Date:  8-10-2013
Number of Hours:  3.50
Manual Reference:  
Brief Description:  OAT Sensor Wiring

I cutoff the pre-crimped pins on the primary and secondary OAT sensors and soldered the extended wiring inside the cabin. The wires are run from the ADHARS behind the baggage area inside the right side center tunnel conduit to a terminal block located on the left side seat ribs under the removable seat pan covers. Connected Both OAT sensors and configured and tested the Skyview.
Both sensors are within 1 degree of each other on both the primary and backup AHDARS units.
' style=

OAT reading properly (Right bottom)

OAT reading properly (Right bottom)

' style=

Terminal Block mounting

Terminal Block mounting