KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  10-7-2012
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Drilled top and bottom cowling piano hinge

Measured and drilled two piano hinges for the left and right side piano hinge that holds the top and bottom cowling together. Installed the top hinge with rivets and epoxy on both sides. Fitted and partially drilled the bottom holes.
Mounted the hinge plate for the oil filler access door with rivets and epoxy.
' style=

right side cowling

right side cowling

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.