Powered By Kitlog Pro v2.0
Schroeders Sportsman
Sportsman 2+2
Final Assembly
Work Logs Found:
168
Category Work Time:
391 Hours
Date
Hours
Work Log Summary
Details
10-30-2019
1.50
Seaqling Baffling #1
Details
10-27-2019
4.00
Finiashed Door closeouts
Details
10-26-2019
4.00
Door Close Outs
Details
10-25-2019
2.00
Overhead cable covers
Details
10-13-2019
4.00
Stick grip wiring
Details
10-12-2019
6.00
Wing strut wire roouting
Details
10-11-2019
1.00
Wint root wires
Details
10-09-2019
3.00
Glasreshield install
Details
10-06-2019
4.00
Glareshield tab installation
Details
10-05-2019
5.00
Struct to Wing fairing install
Details
10-03-2019
1.00
Glareshiled prep
Details
10-02-2019
1.00
Sanding the wing to strut fairings
Details
09-30-2019
1.00
Wing to strut finishing
Details
09-29-2019
6.00
Tail Cone Inspection Hole
Details
09-28-2019
6.00
Cable Comb
Details
09-23-2019
2.00
Right wing tip fitting
Details
09-22-2019
6.00
fuel pump wiring.
Details
09-21-2019
6.00
Inboard Delta Wings
Details
09-08-2019
1.00
Refurb'd master brake
Details
09-07-2019
2.00
Birthday work
Details
09-02-2019
3.00
Prepped the servos
Details
08-25-2019
2.00
Priming for delta wings
Details
08-24-2019
4.00
Tech Consular visit
Details
08-20-2019
1.00
Primer Prep
Details
08-18-2019
3.00
Brake Leak
Details
08-17-2019
4.00
Securing Tail Wiring
Details
08-11-2019
4.00
Overhead cable cover
Details
08-08-2019
2.00
second tail cone
Details
08-04-2019
4.00
Fitting wing tips
Details
08-03-2019
4.00
Stick Grips Complete
Details
07-21-2019
3.00
Laying out Stick Grips
Details
07-20-2019
3.00
Barking Brake final install
Details
07-14-2019
3.00
Door cotter pining
Details
07-13-2019
3.00
Right aileron
Details
07-10-2019
1.00
Reinforced Elevator Fairing
Details
07-08-2019
2.00
Right Door
Details
07-07-2019
3.00
Aileron counterweights
Details
07-06-2019
3.00
Right Aileron
Details
07-05-2019
4.00
Left flap cove skin
Details
07-04-2019
4.00
Cove skins #2
Details
07-02-2019
1.00
Left flap cove skins
Details
06-29-2019
3.00
Cove skin inspection panels
Details
06-27-2019
3.00
Left airleron cove skin
Details
06-26-2019
4.00
Finishing Cove skins
Details
06-24-2019
1.30
Priming wing fold hatch covers
Details
06-23-2019
4.00
Aileron cove skins #1
Details
06-22-2019
3.00
Aileron Cove Skins
Details
06-21-2019
3.00
Riveting the radio stack
Details
06-19-2019
1.00
Registration to the FAA
Details
06-16-2019
3.00
Bending cove skins
Details
06-15-2019
3.00
Cove Skin doublers
Details
06-12-2019
1.00
Cove skin fitting
Details
06-09-2019
3.00
Control sticks
Details
05-18-2019
3.00
Glareshield
Details
04-27-2019
3.00
Shaping the elevator coutner weight
Details
04-22-2019
2.00
New flap bellcrank
Details
04-21-2019
2.00
Trimming my carbon
Details
04-20-2019
4.00
Panel Back in the bird
Details
03-26-2019
2.10
Panel work
Details
03-17-2019
0.80
Seat back reassembled
Details
03-16-2019
2.50
Control Stick install
Details
03-15-2019
2.00
First seat install
Details
03-12-2019
1.00
Switch Panel
Details
03-10-2019
2.00
Wing hatch sanding
Details
03-08-2019
1.30
Priming panel
Details
03-03-2019
2.00
Sub Panels
Details
03-02-2019
1.50
Tail fairing antichafe
Details
02-26-2019
0.50
Tail Fairing
Details
01-27-2019
3.00
Tensioning Cables
Details
01-26-2019
3.50
Ailerons Rigged
Details
01-19-2019
1.00
Bulkhead A leather 3
Details
01-14-2019
1.00
Bulkhead A leather 2
Details
01-13-2019
1.00
Bulkhead A leather 1
Details
01-12-2019
1.00
Bulkhead A leather
Details
12-28-2018
0.90
Fitting Bulkhead A
Details
12-23-2018
1.90
Bulkhead A Closeout
Details
10-29-2018
0.40
Painted the headset jack cover
Details
10-28-2018
3.50
Fold hatch covers
Details
10-27-2018
3.50
Glassing Hatch fold covers
Details
10-24-2018
1.00
Main cabin headset jack cutout
Details
10-21-2018
3.00
Main cabin headset cover
Details
10-20-2018
3.00
resecuring the ailerons
Details
10-13-2018
3.00
hi temp cowling paint
Details
