KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  3-19-2008
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Gas tank stiffener fabrication. Part 2.

After the belt sander, these guys are ready for the final step of edge smoothing. The Scotch bright wheel does a great job. I do at least 3 passes. First pass straight on the edge, The second and third I get the corners of the edge.
' style=

3 passes per edge.

3 passes per edge.

' style=

Tank stiffeners are done.

Tank stiffeners are done.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.