KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  1-13-2009
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Fuselage - Organize hardware part 2.

Now that the rivets are done I'll do the remaining hardware.
I ended up using 7 bug boxes. I got 4 from Lowells and 3 from home depot. I like the ones from Lowells better. Each bug box compartment has a loose label with the part number. Feels good to be organized.

Doing invontory is helpfull in that you get use to part numbers and part descriptions.

It actually took several days to invontory the kit. Your would think it would feel like a waste of time because your not building but I actually enjoyed the process. The Fuse kit is packed as a bunch of smaller sub kits and makes invontory easy.

I basically have a box for -
1.) Bolts
2.) Screws
3.) Nuts
4.) Washers
5.) Blue hose connectors
6. and 7.) Misc.

Stephanie was a big help sorting and checking off parts from the list. She was into it, didn't have to ask for help or talk her into it. She saw me doing it and just joined in and basically took control. Invontory is done. Time to start building.
' style=

All layed out.

All layed out.

' style=

Stored away.

Stored away.

' style=

Oh good, done.

Oh good, done.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.