10-12-2018
2.00
Bonding the servo tab
Details
10-07-2018
3.00
Initial folding hatch work
Details
10-01-2018
0.50
Headset jack plate
Details
09-29-2018
2.00
Elevator Fairings 1
Details
09-25-2018
1.20
Belly Ports
Details
09-23-2018
3.30
Elevator Fairings
Details
09-22-2018
3.20
EMag MP routing
Details
09-15-2018
25.00
Filling the cowling
Details
09-08-2018
1.00
Baffeling
Details
09-01-2018
1.50
Upper Cowling
Details
08-19-2018
3.00
Left main door window
Details
08-18-2018
1.40
Windo prep
Details
07-28-2018
2.10
P Mag harness
Details
07-21-2018
3.00
Fairings day
Details
07-15-2018
2.70
Mag P Lead
Details
07-08-2018
3.00
Window Prep
Details
07-07-2018
3.80
First Window
Details
06-23-2018
4.00
Drilled the wing fold hatches
Details
06-18-2018
1.30
Panel Accesories
Details
06-09-2018
3.00
Sanding
Details
06-05-2018
2.00
Filler s my life2
Details
05-26-2018
2.30
Instlled the tail cone
Details
05-19-2018
4.00
Sanding and filling
Details
05-12-2018
1.50
finishing the tail cone
Details
05-11-2018
2.00
Panel Sanding
Details
05-05-2018
3.60
Fiberglass day
Details
04-28-2018
0.30
wire diagram and flying
Details
04-21-2018
2.60
Mounting the AIRINC 429 box
Details
04-19-2018
0.50
Expiremental
Details
04-07-2018
2.30
Sanding the tail
Details
03-18-2018
2.60
Delta Wings
Details
03-17-2018
3.20
Electric trim cover
Details
03-16-2018
2.00
Horizontal fairings
Details
03-03-2018
2.80
Terminal stripe wiring
Details
02-24-2018
2.00
Tail fairing
Details
02-18-2018
2.00
Paint Prep
Details
02-06-2018
0.00
Front seats
Details
01-21-2018
2.00
Last Plastic
Details
12-18-2017
2.00
Left Horizontal fairiing
Details
12-10-2017
2.00
Right Horizontal tip fairing
Details
12-08-2017
1.20
Glareshield
Details
11-22-2017
1.00
Seats
Details
07-15-2017
2.10
Relays
Details
05-05-2015
1.00
Seat Pans
Details
05-03-2015
0.10
Doggie attach bracket
Details
04-30-2015
1.50
Seat adjust sliders 1
Details
04-27-2015
1.40
Seat adjust sliders
Details
04-26-2015
2.10
Seat Pans
Details
02-22-2015
2.30
Panel Bracing
Details
02-21-2015
2.20
Fitting the panel
Details
02-20-2015
0.60
Instrument Panel
Details
01-17-2015
0.60
Cabin Fuel line
Details
07-07-2013
2.60
Floorboards
Details
07-05-2013
2.30
Left cabin vent
Details
07-01-2013
0.80
Forward Tunnel Cover #1
Details
06-30-2013
1.10
Forward tunnel cover
Details
05-18-2013
2.30
Installing gear
Details
05-17-2013
1.20
Fitting the faired right gear leg
Details
05-09-2013
1.10
Left Gear Leg Fairing #1
Details
04-15-2013
1.30
Left Gear Leg Fairing
Details
04-08-2013
0.30
Right gear leg fairing
Details
04-01-2013
1.20
Gear leg fairings
Details
03-30-2013
6.00
Glassing the gear legs
Details
02-21-2013
0.10
Jeff Skiles visit
Details
07-05-2012
1.70
Gear leg Fairings #3
Details
07-04-2012
2.60
Gear Leg Fairing #2
Details
06-29-2012
0.50
Seat Pins #1
Details
06-27-2012
1.30
Seat Pins
Details
06-27-2012
0.50
Seat Backs
Details
01-24-2012
0.90
Tailwheel #2
Details
01-22-2012
0.50
Tailwheel
Details
01-19-2012
0.30
Wing strut pivots
Details
12-15-2011
0.70
Baggage Door
Details
12-11-2011
3.40
Horzontal Stab Shim
Details
12-08-2011
0.70
Cut cable guards
Details
12-05-2011
0.40
Cut Cable Guard
Details
11-30-2011
1.20
Attached brakes
Details
10-26-2010
0.90
Elevator Stop
Details
08-18-2010
1.60
Control Yoke #1
Details
08-17-2010
1.30
Contol Yoke
Details
04-27-2010
0.70
Rudder Pedal Brackets
Details
04-26-2010
1.40
Rudder Pedals #2
Details
04-23-2010
1.30
Rudder Pedals #1
Details
04-22-2010
0.60
Left Rudder Bracket
Details
04-20-2010
0.40
Rudder Pedals
Details
SITE NAVIGATION
Contact Builder
Sportsman 2+2 Home
Category
# Logs
# Hours
All
1325
2478
Aileron
61
104
Avionics
58
78
Elevator
98
137
Engine
65
83
Final Assembly
168
391
Flap
39
86
Fuselage
312
580
Horizontal Stab
47
82
Horizontal Stab Elev
47
82
Miscellaneous
54
54
Parts
1
2
Rudder
24
55
Systems
87
134
Wings
264
610
Copyright © 2001-2019 Matronics. All Rights Reserved.