Powered By Kitlog Pro v2.0
Bruce's airplane project
RV-7A
Fuselage
Work Logs Found:
76
Category Work Time:
253 Hours
Date
Hours
Work Log Summary
Details
09-21-2008
2.50
Engine mount attached
Details
09-06-2008
4.00
Main gear axle nut cotter pin
Details
08-16-2008
15.00
Canopy fitting
Details
08-09-2008
7.00
Landing gear wheel/brake assembly
Details
06-01-2008
3.00
Canopy - the BIG cut
Details
05-26-2008
2.00
Canopy second cut
Details
05-18-2008
1.50
Canopy skirt strips
05-17-2008
2.50
Canopy first cut
Details
05-15-2008
2.00
ELT, strobe pack mounts added
Details
05-04-2008
2.00
Copilot control stick restraint
Details
04-26-2008
16.00
Tip-up canopy lift strut mount re-design
Details
03-16-2008
8.00
Canopy tilt-up strut fitting
Details
02-24-2008
12.00
Tip-up canopy framing progress
Details
01-20-2008
3.50
Canopy lock linkage, tip-up frame
01-12-2008
4.00
Canopy external latch
Details
01-01-2008
6.00
Canopy release mechanism fitted
Details
12-08-2007
4.00
Autopilot pitch servo installation
Details
12-05-2007
2.00
Finish kit arrives
Details
11-23-2007
2.50
Installed crotch belt anchors
Details
11-10-2007
4.00
Mounted panel eyeball vents
Details
11-03-2007
3.50
Electric aileron trim installation
Details
10-27-2007
3.00
Electric aileron trim assembly
Details
10-06-2007
4.00
Fabricated brake lines
Details
07-15-2007
2.00
Attached NACA air vent pickups
Details
03-04-2007
1.50
Fabricated fuel tank vent lines
Details
02-28-2007
6.00
Fuel line,vent plumbing
01-28-2007
2.00
fuel pump installed
01-27-2007
1.50
Fuel selector assembly
01-25-2007
1.00
Seat harness anchors attached
01-24-2007
1.50
Brake cylinder plumbing
01-16-2007
3.00
Added throttle brackets, rear bulkhead
12-10-2006
5.00
Horizontal stab tip fabrication
Details
11-30-2006
4.00
Fabricated and installed rudder stop
Details
11-11-2006
2.00
Ongoing H/V stabilizer mounting work
11-10-2006
1.00
Panel layout mockups
Details
10-30-2006
2.00
Horizontal stabilizer attach
10-21-2006
4.00
Instrument panel framing
10-08-2006
2.50
Forward fuselage trim bracket fabrication
Details
10-07-2006
3.00
Instrument panel trial assembly
Details
09-23-2006
3.50
Top skin and canopy frame added
09-10-2006
3.00
Canopy frame complete
09-09-2006
3.00
Canopy framing, Elevator horn drilling
09-07-2006
2.00
Roll bar construction continues
Details
09-05-2006
3.00
Canopy frame work
09-01-2006
2.50
Canopy frame brackets fabricated
08-26-2006
4.00
Trial wing attachment
Details
08-17-2006
1.50
Temporary landing gear struts built
Details
08-16-2006
2.00
Starboard landing gear mount attached
08-15-2006
1.50
Port landing gear mount attached
08-09-2006
1.00
Match drilled landing gear legs to mount
08-06-2006
2.00
Modified fuselage stand
Details
08-06-2006
2.00
flap motor housing installed
08-05-2006
2.00
flap motor installed
08-03-2006
3.00
Flap linkage installation ongoing
07-29-2006
3.00
Began electric flap installation
07-28-2006
3.00
Fabricated center console
07-22-2006
3.50
Installed baggage compartment floor
Details
07-11-2006
8.00
External Steps Mounted
Details
07-08-2006
1.50
Prepared baggage area floor and sides
06-29-2006
1.50
Fabricated and installed elevator bellcrank
06-26-2006
5.50
Fabricated elevator pushrods
Details
06-22-2006
1.00
Brake pedals painted
Details
06-20-2006
2.00
Copilot seatback brace mounted
06-18-2006
2.00
Seatbacks primed
06-17-2006
5.00
Brake pedals mounted, copilot seatback fabricated
06-15-2006
2.00
Rudder pedals mounted
06-13-2006
1.00
Added pilot-side seatback brace
Details
06-11-2006
6.50
Fabricated pilot side seat back
Details
06-08-2006
1.50
Rudder pedal, seat back work
Details
06-05-2006
1.00
Added F-665 to control column
06-04-2006
2.00
Installed control column base
06-03-2006
1.50
Right rudder pedal, F601K fabricated
06-02-2006
1.50
Left rudder pedal fabricated
05-31-2006
1.00
Bracket F-6122-1 added to firewall
Details
02-16-2006
4.00
Fuselage stand built
Details
02-13-2006
3.00
QB wings/fuselage delivered
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
226
549
Empennage
79
140
Fuselage
76
253
Shop Supplies
8
12
Wings
63
144
Copyright © 2001-2025 Matronics. All Rights Reserved.