KitLog pro

Powered By Kitlog Pro v2.0

Bruce's airplane project
' style=
Date:  12-10-2006
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Horizontal stab tip fabrication

Lots of time/fussing to get these fabricated and attached. Intend to balance each elevator individually and then again as a pair before rivetting these on. Added a nutplate to the inside of the counterbalance should painting/final assembly bring about the need to add more weight.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.