Powered By Kitlog Pro v2.0
Eds Vans RV-6A/7A Web Site
RV-7A
Fuselage
2-24-2010
< Previous Log Entry
Next Log Entry >
Date:
2-24-2010
Number of Hours:
0.00
Manual Reference:
Brief Description:
Join fore/aft F-721 canopy decks
Time to join the fore and aft canopy decks. The little tab on the aft deck gets bent and then match drilled to the foreword deck.
Image 3 shows he fore/aft canopy decks and gussets dimpled and finished off ready for priming.
Not shown is counter sinking the forward canopy deck holes in the longerons.
Bend forward tab on aft deck.
Match drill tab through forward deck.
Canopy deck resady fro primming.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Aerolite 103 Home
RV-6A Home
RV-7A Home
Category
# Logs
# Hours
All
1249
0
Empennage
63
Finish Kit
134
Finishing Kit
134
Flap Actuator
20
Fuselage
509
Hole Fixing
5
Miscellaneous
6
Personel
13
Roll Bar
57
Seat Back
24
Shop
13
Tools
40
Wing Cradle
4
Wing Hardware
2
Wing Jig
7
Wings
218
Copyright © 2001-2024 Matronics. All Rights Reserved.