KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  12-18-2010
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Cabin Frame Assembly Day 1

Started reviewing the plans for the Cabin Assembly. This is specific to the tip-up model and I spend about a hour reviewing the plans and measuring the outside edge distance on the fuselage. Plans v.s. actual fuselage width was about 1/16:" off vs plans. I did some minor grinding to the center channels to get the exact width and height. Clamped down the entire assemlby on my work table and drilled the joining plate and clecoed.
' style=

Isometric view of Cabin Assembly

Isometric view of Cabin Assembly

' style=

Fabricated Cabin Assembly parts

Fabricated Cabin Assembly parts

' style=

Clamped and drilled center plate

Clamped and drilled center plate

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.