Squeezed the 2 bulkheads together. Flush rivets on the aft side. I drilled the 4 holes that attach the tie down but will rivet later. The other 4 holes holding the tie down go through the vertical stab spar. 2 of them have to go through the stab hinge. I'll drill those later.