KitLog pro

Powered By Kitlog Pro v2.0

Toms RV9-A project
' style=
Date:  1-8-2012
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Passenger Side Baffle prep

Started the right side baffle. Clecoes, drilled, dimpled aluminum. Installed hose adapter for cabin heat on the baffle and prosealed, installed screening and riveted together. Cut hole for spark plug pass through.

All will be taken apart, primed and riveted together then installed.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.