23-2019
1.50
Installing Subpanel componets
Details
       

 04-22-2019
2.00
New flap bellcrank
Details
       

 04-21-2019
2.00
Trimming my carbon
Details
     

 04-20-2019
4.00
Panel Back in the bird
Details
       

 04-19-2019
6.00
Drilled elevator counter weights
Details
       

 04-15-2019
2.00
Drilling lead
Details
       

 04-14-2019
2.50
Pouring lead
Details
       

 04-13-2019
2.00
Lead molds
Details
     

 04-11-2019
2.00
Rework flap cable
Details
       

 04-09-2019
1.30
Carbon
Details
       

 03-31-2019
1.90
Garmin 507
Details
       

 03-30-2019
1.70
G5 hole
Details
       

 03-29-2019
1.20
Painting the panel parts
Details
       

 03-28-2019
1.00
Garmin servos
Details
       

 03-26-2019
2.10
Panel work
Details
       

 03-25-2019
1.30
Patch Autopilot hole
Details
       

 03-17-2019
0.80
Seat back reassembled
Details
       

 03-16-2019
2.50
Control Stick install
Details
       

 03-15-2019
2.00
First seat install
Details
       

 03-14-2019
1.50
Switch Panel
Details
       

 03-13-2019
1.00
G5
Details
     

 03-12-2019
1.00
Switch Panel
Details
     

 03-10-2019
2.00
Wing hatch sanding
Details
       

 03-08-2019
1.30
Priming panel
Details
       

 03-03-2019
2.00
Sub Panels
Details
       

 03-02-2019
1.50
Tail fairing antichafe
Details
       

 02-28-2019
1.50
Interconnets
Details
       

 02-26-2019
0.50
Tail Fairing
Details
       

 02-24-2019
1.00
Backshell #3
Details
     

 02-23-2019
3.00
Flap Cable fix
Details
       

 02-17-2019
2.00
Finished the CAN bus
Details
       

 02-16-2019
2.00
Flap Issue
Details
       

 02-14-2019
1.20
GPS connects
Details
       

 02-06-2019
1.00
Backshell
Details
     

 02-03-2019
1.20
Control Stick Jig
Details

 02-02-2019
1.00
More wires appearing
Details
       

 01-31-2019
1.00
Right wing fold hatch
Details
       

 01-27-2019
3.00
Tensioning Cables
Details
       

 01-26-2019
3.50
Ailerons Rigged
Details
       

 01-23-2019
1.00
GPS power
Details
     

 01-22-2019
1.00
Adding Glass
Details
     

 01-20-2019
2.30
Avioinics Power and Ground
Details
       

 01-19-2019
1.00
Bulkhead A leather 3
Details
       

 01-14-2019
1.00
Bulkhead A leather 2
Details
     

 01-13-2019
1.00
Bulkhead A leather 1
Details
     

 01-12-2019
1.00
Bulkhead A leather
Details
     

 01-10-2019
0.00
Nicole's last visit
Details
       

 01-06-2019
2.60
Rear overhead cable cover
Details
       

 01-05-2019
2.30
Wire party
Details
     

 12-28-2018
0.90
Fitting Bulkhead A
Details
     

 12-26-2018
0.00
For Sale
Details
       

 12-23-2018
1.90
Bulkhead A Closeout
Details
       

 12-22-2018
3.80
Fairing time
Details
       

 12-13-2018
1.00
Cann Bus
Details
     

 12-11-2018
1.00
Right Wing Fols hatch
Details
       

 12-09-2018
2.00
CAN Buss
Details

 12-08-2018
1.00
Garmin CAN Bus
Details
       

 12-02-2018
1.20
Working the right wing fold hatch ocover
Details
       

 11-25-2018
1.30
Foam for the Right Hatch cover
Details
     

 11-22-2018
1.00
Shellgrounds
Details
     

 11-20-2018
1.00
Making my first interconnects
Details
     

 11-11-2018
2.30
Left Wing fold hatch rework
Details
       

 11-10-2018
3.00
Wing fold hatch glass
Details
       

 11-09-2018
2.00
Wing Fold Covers
Details
       

 11-02-2018
0.00
Tennessee Weekend
Details

 10-29-2018
0.40
Painted the headset jack cover
Details
     

 10-28-2018
3.50
Fold hatch covers
Details
       

 10-27-2018
3.50
Glassing Hatch fold covers
Details
       

 10-24-2018
1.00
Main cabin headset jack cutout
Details
     

 10-21-2018
3.00
Main cabin headset cover
Details
       

 10-20-2018
3.00
resecuring the ailerons
Details
       

 10-13-2018
3.00
hi temp cowling paint
Details
       

 10-12-2018
2.00
