After the Iong process of drilling the initial fairing attach holes #40, then #30, I positionied and drilled the various nutplates, enlarged the holes to accept 8/32 machine screws(#19 bit). All were dimpled except along the wing walk top. Those were countersunk. Lots of work, but its done.