KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  5-25-2013
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Fabricate Forward Lift Strut, Ball Stud Mounts. 2.

After drilling the holes I tapped the center hole to accept the Ball Stud. The other 2 holes are drilled using a small #27 instead of the required larger #21. Why. You need to match drill the fuselage through these and I didn't want to screw up the holes due to drill bit wobble while match drilling. I'll enlarge them to #21 after drilling them to the fuselage.
' style=

Tap for Lift Strut Ball Stud

Tap for Lift Strut Ball Stud

' style=

Ready to drill to fuselage.

Ready to drill to fuselage.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.