KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  3-6-2010
Number of Hours:  2.00
Manual Reference:  8-1, DWG19
Brief Description:  Drill, Prime and Rivet brake line bracket (F-6122)

Matched drilled and deburred the F-6122-1 brake line bracket. This will hold the fittings that connect the flexible brake line hose from the master cylingers to the solid brake lines leading to the wheels.

Machine countersunk and primed the bracket,

Countersunk firewall skin with 3/8" Avery pop rivet dimplers.

Riveted using AN426AD3-4 flush head solid rivets.

Last time I riveted or used an air drill was with the Empennage kit in Aug 2009. This was the first part I installed on the kit.
' style=

Braket Drilled, primed and Clecoed

Braket Drilled, primed and Clecoed

' style=

Riveted Bracket

Riveted Bracket

' style=

Firewall side flush rivets

Firewall side flush rivets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.