Powered By Kitlog Pro v2.0
Toms RV9-A project
RV-9A
14 - Phase 1 Testing
1-1-2014
< Previous Log Entry
Next Log Entry >
Date:
1-1-2014
Number of Hours:
2.00
Manual Reference:
Brief Description:
First Test Flight
Completed Two Test flights. Fixed Airspeed pitot problem and calibrated AOA. Airspeed was reading zero. Upon investigation, the manual incorrectly indicates the Pitot tube. Reversed tubes and tested. AOA set in flight.
Take Off Video
Landing Video
The real thing is better
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
615
1246
01- Why RV-9
2
02- Shop
10
27
03- Empennage
56
112
04 - Wings
73
172
05- Fuselage
121
238
06 - Gear & Fairing
27
68
07 - Firewall Fwd
70
150
08 - FAB
8
19
09- Tip-Up Canopy
69
152
10 - Cowl & Baffle
38
88
11 - Avionics
79
173
12 - Registration
7
8
13 - Training
2
6
14 - Phase 1 Testing
11
18
15 - RV Trips
1
2
99 - Miscellaneous
41
13
Copyright © 2001-2024 Matronics. All Rights Reserved.