Bonding the servo tab
Details
       

 10-07-2018
3.00
Initial folding hatch work
Details
       

 10-06-2018
3.00
Last Cowling Fastners
Details
       

 10-01-2018
0.50
Headset jack plate
Details
     

 09-29-2018
2.00
Elevator Fairings 1
Details
       

 09-25-2018
1.20
Belly Ports
Details
       

 09-23-2018
3.30
Elevator Fairings
Details
       

 09-22-2018
3.20
EMag MP routing
Details
       

 09-15-2018
25.00
Filling the cowling
Details
       

 09-11-2018
1.00
ADHARS Harness
Details
     

 09-08-2018
1.00
Baffeling
Details
     

 09-02-2018
3.00
ADS-B Ground Plane
Details
       

 09-01-2018
1.50
Upper Cowling
Details
       

 08-28-2018
1.00
Primer day
Details
       

 08-23-2018
1.00
Comm1
Details
     

 08-19-2018
3.00
Left main door window
Details
       

 08-18-2018
1.40
Windo prep
Details
     

 08-17-2018
1.70
GPS wiring
Details
       

 08-12-2018
0.50
Headphone jack labels
Details
     

 07-31-2018
1.00
Panel Nutplates
Details
       

 07-28-2018
2.10
P Mag harness
Details
       

 07-27-2018
1.30
Panel main insert
Details
       

 07-21-2018
3.00
Fairings day
Details
       

 07-15-2018
2.70
Mag P Lead
Details
       

 07-08-2018
3.00
Window Prep
Details
       

 07-07-2018
3.80
First Window
Details
       

 06-30-2018
0.20
Fixed the Air Compressor
Details
       

 06-24-2018
2.00
Sub Panel
Details
     

 06-23-2018
4.00
Drilled the wing fold hatches
Details
       

 06-20-2018
1.00
Avionics- Norm
Details

 06-18-2018
1.30
Panel Accesories
Details
       

 06-09-2018
3.00
Sanding
Details
     

 06-08-2018
1.00
Hangar Fan
Details
     

 06-05-2018
2.00
Filler s my life2
Details
       

 05-30-2018
0.00
Norm
Details

 05-26-2018
2.30
Instlled the tail cone
Details
       

 05-19-2018
4.00
Sanding and filling
Details

 05-12-2018
1.50
finishing the tail cone
Details
       

 05-11-2018
2.00
Panel Sanding
Details
       

 05-05-2018
3.60
Fiberglass day
Details
       

 04-28-2018
0.30
wire diagram and flying
Details
       

 04-21-2018
2.60
Mounting the AIRINC 429 box
Details
       

 04-19-2018
0.50
Expiremental
Details
     

 04-14-2018
3.10
Fitting fuel lines at wing root
Details
       

 04-07-2018
2.30
Sanding the tail
Details
       

 03-18-2018
2.60
Delta Wings
Details
       

 03-17-2018
3.20
Electric trim cover
Details
       

 03-16-2018
2.00
Horizontal fairings
Details
     

 03-03-2018
2.80
Terminal stripe wiring
Details
       

 02-24-2018
2.00
Tail fairing
Details
     

 02-18-2018
2.00
Paint Prep
Details

 02-06-2018
0.00
Front seats
Details
     

 01-21-2018
2.00
Last Plastic
Details
       

 12-18-2017
2.00
Left Horizontal fairiing
Details
       

 12-10-2017
2.00
Right Horizontal tip fairing
Details
       

 12-09-2017
4.00
EMag
Details
       

 12-08-2017
1.20
Glareshield
Details
       

 12-06-2017
1.90
Solder Headset jacks
Details
       

 11-28-2017
1.00
Manifold pressure
Details

 11-26-2017
5.00
Test
Details
     

 11-24-2017
4.00
Turtle deck covers
Details
       

 11-22-2017
1.00
Seats
Details
     

 11-15-2017
1.00
Headset jacks
Details
     

 11-05-2017
3.00
Upper Cowling
Details
       

 11-04-2017
2.30
Glass Day
Details
       

 11-03-2017
1.80
Bulkhead A nutplates
Details
       

 10-20-2017
2.10
EGT/ CHT sensor connection
Details
       

 07-29-2017
3.10
Scuring scatt tube
Details
       

 07-22-2017
0.00
Oshkosh 2017!!
Details
       

 07-15-2017
2.10
Relays
Details
       

 07-09-2017
2.00
Fuel system
Details
       

 07-01-2017
1.20
Pulling wires wirh Dad
Details
       

 06-26-2017
1.00
Torque seal
Details
       

 06-24-2017
3.30
First wing swing
Details
       

 06-22-2017
1.40
strut bolts
Details
       

 06-18-2017
2.00
Left aux tank
Details
       

