KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  9-10-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Packing Main Wheel Bearings

Did the same procedure with the main wheels. Next step was to install the innertubes and mount the tires on the rims. Used baby powder and partially filled the tubes to make sure there was no kinks in the tube. Mated both risms and installed bolts. Filled the tires several times to ensure that the tubes were not pinched.
' style=

split main wheels with repacked bearings

split main wheels with repacked bearings

' style=

Finished wheel assembly

Finished wheel assembly

' style=

all three wheels done

all three wheels done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.