KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  3-10-2013
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Install Steps. Prep and prime Steps. 10

Spent a good amount of time sanding the steps down to bar metal. Lots of dust. I use the respirator to avoid breathing all that dust. Then a small priming session. They look very nice.
' style=

Hang to dry after acid wash.

Hang to dry after acid wash.

' style=

Steps are primed.

Steps are primed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.