KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  2-26-2009
Number of Hours:  0.00
Manual Reference:  
Brief Description:  F-705 BH - Drill 705G angle.

Bulkhead is level on the bench and my drill handle has level bubbles. Ready to drill as in image 1.

First, you drill the 9 holes straight down as in image 2. Cleco as you go.
Second, you drill the 4 remaining holes horazontally.
' style=

Drill vertical first.

Drill vertical first.

' style=

9 holes, wow.

9 holes, wow.

' style=

Drill horazontal second.

Drill horazontal second.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.