KitLog pro

Powered By Kitlog Pro v2.0

Wendells RV-6A
' style=
Date:  3-5-2011
Number of Hours:  5.00
Manual Reference:  New Flaps Arrive
Brief Description:  Make two new flaps

The new flap parts arrived. I began by marking and circle cutting the lightening holes in the flap spars. 26 holes. Then edge smooth all holes, all flange edges, and round the corners. Finally, cut the 1/8 inch slope on the inboard end of each flap spar. That prepares them for the flap attach hardware which I need to make tomorrow.
' style=

Vans did an excellent job with packing.  No damage.  Everything was there.

Vans did an excellent job with packing. No damage. Everything was there.

' style=

2 1/4 inch diameter holes set on a pattern of 5 1/2

2 1/4 inch diameter holes set on a pattern of 5 1/2", 6",3,3,6,3,3,6,3,3,6,3,3.

' style=

Work completed.  On to the flap attach hardware.

Work completed. On to the flap attach hardware.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.