KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  3-10-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Started Wiring Engine Monitor

Drilled holes through the finrewall and used a SS 2/3" pass through fitting. Started running the EGT/CHT probe wires and supported the probes using Adel clamps and the lower rocker cover panel on each side.Reviewed Dynon plans and started running wires to their intended location on the engine.
' style=

Wiring from the Engine Monitor

Wiring from the Engine Monitor

' style=

Rocker covers supporting EGT/CHT

Rocker covers supporting EGT/CHT

' style=

Rocker covers supporting EGT/CHT

Rocker covers supporting EGT/CHT

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.