KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  10-15-2009
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Drill F-695 Gusset to Fuseage.

I thought it would be a problem aligning the drill, drilling upward instead of waiting until the fuselage is flipped. It turned out to be OK. Turned out to be easy work and I had good alignment in both axis. Drilled first with a #40, then the larger #30.

Before I drilled I took time to see how my edge distance was going to turn out on the weldment and longeron. Sure don’t want regrets here for sure.

On the left side I pushed the gusset slightly inboard about 1/32” to get good edge distance on the weldment. I have a full ¼” of material on the weldment and 3/16” on the longeron. I think I went inboard a bit too much.

On the right I got 3/16” on the weldment and ¼” on the longeron just the opposite of the left side. Well, left and right have slightly different edge margins but both are acceptable and I’m good with it.
' style=

Drilling was easy. Use Boelube.

Drilling was easy. Use Boelube.

' style=

Happy with hole location.

Happy with hole location.

' style=

Happy with gusset fit.

Happy with gusset fit.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.