KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  9-22-2013
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Drilled Left Gear Leg Cotter Pin

Raised the fuselage off the mains and installed the gear nut so that there was no side play and the tire rotated on the bearings freely. Drilled holes and installed cotter pin.
' style=

Left Gear Cotter Pin installed

Left Gear Cotter Pin installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.