KitLog pro

Powered By Kitlog Pro v2.0

Mikes Web Site
Work Logs Found: 67
Category Work Time: 195 Hours
 Date
Hours
Work Log Summary

Details

 05-22-2020
8.00
Cowl doors
Details
       

 04-13-2020
5.00
Cooling Exit Air
Details
       

 04-02-2020
2.00
Cooling Experiment
Details
       

 02-27-2020
4.00
New Cylinder Rings
Details
       

 02-24-2020
4.00
Valve Lapping
Details
       

 02-22-2020
2.00
Valve Inspection
Details
       

 02-21-2020
6.00
Low Compression Issue
Details
       

 01-18-2020
3.00
Internal cowl flap
Details
       

 11-02-2019
4.00
Lower Cowl Door
Details
       

 11-02-2019
2.00
Lower cowl door
Details
       

 11-01-2019
6.00
Nosebowl installation
Details
       

 10-19-2019
4.00
Splitting the Nosebowl
Details
       

 10-18-2019
4.00
Nose bowl sides
Details
       

 10-05-2019
1.00
New valve cover installed
Details
       

 10-05-2019
3.00
Cowl fiberglass work
Details
       

 10-04-2019
2.00
Modified valve cover
Details
       

 10-04-2019
1.00
Modified Cowling
Details
       

 10-04-2019
1.00
Getting Committed
Details
       

 09-28-2019
3.00
Lower Cowl Mod
Details
       

 09-27-2019
2.00
Cabin heat mod
Details
       

 08-23-2019
1.00
Cooling test flight
Details
       

 08-10-2019
2.00
Cooling Challenges
Details
       

 01-28-2019
4.00
Cowling final installation
Details
       

 01-05-2019
4.00
Painted Cowl parts
Details
       

 10-20-2018
8.00
Cabin heat muff
Details
       

 10-19-2018
1.00
Little things
Details
     

 10-19-2018
1.00
Fuel flow test 2
Details
     

 10-16-2018
1.00
carb heat muff installation
Details
       

 10-15-2018
2.00
Carb heat muff
Details
       

 10-06-2018
3.00
Fuel lines
Details
       

 10-06-2018
1.00
Carb heat muff SS
Details
       

 09-14-2018
4.00
Carb heat muff
Details
       

 07-28-2018
3.00
Nosebowl in primer
Details
       

 07-21-2018
2.00
Nosebowl inlet rings
Details
     

 07-20-2018
2.00
Fuel Flow testing
Details
       

 07-14-2018
1.00
Prop Track check
Details
       

 05-29-2018
4.00
Cowling access doors and spinner
Details
       

 05-28-2018
14.00
Cowling design and fabrication
Details
       

 05-14-2018
2.00
First engine run
Details
     

 05-11-2018
2.00
Temp Air scoop
Details
       

 05-04-2018
2.00
Nosebowl fitting
Details
       

 04-20-2018
3.00
Fuel delivery system
Details
       

 04-06-2018
4.00
Mixture control
Details
       

 03-31-2018
3.00
Throttle cable installation
Details
       

 03-24-2018
1.00
Ignition Coil Cooler
Details
       

 03-17-2018
1.00
Starter wiring
Details
       

 03-17-2018
1.00
EGT probes
Details
     

 03-16-2018
2.00
Oil / Air separator
Details
       

 03-09-2018
3.00
Ignition
Details
       

 02-16-2018
2.00
Oil line and pre-oil
Details
       

 02-16-2018
1.00
Exhaust manifold
Details
       

 02-15-2018
4.00
Intake manifold and baffles
Details
       

 02-03-2018
1.00
Rear Alternator installation
Details
       

 02-03-2018
1.00
Engine Installation
Details
       

 02-02-2018
2.00
Engine Assembly
Details
       

 01-27-2018
1.00
New head bolt installation
Details
       

 12-16-2017
2.00
engine tear down
Details
       

 12-15-2017
2.00
Head bolt torque failure
Details
       

 12-09-2017
2.00
Cylinder head installation
Details
       

 12-02-2017
2.00
Pistons and Cylinders
Details
       

 12-01-2017
2.00
install piston/cylinder combination
Details
       

 11-18-2017
1.00
Engine core uncrated
Details
       

 05-12-2017
1.00
Engine arrival
Details
       

 11-06-2015
4.00
Corvair core is shipped
Details
       

 02-27-2015
6.00
Bare engine core
Details
       

 07-12-2014
2.00
Engine tear down
Details
       

 06-27-2014
10.00
Engine Core Prep
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.