 06-17-2017
1.90
Securing wings
Details
       

 06-11-2017
2.00
Mounting the wings
Details
     

 06-09-2017
2.10
Left wing fuel
Details
       

 06-09-2017
1.80
Fuel filler neck
Details
     

 06-04-2017
2.30
Left wing fuel neck
Details
       

 06-03-2017
5.00
Firewall forward
Details
       

 05-26-2017
2.00
Moving Electrons
Details
       

 05-21-2017
0.70
Rear shear web
Details
       

 05-20-2017
3.00
Left Cove skin
Details
       

 05-14-2017
2.00
Rivet RIght wing
Details
     

 05-13-2017
2.20
ADS-B in
Details
       

 04-23-2017
2.80
First Battery Charge
Details
       

 04-22-2017
2.00
left wing rivet
Details
       

 04-15-2017
1.90
Right Wing riveting 2
Details
     

 04-09-2017
3.00
Fuse panel
Details
       

 04-08-2017
2.30
left wing work
Details
       

 04-07-2017
1.50
Right wing riveting
Details
     

 03-25-2017
3.20
Rudder Fairing
Details
       

 03-19-2017
3.00
Nikki On the Plane
Details
       

 03-15-2017
1.10
Power Diagram
Details

 02-19-2017
2.10
Right wing root
Details
       

 02-18-2017
1.90
Right Wing Spar 1
Details
     

 02-17-2017
1.00
Right Forward Spar
Details
     

 01-30-2017
1.10
Right Main tank
Details
       

 01-28-2017
1.70
Close up Right wing
Details
     

 01-22-2017
3.00
Pitot Tube
Details
       

 01-21-2017
2.30
Prep Left Wing
Details
       

 01-08-2017
2.10
Close Right Wing 7
Details
     

 01-07-2017
2.20
Close Right Wing 6
Details
     

 12-31-2016
2.10
Closing Right Wing 5
Details
     

 12-23-2016
2.20
Closing Right wing 4
Details
       

 12-17-2016
2.10
Closing Right Wing 3
Details
       

 12-11-2016
1.10
Closing Right wing 2
Details
       

 12-03-2016
1.40
Closing right wing
Details

 11-06-2016
1.10
Garlock install
Details
     

 11-05-2016
1.10
Upper right wing skins
Details
       

 10-23-2016
2.00
Cowling 3
Details
       

 10-01-2016
2.00
oil cooler
Details
       

 08-14-2016
1.30
Wing close up
Details
       

 07-30-2016
1.00
GPS Antenna
Details
     

 07-04-2016
1.00
Closing wings
Details
     

 06-22-2016
0.00
Life happened

 06-12-2016
1.10
Cowling 3
Details
       

 05-22-2016
1.00
Primed wing skins
Details

 04-10-2016
1.00
Primed wing skins
Details

 03-06-2016
1.00
Wing Skin Prime
Details

 02-28-2016
1.10
Cowling 2
Details
       

 02-27-2016
1.10
AHRS Shelf
Details
       

 02-21-2016
2.00
Fuel line from Engine pump
Details
       

 02-20-2016
2.30
Cable Comb
Details
       

 02-16-2016
0.80
Wing skins 1
Details

 02-06-2016
1.00
Cowling
Details

 02-04-2016
0.70
WIng skins
Details

 01-27-2016
3.00
Aileron rigging
Details
       

 01-23-2016
1.70
Firewall work
Details
       

 01-04-2016
1.00
Pitot Heat Wiring
Details
     

 01-03-2016
3.00
Elevator Bracket
Details
       

 12-31-2015
1.90
Exhaust plate
Details
       

 12-25-2015
2.20
Elevator Bell crank move
Details
       

 12-20-2015
3.10
Pitot Mast
Details
       

 12-13-2015
1.90
Dog Leash point
Details
       

 12-12-2015
2.40
Lightspeed Controller
Details
       

 12-06-2015
1.70
Manifold Pressure Sensor
Details
       

 11-14-2015
4.00
Moving Wings
Details
       

 11-08-2015
1.90
Ground Buss
Details
       

 11-07-2015
1.80
Intake Spacer
Details
       

 10-25-2015
2.10
Control cables
Details
       

 10-24-2015
0.60
Nose Wheel
Details
       

 10-21-2015
0.60
Fuel line
Details
       

 10-17-2015
1.10
Engine sensors
Details
       

 10-16-2015
0.50
Ground bus
Details
       

 10-14-2015
1.20
Elevator Trim
Details
       

 10-12-2015
0.40
Wiring the tail
Details
       

 10-11-2015
0.40
Headset Hanger
Details
     

 10-10-2015
0.00
Hangar 52F
Details
     

 09-15-2015
0.00
Fuselage is to the airport
Details
       

 09-11-2015
0.00
Movnig the fuselage
Details

