Brief Description: Cleocoed the Upper Forward Fuselage
Drilled and clecoed the center hat and center support to the forward fuselage deck. Fabricated the canopy seal strips, drilled and clecoed the F-768C seal strips to the F-768A and F-7688 sub-panel. Installed forward skin and clecoed and drilled through the short arm rib and the center rib support.
Special thanks to Steve for assiting throughout this part of the assembly.