KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  9-19-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Crotch Strap assembly

Reamed out both press bushing in the hooker harness crotch strap for an AN4 bolt. Made up a spacer for the proper spacing for the belt using two paint stir sticks. Sandwitched the assembly together with cleco clamps and test fit in the fuselage. Started drilling #40 holes for the pop rivets and ran into trouble with my cheap angle drill kit. Went online to Avery and ordered a better angle drill so I can get into the tight spot. Put that on hold for the time being and decided to fabricate the rudder attach links in prep for installing the rudder cables. Got the stock angle out for the rudder stops and began to mark them up for fabrication.
' style=

crotch strap assembly with spacers

crotch strap assembly with spacers

' style=

test fit install in fuselage

test fit install in fuselage

' style=

Rudder attach links

Rudder attach links

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.