 09-02-2015
0.90
Inspection hole doublers left wing
Details
       

 08-31-2015
1.00
Pillar Point Sensor
Details
       

 08-19-2015
1.30
Cowling tabs
Details
       

 08-16-2015
1.00
Slime Fighter
Details
     

 08-08-2015
0.60
Pressure Sensor Assembly
Details
     

 08-06-2015
0.30
Drill Sensor Manifold holes
Details
     

 08-02-2015
1.30
Front Bafflling
Details
       

 08-01-2015
1.10
Left fron Baffle cooling hole
Details
       

 07-30-2015
1.00
EGT Sensors
Details
       

 07-15-2015
0.50
CHT's
Details
       

 07-12-2015
1.20
Fuel sensor connectors
Details
       

 07-07-2015
0.90
Right wing wiring
Details
       

 07-03-2015
1.10
Right Wing electrical
Details
       

 06-14-2015
0.80
Main drain sump
Details
     

 06-07-2015
2.10
Cable retendtion brackets
Details
       

 06-06-2015
0.50
headset hanger
Details
     

 05-17-2015
2.30
Fuel line
Details
       

 05-16-2015
1.20
Main right tank
Details
       

 05-12-2015
1.00
Wing tips
Details
     

 05-10-2015
1.20
Configured Right vent lines
Details
     

 05-09-2015
1.50
Right aux tank fitting
Details
       

 05-08-2015
1.30
Right wing drain Aux sump
Details
       

 05-06-2015
1.00
Wing setup in TX
Details
     

 05-05-2015
1.00
Seat Pans
Details
       

 05-03-2015
0.10
Doggie attach bracket
Details
     

 04-30-2015
1.50
Seat adjust sliders 1
Details
       

 04-27-2015
1.40
Seat adjust sliders
Details
     

 04-26-2015
2.10
Seat Pans
Details
       

 04-25-2015
1.10
Control Sub Panel
Details
     

 04-16-2015
0.60
Routing rear cabeling
Details
     

 04-14-2015
1.40
Rear cargo area
Details
       

 04-13-2015
0.60
Rear tunnel nutplates
Details
     

 04-12-2015
0.90
Rear tunnel attach brackets
Details
       

 03-30-2015
0.80
Instrument Panel
Details
       

 03-26-2015
1.00
Torque the oil cooler lines
Details
       

 03-25-2015
0.90
Oil Cooler Lines
Details
     

 03-24-2015
0.80
Oil Coler line 1
Details
     

 03-19-2015
1.60
Rear Tunnel Cover 1
Details
       

 03-18-2015
1.80
Rear Tunnel Cover
Details
       

 03-17-2015
0.80
Exhaust Shield
Details
       

 03-16-2015
0.70
Rear Tunnel Cover
Details
       

 03-15-2015
2.30
Baffle glass work
Details
       

 03-14-2015
1.90
Remote box shelf
Details
     

 03-10-2015
1.00
Cabin hot ait inlet
Details
       

 03-08-2015
1.20
Upper Panel Mount Tabs
Details
     

 03-07-2015
0.60
Exhaust hangers
Details
       

 03-03-2015
0.60
Ground Cable
Details
       

 03-01-2015
0.40
Install the exhaust
Details
       

 02-28-2015
0.50
Install Exhaust
Details
       

 02-25-2015
0.40
Starter Cable
Details
       

 02-22-2015
2.30
Panel Bracing
Details
       

 02-21-2015
2.20
Fitting the panel
Details
       

 02-20-2015
0.60
Instrument Panel
Details
       

 02-11-2015
1.10
Exhaust #2
Details

 01-28-2015
0.30
Manifold pressure port
Details
     

 01-27-2015
1.30
Rear Baffle Support
Details
       

 01-25-2015
0.70
Right front baffle
Details
     

 01-24-2015
1.50
Front right baffle
Details
       

 01-20-2015
1.30
Autopilot servos
Details
       

 01-19-2015
0.70
Autopilot Tray
Details
     

 01-18-2015
1.10
Autopilot
Details
       

 01-17-2015
0.60
Cabin Fuel line
Details
       

 01-11-2015
0.60
Exhaust Hangers
Details
     

 01-04-2015
0.70
Tail wheel finished
Details
     

 01-03-2015
1.50
Tail wheel control cables
Details
       

 12-29-2014
1.20
Oil Door 2
Details
       

 12-24-2014
1.00
Oil Door 1
Details
       

 12-23-2014
1.10
Oil Door
Details
       

 12-20-2014
1.00
Battery box
Details
     

 12-16-2014
1.30
Front right baffle
Details
       

 12-14-2014
1.20
Aft left baffle
Details
       

 12-10-2014
0.60
Lasar II ignition wire
Details
       

 11-30-2014
2.10
Left aft baffle
