KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  8-9-2008
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Pro-Sealed a few tank things

I Pro-Sealed -
1.) Inside and outside edge of the inspection plate flange.
2.) Inspection plate flange nutplates.
3.) Out board rib tooling hole.
4.) Fuel sender BNC connector.
5.) Flop tube rubber end.
6.) Out board sender plate wire connector.
7.) A few ribs that looked like they needed a bit more.

Next I'll install -
1.) Sender plates and wires.
2.) Vent and return line tubing.
3.) End ribs.
4.) Baffles.
5.) Z brakets.
6.) Inslection plate.

Crap, will these tankes ever be done.
' style=

Inside of inspection plate flange Pro-Sealed.

Inside of inspection plate flange Pro-Sealed.

' style=

Out Bd fuel sender connector Pro-Sealed.

Out Bd fuel sender connector Pro-Sealed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.