KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  11-29-2012
Number of Hours:  0.00
Manual Reference:  
Brief Description:  1/2" Hole instrument Panel for jettison Handle.

Lots of discussion on the net about the Canopy Jettison Handle. Should it be installed per plans. The handle, per drawings, is accessible on the instrument panel. You’ll find lots of alternative ideas and designs on builder logs.
What will I do? Can you guess? Yep, I'll install the jettison Handle per plans. Mr. Van will be so proud of me. He yelled at me the last time I suggested a design change to his design. Installing per plans requires a 1/2” hole drilled in your instrument panel. That is what I'm doing here. Yes, again I'm using the metal lathe to cut the hole. I like the precise positioning of the work piece with the 3 axis adjusting wheels. Over kill I know. I just like using it.
' style=

1/2

1/2" Hole for jettison Handle.

' style=

1/2

1/2" Hole for jettison Handle.

' style=

1/2

1/2" Hole for jettison Handle.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.