Details
       

 11-28-2014
1.30
Sniffle Valve
Details
       

 11-26-2014
0.50
Ignition wires
Details

 11-24-2014
0.90
Fixing moving damage
Details
       

 11-12-2014
0.50
Engine work
Details
       

 11-07-2014
0.40
Engine Fittings
Details
       

 10-26-2014
0.30
Baffling
Details
       

 10-23-2014
1.30
Oil cooler bracket 2
Details
       

 10-22-2014
0.80
Oil cooler bracket 1
Details
       

 10-19-2014
0.90
Oil cooler bracket
Details
       

 10-16-2014
0.70
Filling the oil cooler hood 1
Details
       

 10-15-2014
0.70
Fitting the oil cooler hood
Details
       

 10-14-2014
0.80
Glassin the oil hood flanges
Details
       

 10-12-2014
1.30
Oil cooler hood
Details
       

 10-11-2014
1.30
Trimmed the Firewall Flanges
Details
       

 10-07-2014
1.20
Seal Firewall flanges
Details
       

 10-06-2014
0.00
Lights in the new shop
Details
       

 09-27-2014
0.00
Hardware setup
Details
       

 08-25-2014
1.40
Bird in its Texas nest
Details
       

 08-15-2014
0.00
Road Trip
Details

 08-14-2014
0.00
Loading the project in FL 1
Details
       

 08-14-2014
0.00
Loading the project in FL
Details
       

 06-18-2014
1.20
Cleaned out the hangar
Details
       

 06-17-2014
2.10
Firewall 8
Details
       

 06-16-2014
2.00
Firewall 8
Details
     

 06-15-2014
2.50
Firewall 7
Details
       

 06-14-2014
3.00
Firewall 7
Details
       

 06-08-2014
1.30
Firewall 6
Details
       

 06-07-2014
1.10
Firewall 6
Details
       

 06-03-2014
1.10
Firewall 5
Details
     

 05-27-2014
1.20
Firewall 4
Details
       

 05-26-2014
3.00
Firewall 3
Details
       

 05-25-2014
4.00
Firewall 2
Details
       

 05-24-2014
2.40
Firewall1
Details
       

 05-21-2014
1.30
Firewall Flanges
Details
       

 05-18-2014
3.00
Brake Work
Details
       

 05-17-2014
1.60
Prop control Bracket
Details
       

 05-08-2014
2.30
Back of the engine work
Details
       

 05-03-2014
2.10
Interior painting clean up
Details
       

 04-24-2014
5.00
Baggage door
Details
       

 04-23-2014
2.20
Nose wheel structure
Details
       

 04-22-2014
1.70
Painting fresh air vents
Details
       

 04-21-2014
1.90
Back on the wheels
Details
     

 04-20-2014
2.10
Rigging the elevators
Details
       

 04-19-2014
2.30
Aileron Cables
Details
       

 04-18-2014
2.20
Swaging the flap cables
Details
       

 04-17-2014
3.00
Flap Rigging
Details
       

 04-16-2014
1.90
Finishing the bagage area
Details
       

 04-12-2014
2.60
Fresh air vents
Details
       

 04-08-2014
1.70
Drill the right wing strut
Details
       

 04-07-2014
2.40
Attach right wing
Details
       

 04-05-2014
2.30
Drill the left strut
Details
       

 03-30-2014
1.30
Belly Seam
Details
       

 03-27-2014
2.00
Elevator pushrod 2
Details
       

 03-23-2014
1.40
Bleed Brakes 1
Details
       

 03-19-2014
1.40
Prep the cargo area for paint
Details
       

 03-17-2014
1.00
Left alieron 1
Details
     

 03-16-2014
0.60
Left alieron
Details
     

 03-15-2014
2.10
Attach the left wing
Details
       

 03-13-2014
1.30
Clearence for the elevator pushrod
Details
     

 03-11-2014
0.80
Elevator pushrod
Details
       

 03-10-2014
0.80
In the hangar
Details
       

 02-26-2014
1.10
Sanding strakes
Details
       

 02-25-2014
1.30
Throtle Panel
Details
       

 02-19-2014
0.80
Firewall Layout
Details
       

 02-18-2014
1.10
Baggage area finishing.
Details
       

 02-15-2014
2.10
Priming and Sanding
Details
       

 02-14-2014
0.90
Control Quadrant 1
Details
     

 02-13-2014
0.80
Fill and fairing baggage area
Details
       

 02-11-2014
1.80
Control Quadrant
Details
       

 02-09-2014
1.10
Service Bulliten #1
Details
       

 02-08-2014
2.50
Service Bulliten 70
Details
       

 02-05-2014
