DOUGs Web Site

Builder:
DOUG WEHRLY
Location:
New Braunfels, TX - USA
Aircraft:
The Airplane Factory - Sling 2
Engine:
100-110 hp -
Prop:
Warp Drive - 3-Blade, 72" - Fixed
Total Build Time:
305 Hours


March 25, 2018: Project Start

This is my first airplane kit that I have started building. Many moons ago I bought an early Lancair rudder kit and decided very quickly that I'm not into fiberglass, epoxy and micro balloons. Then not too long ago I bought a Sonex Waiex tail kit, and never started on it as I wasn't sure if it was the right plane for me so I sold it.

In 2015 I ran across the TAF Sling while researching kits again and decided that's my kind of airplane so I bought most of the kits for the Sling 2 (minus wings, finishing kits). It sat in the garage for 3 years as life got in the way, but now I am committed to the build and have carved out a big block of time for this project.

My rough plan is to have the plane ready for engine and avionics by May 2019. I'm really enjoying working on this kit.

Recent Activity
 Date Hours Work Log Summary Details
 06-18-2018
1.0
Reworked And Riveted Steps
Details
       

 06-18-2018
3.0
Avionics Panel Layout In CAD
Details
       

 06-17-2018
1.0
Rudder Stop Adjustments
Details
       

 06-17-2018
0.5
Installed Wiring For Magnetometer
Details
       

 06-16-2018
1.0
Rudder Cable Hook-up And Test
Details
       

 06-16-2018
1.0
Misc Interior Riveting
Details
       

 06-15-2018
1.5
Mounted Vertical Stabilizer
Details
       

 06-15-2018
1.0
Cockpit Cleanup And Seat Belt Mounts
Details
       

 06-14-2018
0.7
Inside Cocpit Riveting 2
Details
       

 06-14-2018
0.8
Inside Cockpit Riveting
Details
       