Powered By Kitlog Pro v2.0
Mikes Web Site
Savannah S
Engine
Work Logs Found:
67
Category Work Time:
195 Hours
Date
Hours
Work Log Summary
Details
05-22-2020
8.00
Cowl doors
Details
04-13-2020
5.00
Cooling Exit Air
Details
04-02-2020
2.00
Cooling Experiment
Details
02-27-2020
4.00
New Cylinder Rings
Details
02-24-2020
4.00
Valve Lapping
Details
02-22-2020
2.00
Valve Inspection
Details
02-21-2020
6.00
Low Compression Issue
Details
01-18-2020
3.00
Internal cowl flap
Details
11-02-2019
4.00
Lower Cowl Door
Details
11-02-2019
2.00
Lower cowl door
Details
11-01-2019
6.00
Nosebowl installation
Details
10-19-2019
4.00
Splitting the Nosebowl
Details
10-18-2019
4.00
Nose bowl sides
Details
10-05-2019
1.00
New valve cover installed
Details
10-05-2019
3.00
Cowl fiberglass work
Details
10-04-2019
2.00
Modified valve cover
Details
10-04-2019
1.00
Modified Cowling
Details
10-04-2019
1.00
Getting Committed
Details
09-28-2019
3.00
Lower Cowl Mod
Details
09-27-2019
2.00
Cabin heat mod
Details
08-23-2019
1.00
Cooling test flight
Details
08-10-2019
2.00
Cooling Challenges
Details
01-28-2019
4.00
Cowling final installation
Details
01-05-2019
4.00
Painted Cowl parts
Details
10-20-2018
8.00
Cabin heat muff
Details
10-19-2018
1.00
Little things
Details
10-19-2018
1.00
Fuel flow test 2
Details
10-16-2018
1.00
carb heat muff installation
Details
10-15-2018
2.00
Carb heat muff
Details
10-06-2018
3.00
Fuel lines
Details
10-06-2018
1.00
Carb heat muff SS
Details
09-14-2018
4.00
Carb heat muff
Details
07-28-2018
3.00
Nosebowl in primer
Details
07-21-2018
2.00
Nosebowl inlet rings
Details
07-20-2018
2.00
Fuel Flow testing
Details
07-14-2018
1.00
Prop Track check
Details
05-29-2018
4.00
Cowling access doors and spinner
Details
05-28-2018
14.00
Cowling design and fabrication
Details
05-14-2018
2.00
First engine run
Details
05-11-2018
2.00
Temp Air scoop
Details
05-04-2018
2.00
Nosebowl fitting
Details
04-20-2018
3.00
Fuel delivery system
Details
04-06-2018
4.00
Mixture control
Details
03-31-2018
3.00
Throttle cable installation
Details
03-24-2018
1.00
Ignition Coil Cooler
Details
03-17-2018
1.00
Starter wiring
Details
03-17-2018
1.00
EGT probes
Details
03-16-2018
2.00
Oil / Air separator
Details
03-09-2018
3.00
Ignition
Details
02-16-2018
2.00
Oil line and pre-oil
Details
02-16-2018
1.00
Exhaust manifold
Details
02-15-2018
4.00
Intake manifold and baffles
Details
02-03-2018
1.00
Rear Alternator installation
Details
02-03-2018
1.00
Engine Installation
Details
02-02-2018
2.00
Engine Assembly
Details
01-27-2018
1.00
New head bolt installation
Details
12-16-2017
2.00
engine tear down
Details
12-15-2017
2.00
Head bolt torque failure
Details
12-09-2017
2.00
Cylinder head installation
Details
12-02-2017
2.00
Pistons and Cylinders
Details
12-01-2017
2.00
install piston/cylinder combination
Details
11-18-2017
1.00
Engine core uncrated
Details
05-12-2017
1.00
Engine arrival
Details
11-06-2015
4.00
Corvair core is shipped
Details
02-27-2015
6.00
Bare engine core
Details
07-12-2014
2.00
Engine tear down
Details
06-27-2014
10.00
Engine Core Prep
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Savannah S Home
Category
# Logs
# Hours
All
238
783
Avionics
6
16
Empennage
24
103
Engine
67
195
Fuselage
71
264
Miscellaneous
22
60
None
4
16
Prop
2
4
Shop Supplies
1
2
Tools
2
15
Wings
39
108
Copyright © 2001-2025 Matronics. All Rights Reserved.