0.50
Footwell cover
Details
       

 02-04-2014
1.10
Floor Boards and Prop Extention
       

 01-30-2014
1.20
Nose Wheel & Forward Baffeling
Details
       

 01-26-2014
1.30
Rear Tunnel Fit
Details
       

 01-17-2014
0.50
Rear Tunnel
Details
       

 11-03-2013
2.00
Footwell cover
Details
       

 10-13-2013
1.20
Second set of footwell cover attach tabs
Details
       

 10-11-2013
0.80
First set of seatwell attach tabs
Details
       

 10-08-2013
1.20
Seatwell Cover
Details
       

 09-22-2013
1.50
Rear Footwell Cover
Details
       

 09-03-2013
0.30
Right Floorboard
Details
       

 07-07-2013
2.60
Floorboards
Details
       

 07-05-2013
2.30
Left cabin vent
Details
       

 07-01-2013
0.80
Forward Tunnel Cover #1
Details
     

 06-30-2013
1.10
Forward tunnel cover
Details
       

 06-27-2013
0.70
Baggage door latch
Details
       

 06-26-2013
0.80
Fuel sensor & gascolator
Details
       

 06-24-2013
1.10
Relays
Details
       

 06-23-2013
1.10
Lower aft cage attach tabs
Details
       

 06-21-2013
0.40
Right forward Baffleing #1
Details
     

 06-19-2013
0.50
Right forward baffling
Details
     

 06-17-2013
0.50
Crimping battery cable
Details
     

 06-12-2013
1.10
Engine Baffling #1
Details
       

 06-11-2013
1.00
Baffling
Details
       

 06-10-2013
1.10
Fuel lines #5
Details
       

 06-09-2013
0.90
Fuel lines #4
Details
       

 06-06-2013
0.30
Oil Filter Adaptor
Details
     

 06-05-2013
1.20
Fuel lines #3
Details
       

 06-04-2013
0.90
Fuel Lines #2
Details
       

 06-03-2013
1.10
Fuel Lines #1
Details
       

 06-02-2013
2.10
Fuel Lines
Details
       

 05-30-2013
0.40
Fiting the forward boost pump mount
Details
       

 05-28-2013
1.40
Engine Baffeling
Details
       

 05-27-2013
0.80
Fuel pump forward mount
Details
       

 05-25-2013
3.40
Hanging the engine
Details
       

 05-24-2013
1.20
Uncrating the engine
Details
       

 05-22-2013
0.70
Mounting the fuel pump
Details
       

 05-21-2013
0.00
The Engine Arrives!
Details
       

 05-20-2013
0.00
Manual Shelf
Details
     

 05-18-2013
2.30
Installing gear
Details
     

 05-17-2013
1.20
Fitting the faired right gear leg
Details
       

 05-09-2013
1.10
Left Gear Leg Fairing #1
Details
     

 04-15-2013
1.30
Left Gear Leg Fairing
Details
       

 04-08-2013
0.30
Right gear leg fairing
Details
     

 04-01-2013
1.20
Gear leg fairings
Details
       

 03-30-2013
6.00
Glassing the gear legs
Details
       

 03-23-2013
1.20
Swaging
Details
     

 03-22-2013
0.70
Set Pedal distance
Details
     

 03-21-2013
1.20
Prep for baggage door and rudder
Details
       

 03-19-2013
1.00
Baggage door
Details
       

 03-16-2013
3.50
Strakes
Details
       

 03-11-2013
10.00
Zach Visit
Details
       

 03-09-2013
2.30
Strakes
Details
       

 03-06-2013
0.60
Expanding foam
Details
       

 03-05-2013
0.60
Engine mount
Details
       

 02-21-2013
0.10
Jeff Skiles visit
Details
     

 02-19-2013
1.10
Front tunnel cover
Details
       

 02-18-2013
6.00
Drilling tail dragger gear
Details
       

 02-16-2013
0.70
Rigth side fuel feed line.
Details
     

 02-15-2013
0.10
The Jack
Details
       

 02-09-2013
0.80
Empanage Cables #1
Details
     

 02-04-2013
0.80
Empanage Cables
Details
     

 02-02-2013
2.10
Nose Gear
Details
       

 01-29-2013
1.80
Baggage door fitting
Details
       

 01-27-2013
3.10
Baggage door hinges
Details
       

 01-21-2013
1.90
Fuel Sumps
Details
       

 01-17-2013
2.00
Front passenger door
Details
       

 01-06-2013
2.30
Rear seat back
Details
       

 12-28-2012
5.00
Doors
Details
       

 12-17-2012
0.70
Seat belt holes
Details
     

 12-10-2012
1.00
Rear seat back
Details
       

 12-06-2012
0.30
Rear seat bracket
