KitLog pro

Powered By Kitlog Pro v2.0

Wendells RV-6A
' style=
Date:  5-17-2013
Number of Hours:  1.00
Manual Reference:  Tunnel work
Brief Description:  Fit 7A Tunnel in the 6A - 5

It all fit together perfectly in the airplane. Had trouble with one forward cover screw being a little tight, but it goes through 3 independent parts and there is always some slack play in all parts when fitting together. Got it done. Fitted the line from the selector to the filter and the line from the firewall to the red cube together but did not final tighten those two yet. I will be removing this all when I add electrical, and possibly brake tubing. For something that looks so simple, this was challenging for me. Now that I'm done, I look back and question why that was. I guess it was because there were no plans for doing this. It was all Mods. And, as someone else once wrote, when you start modifications, you will add significant time to your build. He was right.
' style=

Seat pan structure in place. Side supports in place. Selector in place.

Seat pan structure in place. Side supports in place. Selector in place.

' style=

Pump-Red Cube platform in place and connected.

Pump-Red Cube platform in place and connected.

' style=

Forward tunnel cover in place. Pump cover in place.  All screws in place.

Forward tunnel cover in place. Pump cover in place. All screws in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.