KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  8-25-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Fuselage final routing and bundling.

The fuselage wiring was a mess in the avionics bay, so I spent a lot of time pulling wires around and getting them organized and bundled. Replaced my original 24 tab grounding block and replaced with a 48 tab grounding block. I decided to run all electronics with separate grounds to the avionics bay rather than using the airframe as a ground. A bit more work but I will not need to be concerned about ground loops, noise or poor grounding.

Ran the remaining Wiring in the wings / Fuselage:

1) HID Landing Lights Ground (Left & Right Wing)
2) Roll Servo Wiring and DB-9 assembly (Right Wing)
3) Fuel Sensor grounds (Left & Right Wing).
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.