Details
     

 12-04-2012
0.60
Rear seat back lower brackets
Details
     

 12-01-2012
3.50
Brakes and Rear Seat Back
Details
       

 11-29-2012
1.10
Rear seat back
Details
       

 11-28-2012
0.70
Rear seat brackets lower
Details
       

 11-27-2012
0.50
Rear Seat backets top
Details
       

 11-20-2012
0.60
Cargo Floor #3
Details
     

 11-18-2012
0.50
Bleed Brakes
Details
     

 11-12-2012
0.80
Cargo Floor #2
Details
       

 11-11-2012
0.50
Cargo floor #1
Details
     

 11-03-2012
0.70
Cargo Floor
Details
     

 10-28-2012
2.80
Aft Tunnel #5
Details
       

 10-27-2012
2.10
Aft Tunnel #4
Details
       

 10-22-2012
1.80
Forward section of aft tunel
Details
       

 10-21-2012
1.40
Forward section of tunnel
Details
     

 10-15-2012
0.80
Rear Tunnel #3
Details
     

 10-14-2012
0.90
Rear Seat Belt Brackets
Details
       

 10-11-2012
0.50
Tunnel Walls
Details
     

 10-10-2012
0.30
Sump Doublers
Details
     

 10-07-2012
2.10
Rear Tunnel #2
Details
       

 10-02-2012
0.70
Foot Well Cover
Details
     

 10-01-2012
1.60
Cable Tunnel #1
Details
       

 09-30-2012
1.10
Cable Tunel
Details
       

 09-24-2012
1.40
Rear Seat Belts
Details
       

 09-23-2012
2.10
Triming wing struts
Details
       

 09-12-2012
0.80
Parking Brake valve
Details
       

 09-09-2012
1.20
Cockpit Fuel plumbing
Details
       

 09-06-2012
1.10
Fuel Valve
Details
       

 08-26-2012
1.30
ELT Shelf #1
Details
       

 08-20-2012
0.70
Parking brake Valve
Details
     

 08-19-2012
1.10
ELT Shelf
Details
       

 08-14-2012
0.60
Transponder Cable
Details
       

 08-11-2012
0.40
Cockpit fuel plumbing
Details
     

 08-09-2012
1.70
Fiberglass Party
Details
       

 08-08-2012
1.70
Firewall
Details
       

 08-07-2012
1.60
Landing light holes #1
Details
     

 08-06-2012
1.30
Landing light holes
Details
       

 08-04-2012
2.30
Cargo Tabs
Details
       

 08-02-2012
1.30
Cargo Tab
Details
       

 07-27-2012
0.00
Deposit
Details

 07-10-2012
0.90
Side walls
Details
     

 07-09-2012
0.80
Tunnel cover
Details
     

 07-08-2012
1.30
Cargo Ribs
Details
       

 07-07-2012
1.10
Cargo area
Details
       

 07-05-2012
1.70
Gear leg Fairings #3
Details
       

 07-04-2012
2.60
Gear Leg Fairing #2
Details
       

 06-29-2012
0.50
Seat Pins #1
Details

 06-27-2012
1.30
Seat Pins
Details
       

 06-27-2012
0.50
Seat Backs
Details
       

 06-26-2012
2.10
Gear Leg Fairings #1
Details
       

 06-24-2012
0.40
Gear Leg Fairings
Details

 06-23-2012
0.90
Brakes #1
Details
     

 06-12-2012
1.40
Brakes
Details
       

 06-10-2012
2.10
Nose wheel Bushings
Details
       

 06-09-2012
1.40
Left Wheel
Details
       

 06-05-2012
0.90
Painting Wheel hardware
Details
       

 06-04-2012
0.90
Jack Point #1
Details
       

 06-03-2012
6.10
Jack Points
Details
       

 06-01-2012
0.00
Joe Marconi Drilli Jig
Details
       

 05-31-2012
0.70
Header tanks
Details
     

 05-30-2012
1.40
Wing hardware
Details
       

 05-29-2012
1.60
Left Brake Flange
Details
       

 05-28-2012
5.70
Set Right Main
Details
       

 05-27-2012
2.70
Mounting Main Gear
Details
       

 05-26-2012
7.30
Setting Gear
Details
       

 05-24-2012
1.70
Nose gear
Details
       

 05-23-2012
0.70
Nose Main #4
Details
     

 05-22-2012
0.30
Parking brask
Details
     

 05-21-2012
1.40
Nose Gear Mains
Details
       

 05-20-2012
2.10
Brake Masters
Details
       

 05-19-2012
1.80
Nose Axle and bearings
Details
     

 05-16-2012
1.10
Nose wheel
Details
       

 05-13-2012
3.20
Transponder antenna #1
Details
       

 05-12-2012
3.10
Transponder Antenna
Details
       

 05-06-2012
1.80
Rudder Bumps
Details
     

 05-05-2012
2.10
Grey Primer Day
Details
       

 04-30-2012
1.20
