KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  8-4-2013
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Drilled holes for Nose Weel fairing tow bar

Ordered a tow bar earlier in the week from ACS and drilled holes through the nosewheel fairing for the tow bar.

Installed the left and right brackets on the fairing while it was not on the fork. Got a piece of aluminum tube 3/4" and used as a hole locator by cutting the tube to the inside length of the fairing and then using a sharpie marking from the outside where the tube laid flush across both brackets. Drilled pilot hole then enlarged with a stepped drill bit.

For now I will remove the fairing until later in phase one flight testing.
' style=

Holes for Tow bar completed

Holes for Tow bar completed

' style=

Close Up

Close Up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.