Powered By Kitlog Pro v2.0
Toms RV9-A project
RV-9A
03- Empennage
11-28-2010
< Previous Log Entry
Next Log Entry >
Date:
11-28-2010
Number of Hours:
3.50
Manual Reference:
Brief Description:
Pop Rivet vertical and horizontal stabilizer fairi
Did some final epoxy work for a few of the fairings overnight and sanded down with 220 grit sandpaper. Pop riveted the rudder, horizontal and vertical stabilizer fairings.
vertical stabilizer fairing installed
rudder fairing installed
pilot horizontal stabilizer fairing installed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
615
1246
01- Why RV-9
2
02- Shop
10
27
03- Empennage
56
112
04 - Wings
73
172
05- Fuselage
121
238
06 - Gear & Fairing
27
68
07 - Firewall Fwd
70
150
08 - FAB
8
19
09- Tip-Up Canopy
69
152
10 - Cowl & Baffle
38
88
11 - Avionics
79
173
12 - Registration
7
8
13 - Training
2
6
14 - Phase 1 Testing
11
18
15 - RV Trips
1
2
99 - Miscellaneous
41
13
Copyright © 2001-2024 Matronics. All Rights Reserved.