bulkhead A pullies
Details
       

 04-28-2012
1.90
Rear Seat
Details
       

 04-27-2012
1.40
Tail wheel #1
Details
       

 04-22-2012
2.10
Rudder Pedal bumps
Details
       

 04-21-2012
1.00
Tail Wheel
Details
     

 04-15-2012
3.00
Landing Gear #2
Details
       

 04-14-2012
3.00
Landing Gear #1
Details
       

 04-09-2012
1.40
Landing Gear
Details
       

 04-03-2012
0.40
Hub lugnuts
Details
       

 04-01-2012
1.30
Aileron stops
Details
       

 03-31-2012
1.30
Aileron cable guides
Details
       

 03-26-2012
1.40
Flap cable guides
Details
       

 03-24-2012
1.30
Passenger door
Details
       

 03-19-2012
1.10
Passenger door
Details
       

 03-12-2012
1.40
aft control cable brackets
Details
       

 03-11-2012
2.30
Forward pulley assembly
Details
       

 03-05-2012
1.10
Aft control cable brackets
Details
     

 03-04-2012
1.30
Rudder pedal half round
Details
       

 03-03-2012
2.30
Rudder Pedal half round
Details
       

 03-02-2012
1.10
Forward pulley cluster
Details
       

 02-25-2012
0.90
Bulkhead A #6
Details
       

 02-24-2012
2.30
Bulkhead A #5
Details
       

 02-23-2012
1.40
Bulkhead A #4
Details
     

 02-22-2012
1.10
Bulkhead A #3
Details
     

 02-20-2012
2.10
Bulkhead A #2
Details
       

 02-19-2012
2.20
Bulkhead A #1
Details
       

 02-17-2012
1.20
Bulkhead A
Details
       

 02-12-2012
1.10
Bulkhead A Alignment
Details
       

 02-09-2012
0.90
Tail cone
Details
       

 02-05-2012
5.00
Aft shearweb
Details
       

 01-29-2012
1.90
Aft Shearweb #3
Details
     

 01-28-2012
2.50
Aft Shearweb#2
Details
       

 01-26-2012
1.40
Aft Shearweb #1
Details
       

 01-25-2012
0.90
Aft Shearweb
Details
       

 01-24-2012
0.90
Tailwheel #2
Details
       

 01-22-2012
0.50
Tailwheel
Details
       

 01-21-2012
1.20
Buklhead E nutplates
Details

 01-20-2012
1.30
BH E forward glass
Details
       

 01-19-2012
0.30
Wing strut pivots
Details
     

 01-18-2012
0.60
Qcell fillet for BH E
Details
       

 01-17-2012
0.60
BH E Aft glass
Details
       

 01-16-2012
3.50
Bulkhead E
Details
     

 01-12-2012
0.40
Cut Bulkhead E glass
Details
     

 01-10-2012
0.80
Air Inlet
Details
       

 01-08-2012
3.20
Cage attach hardware
Details
       

 01-07-2012
3.50
Rear Fuselage Attach points
Details
       

 12-27-2011
4.00
Cable Guards
Details

 12-23-2011
0.70
Tail wheel forward spring attach
Details
       

 12-22-2011
0.80
Aft upper cage attach
Details
       

 12-21-2011
1.10
Rear cage struts
Details
       

 12-20-2011
1.00
Cable Guards/ Nose Gear bushings
Details
       

 12-16-2011
1.10
Baggage Door
Details
       

 12-15-2011
0.70
Baggage Door
Details
     

 12-14-2011
1.10
Shearweb nutplates
Details
     

 12-13-2011
1.30
Door Hinges
Details
       

 12-12-2011
1.40
Shearweb brackets
Details
       

 12-11-2011
3.40
Horzontal Stab Shim
Details
       

 12-10-2011
3.20
Cable Guards
Details
       

 12-08-2011
0.70
Cut cable guards
Details

 12-06-2011
0.70
Cable guards
Details

 12-05-2011
0.40
Cut Cable Guard
Details

 12-04-2011
3.10
cable guards
Details
     

 12-03-2011
2.30
Forward shear web
Details
       

 12-01-2011
0.70
HS shim
Details
     

 11-30-2011
1.20
Attached brakes
Details
       

 11-29-2011
0.40
Brake master cylinder
Details
     

 11-28-2011
0.40
Brake Pedals
Details
     

 11-27-2011
6.80
Rudder Pedals
Details
       

 11-26-2011
2.10
Flap Handle
Details
       

 11-25-2011
4.00
Set the Horizontal Stab
Details

 11-24-2011
0.50
finish the forward shearweb
Details
       

 11-23-2011
0.40
Prime Forward Shearweb
Details
       

 11-22-2011
1.80
Forward Shearweb #2
Details
       

 11-21-2011
0.40
Forward Shearweb #1
Details
       

 11-20-2011
3.40
Forward shearweb
Details