Date:  4-8-2009
Number of Hours:  0.00
Manual Reference:  
Brief Description:  F-706 BH - Future rivet fix.

So, seems the choice is to grind away some of the 729 flange or make shims. I've chosen the shim method. 2 Shims are required. Eash shim is 0.03 thick.

These current shims are an inch wide. I may make them narrower when it's time to use them. But, I'll keep them the full inch width at the platenut location.

The rivets are just sitting in the holes. I actuall will not need these guys for a long while. I just didn't want to rivet up this bulkhead not knowing how I would solve this problem later. I mean, if the plan was to grind away at the flange then it should be done now before riveting.

So, I'm good. Thanks to Paul Dannebrock for responding to my VansAirforce fourm question.

Update- Don't to this. Just grind away some flange to make room for the rivet head. See 9-22-09 entry.